Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.7 LAccepted-AOC BASANTPUR KEDLA DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹2.7 L | L-1 | Accepted-AOC Accept |
| 2 | L-2₹2.7 LRejected-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | ₹2.7 L | L-2 | Rejected-AOC Reject |
| 3 | L-3₹2.7 LRejected-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹2.7 L | L-3 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | TRIBHUWAN ENTERPRISES L3 | TRIDEO CONSTRACTION L1 | CHAHAT CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|---|
| 1.00 | Shifting of Iron & steel items at site for work as above said. | 5.62 | MT | 1,380 ₹7,748.70 | 1,360 ₹7,636.40 | 1,365 ₹7,664.48 |
| 2.00 | Dismantling of conveyor belt drive, tail bend, T&H snub pulley gear box (4.867+2.3096+1.450+4.632+3.450+4.310 takeup arrangement =20.805MT | 20.8 | MT | 2,150 ₹44,730.75 | 2,123 ₹44,169.01 | 2,125 ₹44,210.62 |
| 3.00 | Dismantling of T. arrangement and columan lining 60.% of new 5.615X60%=3.369MT | 3.37 | MT | 5,580 ₹18,799.02 | 5,563 ₹18,741.75 | 5,565 ₹18,748.49 |
| 4.00 | Fabrication & erection of guide channel arrangement as above said works. | 5.62 | MT | 10,850 ₹60,922.75 | 10,743 ₹60,321.94 | 10,800 ₹60,642 |
| 5.00 | Re-installation & alignment after work as above said. (5.408+2.096+4.632+3.450+4.310=21.346MT) | 21.35 | MT | 4,280 ₹91,360.88 | 4,245 ₹90,613.77 | 4,250 ₹90,720.50 |
| 6.00 | Shifting of old materials to scrap yard. | 3.37 | MT | 1,380 ₹4,649.22 | 1,360 ₹4,581.84 | 1,365 ₹4,598.69 |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹2.7 L
EMD Value
₹3,400
Closing Date
26 Jun 2025, 6:00 pmClosed
Sumit Kumar
Kedla Washery, Hazaribagh Area, CCL
Loosening dismantling of conv. Belt 330mtr. 1000mm width for 02 nos. damaged joint made by cold vulcanized, drive pulley lagging, gear box, oil seal changing ... unit 303 belt conveyor of main plant of KW
2025_CCL_337567_1
PO/KW/E-TENDER/25-26/03
Open Tender
Miscellaneous Works
12 days
Kedla Washery, Ramgarh
As per NIT
2 documents required · 2 mandatory
₹3,400
25 Apr 2026
14 Jun 2025
27 Jun 2025
16 Jun 2025
26 Jun 2025
16 Jun 2025
16 Jun 2025 - 21 Jun 2025
Amount
Shifting of Iron & steel items at site for work as above said.
Dismantling of conveyor belt drive, tail bend, T&H snub pulley gear box (4.867+2.3096+1.450+4.632+3.450+4.310 takeup arrangement =20.805MT
Dismantling of T. arrangement and columan lining 60.% of new 5.615X60%=3.369MT
Fabrication & erection of guide channel arrangement as above said works.
Re-installation & alignment after work as above said. (5.408+2.096+4.632+3.450+4.310=21.346MT)
Shifting of old materials to scrap yard.
Total impact of GST for the purpose of CTC
CHAHAT CONSTRUCTION COMPANY (BID ID -1162721)
TRIBHUWAN ENTERPRISES (BID ID -1161527)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_349938.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid