| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-AOC HAZARIBAGH JHARKHAND | HAZARIBAGH | JHARKHAND | 825301 | ₹1.1 Cr | 1 | Accepted-AOC WORK ALLOTTED TO GHANSHYAM MAHTO, PABRA, NEAR JAMA MASJID, KATKAMSANDI, HAZARIBAG AND AGREEMENT DONE |
| 2 | 2₹1.1 Cr+₹1.1 L (1.03%)Rejected-AOC HAZARIBAG | HAZARIBAGH | JHARKHAND | 825301 | ₹1.1 Cr+₹1.1 L (1.03%) | 2 | Rejected-AOC WORK ALLOTTED TO GHANSHYAM MAHTO, PABRA, NEAR JAMA MASJID, KATKAMSANDI, HAZARIBAG AND AGREEMENT DONE |
| 3 | 3₹1.1 Cr+₹2.5 L (2.39%)Rejected-AOC GRAM HARLI DARU HAZARIBAGH | ₹1.1 Cr+₹2.5 L (2.39%) | 3 | Rejected-AOC WORK ALLOTTED TO GHANSHYAM MAHTO, PABRA, NEAR JAMA MASJID, KATKAMSANDI, HAZARIBAG AND AGREEMENT DONE |
| 4 | 4₹1.1 Cr+₹3.0 L (2.81%)Rejected-AOC | ₹1.1 Cr+₹3.0 L (2.81%) | 4 | Rejected-AOC WORK ALLOTTED TO GHANSHYAM MAHTO, PABRA, NEAR JAMA MASJID, KATKAMSANDI, HAZARIBAG AND AGREEMENT DONE |
| 5 | 5₹1.1 Cr+₹6.2 L (5.91%)Rejected-AOC DR ZAKIR HUSSAIN ROAD BARA BAZAR HAZARIBAGH | HAZARIBAGH | HAZARIBAGH | JHARKHAND | ₹1.1 Cr+₹6.2 L (5.91%) | 5 | Rejected-AOC WORK ALLOTTED TO GHANSHYAM MAHTO, PABRA, NEAR JAMA MASJID, KATKAMSANDI, HAZARIBAG AND AGREEMENT DONE |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
13 Apr 2026, 5:00 pmClosed
EXECUTIVE ENGINEER, NREP, HAZARIBAG
EXECUTIVE ENGINEER, NREP, HAZARIBAG
Upgradation work of Rajkiya Utkarmit Middle School, Pelawal Hindi Katkamsandi 1, Block - Katkamsandi, District - Hazaribag
2026_NREPH_112463_1
NREP/HAZARIBAG/07/2025 - 26 (GROUP NO. - 02)
Open Tender
Civil Works
Percentage
365 days
KATKAMSANDI, HAZARIBAG
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
Yes
₹3.0 L
14 Aug 2026
6 Apr 2026
15 Apr 2026
6 Apr 2026
13 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in excavation in foundation trenches in hard soil (vide classification of soil item - A+B ) and disposal of excavated earth as obtained to a distance up to 50M including all lifts with leveling, ramming the foundtion trenches, removing roots of trees, shrubs all complete as per approved design, specification and direction of E/I B.C.D.S.O.R No 5.1.1 | - | M3 | - | - |
| - | Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) B.C.D.S.O.R No 5.1.2 | 1 | M3 | - | - |
| - | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. lead and disposal of unserviceable materials with all leads all complete as per direction of E/l. | 1 | M3 | - | - |
| - | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M. lead and disposal of unserviceable materials with all leads all complete as per direction of E/l. | 1 | M3 | - | - |
| - | Dismantling R.C.C.work including stacking serviceable materials in countable stacks within 15M. lead and disposal of unserviceable materials with all leads all complete as per direction of E/l. | - | M3 | - | - |
| - | Disposal of building rubbish - Carraige of Earth - 1Km lead | - | M3 | - | - |
| - | Filling in foundation trenches and plinth in layers. Not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume) 5.1.8 | 1 | M3 | - | - |
| - | Watering and consolidation of earth laid in 150mm to 225mm layers by manual labour with C.I Hammer to achieve minimum 85% of maximum dry density including supply of water necessary tools and plants with all leads and lifts all complete as per specification and direction of E/I. W.R.D 7.1.38 | 1 | M3 | - | - |
| - | Clearing Grass and Removal of Rubbish 2.02 (Common ) | - | Ha | - | - |
| - | Providing sand filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all load and lifts including cost of all materials, labours, royelty and taxes all complete as per building specification & direction of E/I B.C.D.S.O.R No 5.1.10 | - | M3 | - | - |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
TENDER_DOCUMENTS_07_02.pdf
Tender Documents • 1.05 MB
BOQ_151849.xls
BOQ • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .