| 1 | L1₹3.0 CrAdmitted-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹10.3 L (3.43%)Admitted-Finance | ₹3.1 Cr+₹10.3 L (3.43%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 Cr+₹11.1 L (3.67%)Admitted-Finance NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | ₹3.1 Cr+₹11.1 L (3.67%) | L3 | Admitted-Finance |
| 4 | L4₹3.2 Cr+₹18.6 L (6.15%)Admitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹3.2 Cr+₹18.6 L (6.15%) | L4 | Admitted-Finance |
| 5 | L5₹3.5 Cr+₹43.7 L (14.5%)Admitted-Finance KULLANDI STREET M PALLIPATTI POST METTUR TALUK SALEM DISTRICT 636 458 | METTUR | SALEM | TAMIL NADU | 636458 | ₹3.5 Cr+₹43.7 L (14.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M s Kumaresan and co L4 | GUHANSANJEEVI ENTERPRISES L2 | C.PERIYASAMY L5 | MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED L1 | JD ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Conducting check survey, pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead, lift etc., complete. | 13 | Loc. | 3,000 ₹39,000 | 1,500 ₹19,500 Lowest | 2,000 ₹26,000 | 2,170 ₹28,210 | 25,000 ₹3,25,000 |
| 2.00 | Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete.for foundation. In Hard gravelly soil | 1,883 | m3 | 100 ₹1,88,300 Lowest | 190 ₹3,57,770 | 100 ₹1,88,300 Lowest | 250 ₹4,70,750 | 120 ₹2,25,960 |
| 3.00 | Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete.for foundation. In soft distengrated rock not requiring blasting | 290 | m3 | 150 ₹43,500 | 290 ₹84,100 | 50 ₹14,500 Lowest | 250 ₹72,500 | 120 ₹34,800 |
| 4.00 | Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete.for foundation. In medium rock and dense medioum rock requiring blasting | 290 | m3 | 300 ₹87,000 | 370 ₹1,07,300 | 50 ₹14,500 Lowest | 250 ₹72,500 | 500 ₹1,45,000 |
| 5.00 | Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete.for foundation.Hard rock requiring Blasting | 290 | m3 | 800 ₹2,32,000 | 790 ₹2,29,100 | 50 ₹14,500 Lowest | 250 ₹72,500 | 500 ₹1,45,000 |
| 6.00 | Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete.for foundation.Hard rock requires wedging & chessling | 145 | m3 | 1,000 ₹1,45,000 | 1,300 ₹1,88,500 | 50 ₹7,250 Lowest | 250 ₹36,250 | 1,000 ₹1,45,000 |
| 7.00 | Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour, fuel, oil, transport,T&P etc., complete. | 460 | Hrs | 10 ₹4,600 Lowest | 100 ₹46,000 | 10 ₹4,600 Lowest | 50 ₹23,000 | 10 ₹4,600 Lowest |
| 8.00 | Providing shoring and shuttering during excavation and concreting works using country wood planks and scantlings including cost of all materials ,labour charges, lead and lift etc., complete as directed by the Engineer incharge at site. | 630 | m2 | 10 ₹6,300 Lowest | 130 ₹81,900 | 10 ₹6,300 Lowest | 50 ₹31,500 | 10 ₹6,300 Lowest |
| 9.00 | Fixing of templates, stub and cleat for GR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. | 3 | Loc | 15,000 ₹45,000 | 20,000 ₹60,000 | 10,000 ₹30,000 Lowest | 17,320 ₹51,960 | 30,000 ₹90,000 |
| 10.00 | Fixing of templates, stub and cleat for KSR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. | 5 | Loc | 30,000 ₹1,50,000 | 32,000 ₹1,60,000 | 15,000 ₹75,000 Lowest | 25,640 ₹1,28,200 | 50,000 ₹2,50,000 |
Tender Value
Refer Docs
EMD Value
₹3.3 L
Closing Date
1 Mar 2024, 2:30 pmClosed
CE/TP-I/CNI
O/o the Chief Engineer/Transmission Projects -I / Chennai, 3rd Floor , 230 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32.
Fabrication, Supply, Erection of Towers, foundation concreting work and stringing of 110KV SC line on 230KV DC Towers with panther conductor from Hosur 230KV SS in the Existing Yerrandahalli feeder, conversion of 230 KV SC line on SC tower into 230KV
2024_EB_426796_1
TP1-79/2023-24
Open Tender
Civil Works
Works
180 days
zuzuvadi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.3 L
Yes
28 Jun 2024
17 Feb 2024
2 Mar 2024
17 Feb 2024
1 Mar 2024
17 Feb 2024
Amount
Conducting check survey, pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead, lift etc., complete.
Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete.for foundation. In Hard gravelly soil
Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete.for foundation. In soft distengrated rock not requiring blasting
Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete.for foundation. In medium rock and dense medioum rock requiring blasting
Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete.for foundation.Hard rock requiring Blasting
Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete.for foundation.Hard rock requires wedging & chessling
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour, fuel, oil, transport,T&P etc., complete.
Providing shoring and shuttering during excavation and concreting works using country wood planks and scantlings including cost of all materials ,labour charges, lead and lift etc., complete as directed by the Engineer incharge at site.
Fixing of templates, stub and cleat for GR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
Fixing of templates, stub and cleat for KSR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
Fixing of templates, stub and cleat for DD tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
Fixing of templates, stub and cleat for CZ tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
Fixing of templates, stub and cleat for MD tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
Fixing of templates, stub and cleat for KCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
PCC 1:3:6 using 20mm metal for Retaining wall and tower foundation without formwork including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete.
RCC 1:1.5:3 using 12 to 20mm HBG metal for foundation frustum and chimney concrete with form work including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete.(Excluding Cost of Steel Reinforcement )
PCC1:2:4 using 12 to 20 mm HB stone for foundation with steel formwork including cost of cement, all materials, labour,lead,lift,curing, consolidation using vibrators,hire charges for T& P etc complete for chimney,muffing and coping
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete.
Refilling with excavated earth, watering and consolidation including watering, consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Removal of surplus earth in a low lying area to a average distance of 200m by head load as directed by the Engineer at site.
Supply and fixing of earthing to towers including cost of all materials all lead and lift etc., complete.
Plastering with C.M 1:3 12mm thick for muffing coping concrete including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete.
Labour charges for Erection of MS Steel tower parts etc as per drawing including sorting out at site , erection, tightening , punching , final checking, providing holes wherever necessary and final checking etc., complete including cost of all labour charges etc., complete.
Labour charges for Erection of Multi circuit tower parts etc as per drawing including sorting out at site , erection, tightening , punching , final checking, providing holes wherever necessary and final checking etc., complete including cost of all labour charges etc., complete.
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Labour charges for transporting and hoisting of 7 units of 90 KN suspension insulators for Panther and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. As directed by the Engineer at site.
Labour charges for transporting and hoisting of 13 units of 90 KN suspension insulators including cost of transporting from store to site al tools and plants etc complete.As directed by the Engineer at site.
Labour charges for transporting and hoisting of 8 units of 120 KN single tension insulator strings including all cost of labour,lead, lift, T & P etc complete. As directed by the Engineer at site.
Labour charges for transporting and hoisting of 14 units of 120 KN tension insulators including cost of transporting from store to site al tools and plants etc complete.As directed by the Engineer at site.
Labour charges for transport of 3 Nos. of Panther conductor paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. ( For Span )
Labour charges for transport of 3 Nos. of Panther conductor paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. ( For Kms )
Labour charges for transport of 7/3.55mm GI earthwire fixing of GI earthwire hardwares (ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading ,lead, lift, cost of T&P, etc complete. ( For Span )
Labour charges for transport of 7/3.55mm GI earthwire fixing of GI earthwire hardwares (ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading ,lead, lift, cost of T&P, etc complete. (For Kms )
Labour charges for transport of 3 Nos. of ACSR Zebra conductor paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. ( For Span )
Labour charges for transport of 3 Nos. of ACSR Zebra conductor paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. ( For KM )
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead, lift, etc., complete.
Providing temporary guys wherever necessary including excavation, buryingout of anchor for staywire, tightening, dismantling the same after completion of works including cost of all materials, lead, lift, labour, etc., complete.
Providing well supported upto 5 m trussels for Highways, Telepohone lines crossings during paying out,rough sagging and tensioning of power conductors and earth wire including cost of bamboo, coir and labour for excavation etc., complete.
Painting with best quality of anti-corrosive black paint for a height of 45cm from the top level of coping including cost of paint all labor etc., complete.
Clearing heavy Juliflora jungle without uprooting for carrying out the stringing works.
Labour charges for cutting, uprooting and romoving of various type large trees from the line including the hire charges for T & P etc. complete
Labour charges for cutting, uprooting and romoving of various type small trees from the line including the hire charges for T & P etc. complete
Supply,Tranporting and fixing of Single Suspension fittings for Zebra conductor as per design drawing and specifications.
Supply,Tranporting and fixing of single tension fittings for Zebra conductor as per design drawing and specifications.
Supply,Tranporting and fixing of SB damber for Zebra conductor as per design drawing and specifications.
Supply,Tranporting and fixing of Midspan joint for Zebra conductor as per design drawing and specifications.
Supply,Tranporting and fixing of Repair sleeve for Zebra conductor as per design drawing and specifications.
Supply,Tranporting and fixing of Preformed armour rod for Zebra conductor as per design drawing and specifications.
Supply,Tranporting and fixing of Tension fittings for earthwire as per design drawing and specifications.
Supply,Tranporting and fixing of Suspension fittings for eathwire as per design drawing and specifications.
Supply,Tranporting and fixing of Mid span joint for earthwire as per design drawing and specifications.
Supply,Tranporting and fixing of Aluminium earthbond as per design drawing and specifications.
Supply,Tranporting and fixing of 20mm dia. I Bolt and Nuts/ Hanger rods as per design drawing and specifications.
Supply,Tranporting and fixing of Single tension fittings for Panther conductor as per design drawing and specifications.
Supply,Tranporting and fixing of Single suspension fittings for Panther conductor as per design drawing and specifications.
Supply,Tranporting and fixing of SB damber for Panther as per design drawing and specifications.
Supply,Tranporting and fixing of Midspan joint for Panther as per design drawing and specifications.
Supply,Tranporting and fixing of Repair sleeve for Panther as per design drawing and specifications.
Supply,Tranporting and fixing of 16mm dia. I Bolt and Nuts/ Hanger rods/Eye bolt for Panther as per design drawing and specifications.
Supply,Tranporting and fixing of Name Board as per design drawing and specifications.
Supply,Tranporting and fixing of Danger board as per design drawing and specifications.
Supply,Tranporting and fixing of Phase plate as per design drawing and specifications.
Supply,Tranporting and fixing of Number plate as per design drawing and specifications.
Fabrication, galvanisation and supply of standard MS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost.
Fabrication, galvanisation and supply of standard HTS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost.
Supplying, Transportation from source to site , fabrication, galvanising of standard Bolts and nuts of various sizes and various lengths as per department approved drawing including all taxes and duties, lead, lift and head load, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer at site.
Dismantling of 13 Units of 90 KN Insulator including cost of all labour,lead,lift and T&P etc complete
Dismantling of 14 Units of 120 KN Insulator including cost of all labour,lead,lift and T&P etc complete
Dismantling of 8 units of 120 KN insulator including cost of all labour,lead,lift and T&P etc complete
Labour charges for Releasing and coiling of 3 Nos ACSR Kundah conductor and vibration dambers at tension locations including jumber connections, transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For Kms
Labour charges for Releasing and coiling of 1No.GI Earthwire , transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For Kms
Labour charges for dismantling of GI tower angles including cost of materials,T & P,labour, lead, lift etc complete.
Dismantling of MS Tower parts in AS IS WHERE IS Condition clearing from the site on cost to paid to TANTRANSCO,including the cost of loading,unloading with necessary tools and plants with safety norms (The quoted rate should not be less than Rs.25000)
Dismantling of ACSR Kundha conductor in AS IS WHERE IS Condition clearing from the site on cost to paid to TANTRANSCO,including the cost of loading,unloading with necessary tools and plants with safety norms (The quoted rate should not be less than Rs.90000)
Dismantling of GI earthwire in AS IS WHERE IS Condition clearing from the site on cost to paid to TANTRANSCO,including the cost of loading, unloading with necessary tools and plants with safety norms (The quoted rate should not be less than Rs.18000)
Dismantling of 120KN & 90 KN disc Insulator in AS IS WHERE IS Condition clearing from the site on cost to paid to TANTRANSCO,including the cost of loading, unloading with necessary tools and plants with safety norms (The quoted rate should not be less than Rs.18)
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
GUHANSANJEEVI ENTERPRISES
JD ENTERPRISES
M s Kumaresan and co
C.PERIYASAMY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .