Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr Quoted ₹2.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.9 Cr+₹65.9 L (29.3%)Rejected-AOC PUNE MAHARASHTRA 411033 INDIA UDYAM MH 26 0033902 | PUNE | MAHARASHTRA | 411033 | ₹2.9 Cr+₹65.9 L (29.3%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically not suitable |
Tender Value
Refer Docs
Closing Date
25 Sept 2021, 9:00 amClosed
CM P
RASHTRIYA CHEMICALS AND FERTILIZERS LIMITED,THAL
UPGRADATION OF CONTROL SYSTEM
2021_RCFL_644900_1
AL-69583 UPGRADATION OF CONTROL SYSTEM
Open Tender
Miscellaneous Goods
Supply
90 days
RASHTRIYA CHEMICALS AND FERTILIZERS LIMITED, THAL
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
Exempted
1 Jan 2022
25 Aug 2021
25 Sept 2021
25 Aug 2021
25 Sept 2021
25 Aug 2021
SUPPLY OF ITEMS AS PER FOLLOWING SPECIFICATIONS
Supply portion of upgradation of WTP Control system including Design,Engineering, Configuration & Spares as per attached terchnical specification at Annexure -I
Installation And Commissioning charges including existing panel removal & training.
Comprehensive AMC for eight years after completion of warrenty period of one year as per scope of work attached with NIT (Charges for AMC for 1 years)
Comprehensive AMC for eight years after completion of warrenty period of one year as per scope of work attached with NIT (Charges for AMC for 2 years)
Comprehensive AMC for eight years after completion of warrenty period of one year as per scope of work attached with NIT (Charges for AMC for 3 years)
Comprehensive AMC for eight years after completion of warrenty period of one year as per scope of work attached with NIT (Charges for AMC for 4 years)
Comprehensive AMC for eight years after completion of warrenty period of one year as per scope of work attached with NIT (Charges for AMC for 5 years)
Comprehensive AMC for eight years after completion of warrenty period of one year as per scope of work attached with NIT (Charges for AMC for 6 years)
Comprehensive AMC for eight years after completion of warrenty period of one year as per scope of work attached with NIT (Charges for AMC for 7 years)
Comprehensive AMC for eight years after completion of warrenty period of one year as per scope of work attached with NIT (Charges for AMC for 8 years)
Softcon Systems Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .