Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAccepted-AOC | ₹13.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹14.4 LRejected-Finance | ₹14.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹14.8 LRejected-Finance | ₹14.8 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/S RAJENDRA SINGH L3 | DIPAK KUMAR SINGH L1 | ANKIT KUMAR MISHRA L2 |
|---|---|---|---|---|---|---|
| 1.00Construction air crossing at (39L/3ED). (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Side blasting in coal by electric drill & explosive | 86.4 | Cubic Meter | 820.57 ₹70,897.62 | 773.47 ₹66,827.81 | 796.67 ₹68,832.64 |
| 1.02 | Roof blasting in hard stone by electric drill & explosive | 92.52 | Cubic Meter | 4,151.22 ₹3,84,070.58 | 3,912.92 ₹3,62,023.36 | 4,030.31 ₹3,72,884.06 |
| 1.03 | Recess cutting for brick wall in hard stone by hand | 2.11 | Cubic Meter | 6,177.08 ₹13,033.64 | 5,822.49 ₹12,285.45 | 5,997.16 ₹12,654.02 |
| 1.04 | Recess cutting in coal | 1.35 | Cubic Meter | 1,720.2 ₹2,322.27 | 1,621.45 ₹2,188.96 | 1,670.09 ₹2,254.63 |
| 1.05 | P.B. work | 40.88 | Cubic Meter | 7,269.91 ₹2,97,194.03 | 6,852.59 ₹2,80,133.88 | 7,058.17 ₹2,88,537.9 |
| 1.06 | Plastering | 133.2 | Square Meter | 401.26 ₹53,448.39 | 378.23 ₹50,380.24 | 389.58 ₹51,891.64 |
| 1.07 | P.C.C | 3.77 | Cubic Meter | 8,178.71 ₹30,833.74 | 7,709.22 ₹29,063.76 | 7,940.5 ₹29,935.67 |
| 1.08 | Rod | 295.69 | Kgs | 84.87 ₹25,095.8 | 80 ₹23,655.2 | 82.4 ₹24,364.86 |
| 1.09 | Loading & unloading materials from surface to U/G | 95 | Tubs | 767.76 ₹72,937.46 | 723.69 ₹68,750.55 | 745.4 ₹70,813.07 |
Tender Value
₹13.9 L
EMD Value
₹17,500
Closing Date
21 Feb 2026, 9:00 amClosed
Area Survey Officer
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Reconstruction of one number air crossing at 39L/3ED in R-V Seam of Khottadih Colliery, Pandaveswar Area
2026_ECL_352864_1
GM/PND/Sur/Ten/25-26/191/350 Dated 09.02.2026
Open Tender
Civil Works - Others
30 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹17,500
5 Mar 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
21 Feb 2026
11 Feb 2026
11 Feb 2026 - 14 Feb 2026
Construction air crossing at (39L/3ED). (Inclusive of EPF/CMPF)
Side blasting in coal by electric drill & explosive
Roof blasting in hard stone by electric drill & explosive
Recess cutting for brick wall in hard stone by hand
Recess cutting in coal
P.B. work
Plastering
Loading & unloading materials from surface to U/G
Mechanically transport of tub(500-1500m)
Pushing tub manually(150-200m)
Lead for carrying materials (30m)
Lead for blasted materials(150m)
Erection of iron sheet stopping. (Inclusive of EPF/CMPF)
Floor cutting in hard stone by hand
Recess cutting in coal by hand
Duggi cutting in floor stone for fixing pipe
Duggi cutting in roof coal for fixing pipe
Fabrication & fitting of iron structure with nut bolt & complete with leakage proof
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.62 MB
BOQ_365660.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid