| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance HYDERPORA NEAR ELLAQUAI DEHATI BANK SRINAGAR KASHMIR J K 190014 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190014 | L1 | Admitted-Finance | ||
| 2 | L2₹2.6 Cr+₹15.8 L (6.59%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.7 Cr+₹30.1 L (12.5%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹3.0 Cr+₹63.6 L (26.5%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.8 Cr
EMD Value
₹7.6 L
Closing Date
7 Oct 2026, 4:00 pmClosed
ADGP Hqrs PHQ
Jammu
Construction
2026_DGPJK_326442_1
e-NIT/EE-PCD/PHQ/93/2026-27
Open Tender
Civil Works
Percentage
60 days
CTC Sunjwan Jammu
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,000
Exen PCD PHQ
₹7.6 L
15 Oct 2026
30 Sept 2026
8 Oct 2026
30 Sept 2026
7 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means ( hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres All kinds of soil | 608.16 | Cum | 256.85 | ₹1,56,205.9 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 285.72 | Cum | 4,826.5 | ₹13,79,027.58 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1,119.42 | Cum | 5,733.6 | ₹64,18,306.51 |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 39.48 | Cum | 7,788.4 | ₹3,07,486.03 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 4,345.8 | Kg | 123.2 | ₹5,35,402.56 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 118.26 | Cum | 6,591.25 | ₹7,79,481.23 |
| - | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 3,452.76 | Sqm | 286.35 | ₹9,88,697.83 |
| - | TECHNICAL SPECIFICATIONS FOR PRE-FAB STRUCTURE MADE UP OF STEEL AND PUF PANELLS IN WALLS
Pre-Fabricated shelter made up of steel structure and PUF panels, colour coated profile sheets etc with technical specification as given below:-
Design Parameter.
Seismic=Zone V
Wind speed=55m/s (As per IS-875)
Temperature Range=(-) 40 to (+) 50 C
Roof slope= 1:2
Dimensions. All as indicated in the reference drawing to be provided as site are as directed by EIC at site.
Technical Specifications.
Details of Structural Members. The steel structure for the shelters will be designed for the Designed Parameters. All structural steel will be ISI marked with manufacturer’s test certificate for raw material and structural properties. The main columns , verandah rafters, trusses, purlins etc will be Made out of steel sections , MS plates, M S bolts / nuts etc (the size of steel sections / thickness of M S plates, size of bolts/ nuts will be as per drawings or as directed by EIC at site. The roof will be provided with 0.50mm thick green colour coated steel profile sheets. Sheet covering will be fixed with using hot dip zinc coated self drilling hexagonal washer head fasteners. Ridge shall be covered by 0.45mm thick colour coated steel sheet. The sheets shall be laid with minimum end and side lap of 150mm. | 10,800 | Sft | 2,000 | ₹2,16,00,000 |
| 8.01 | Gable End. Gable End will be covered with same panels as of wall upto bottom chord of truss. The triangular truss portion will be covered with 0.50mm wider than the width of the opening.
Sunshades. Suitable sunshades made out of colour coated sheet reinforced with angle iron frame will be provided to all external windows and doors. The minimum projection for the sunshades will be 450 mm and 300mm wider than the width of the opening.
Roof Projection. The roof will have minimum projection 450mm all around including verandah portion. Purlins will also be extended in the roof at the eaves and at gable roof extension (outside the structure). | - | - | - | - |
| 8.02 | Main walls & partition walls.
The main and partition walls will be made up of 60 mm thick wall Panels having height of 3.0 mtrs of make Llod panel system /Modern Panels/Jindal Mectecnol/PSL Engineering or equivalent. The Panels will be made of 0.63mm thick hot dipped galvanized steel sheets on both sides with 60mm thick layer of rigid CFC free close cell polyurethane foam (Density 40 Kg+2 Kg/Cum) insulation. The wall panels will be provided with joins and will be with Continious line systems for interlocking. All materials required for the manufacture of shelter will be new and shall comply with relevant Bureau of Indian Standard Specification. Base channel of specified size will be provided for walls. The PUF insulation material in the panel will have fire retarding and self extinguishing properties as per any international standard B2 DIN 4102 Part-I/BS-4735 Self Ext. False Ceiling. The false ceiling of Rooms, Toilets and Verandah will be made up of 40 mm thick PUF insulated Panels of Make Lloyd Panel system/Modern Panels/ Jindal Mectechno/PSL Engineering or equivalent. The Panels will be made of 0.63 mm thick hot dipped galvanized steel sheets on both side with 40mm thick layer of rigid CFC free close cell polyurethane foam (Density 40 Kg+ 2 Kg/Cum) insulation. The false ceiling panels will be provided with Continuos line joint for interlocking. False ceiling will be supported with the help of inverted CRCA Tee Section 50x50x5 mm thick and LSection of 50x50x5 mm thick fixed appropriately to the Truss. | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.80 MB
Tendernotice_2.pdf
PDF • 16.85 MB
BOQ_1104237.xls
BOQ • 2.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .