| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.9 L+₹13,905 (2.06%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | C REVATHI L1 | SEENAPPA BASKAR L2 |
|---|---|---|---|---|---|
| 1.00 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers.(p.no.29) 90mm HDPE Pipe | 1,150 | Rm | 304 ₹3,49,600 Lowest | 305 ₹3,50,750 |
| 2.00 | Earth work excavation and deposition on the bank with an initial lead and lift of 10 meters and initial lift of 2 meters in hard stiffy clay stiff black cotton hard red earth murram, gravelly soils(SS20B) etc., complete as per std., specification. | 1,150 | Rm | 194 ₹2,23,100 Lowest | 200 ₹2,30,000 |
| 3.00 | Lowering the following HDPE pipes and specials into trench and laying to proper grade and alignment complete as per standard specification by deparment officers etc.., HDPE Pipe 90mm | 1,150 | Rm | 18 ₹20,700 Lowest | 19 ₹21,850 |
| 4.00 | Jointing the HDPE pipes and specials and testing the required pressure with water etc.., Complete as per standard specification | 1,150 | Rm | 30 ₹34,500 Lowest | 32 ₹36,800 |
| 5.00 | Refilling the excavated earth in to the trenches after laying the P.V.C. pipe in to the trench including cost of all labour charges and all other incidental charges etc., complete. | 1,150 | Rm | 26 ₹29,900 Lowest | 28 ₹32,200 |
| 6.00 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers. 90 mm HDPE stup bend | 5 | Nos | 1,200 ₹6,000 Lowest | 1,200 ₹6,000 Lowest |
| 6.01 | 90 mm HDPE Elbow | 5 | Nos | 342 ₹1,710 Lowest | 345 ₹1,725 |
| 6.02 | 90 mm HDPE Flange set | 5 | Nos | 1,100 ₹5,500 Lowest | 1,100 ₹5,500 Lowest |
| 6.03 | 90 mm PVC Ball Valve | 5 | Nos | 300 ₹1,500 Lowest | 300 ₹1,500 Lowest |
| 6.04 | 90 mm HDPE Tee | 5 | Nos | 475 ₹2,375 Lowest | 475 ₹2,375 Lowest |
Tender Value
₹8.1 L
EMD Value
₹8,100
Closing Date
10 Dec 2025, 3:00 pmClosed
COMMISSIONER
HOSUR CITY MUNICIPAL CORPORATION HOSUR
Laying pipe line work at Ward No15, Om Shanthi Nagar, Abdul Kalam Nagar Ward No.22 Krishnaappa Thottam,and Ward No.27, Thiruvalluvar Nagar in Hosur City Municipal Corporation in Hosur City Municipal Corporation
2025_MAWS_629130_1
12180/2025/E2/HOSUR CITY MUNICIPAL CORPORATION
Open Tender
Civil Works
Works
90 days
HOSUR CITY MUNICIPAL CORPORATION
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,100
27 Mar 2026
5 Dec 2025
10 Dec 2025
5 Dec 2025
10 Dec 2025
5 Dec 2025
Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers.(p.no.29) 90mm HDPE Pipe
Earth work excavation and deposition on the bank with an initial lead and lift of 10 meters and initial lift of 2 meters in hard stiffy clay stiff black cotton hard red earth murram, gravelly soils(SS20B) etc., complete as per std., specification.
Lowering the following HDPE pipes and specials into trench and laying to proper grade and alignment complete as per standard specification by deparment officers etc.., HDPE Pipe 90mm
Jointing the HDPE pipes and specials and testing the required pressure with water etc.., Complete as per standard specification
Refilling the excavated earth in to the trenches after laying the P.V.C. pipe in to the trench including cost of all labour charges and all other incidental charges etc., complete.
Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers. 90 mm HDPE stup bend
90 mm HDPE Elbow
90 mm HDPE Flange set
90 mm PVC Ball Valve
90 mm HDPE Tee
90 x 75 mm HDPE Reducer
2" x 3" HDPE Reducer
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
Tendernotice_2.pdf
PDF • 0.96 MB
BOQ_752314.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .