| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC | ₹7.8 L | L1 | Accepted-AOC BID ACCEPTED |
| 2 | L2₹7.9 LRejected-Finance | ₹7.9 L | L2 | Rejected-Finance ABOVE |
| Sl No | Description | Qty | Unit | BARGUNAN P L1 | KRISHNAMOORTHY L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge as per unit cost given by dma the estimate is arrived. | 12.6 | m3 | 105 ₹1,323.12 Lowest | 110 ₹1,386.12 |
| 2.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 3 | m3 | 5,580 ₹16,756.74 Lowest | 5,585 ₹16,771.75 |
| 3.00 | Supplying and Erecting and centering shuttering for sides and sofits of plain surface such as Rcc slab rectangular , T beam lintel , bed blocks, staircase waist slab , etc. including strutting shuttering , and remaining same etc. complete as per drawing | 15.02 | m2 | 1,023 ₹15,367.1 Lowest | 1,050 ₹15,772.68 |
| 4.00 | a)RCC slabs, Rectangular beems, Tee (or) ECC Beam, Lintel, Bed Block,Staircase waist and landing slabs landing beams, canopy etc., | 17.61 | M2 | 1,023 ₹18,009.92 Lowest | 1,050 ₹18,485.25 |
| 5.00 | b)RCC column, footing, plinth beam, stair case beam
etc | 24.66 | M2 | 306 ₹7,544.74 Lowest | 310 ₹7,643.36 |
| 6.00 | c)Rectangular column top and bottom slabs of boxing, sill, slabs, sun shade etc., | 4 | M2 | 1,228 ₹4,917.89 Lowest | 1,250 ₹5,006 |
| 7.00 | Reinforced cement concrete M20 1:1.5:3 granite metal by volume, characteristic strength not less than 20N/sqmm) machine mixed for all reinforced cement concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with relevant standard specifications at all leads inside the building. | 9.5 | m3 | 7,977 ₹75,804.39 Lowest | 8,100 ₹76,973.25 |
| 8.00 | Supplying, cutting, bending and placing of reinforcement stel of MS, HYSD bars for all type of RCC works at all levels including cost of 18 gauge GI binding wire cost, labour etc., as per design and details complete. | 9.5 | Qtl | 9,185 ₹87,283.86 Lowest | 9,250 ₹87,901.55 |
| 9.00 | Flyash Brick work in cement mortor 1:5 mix (one cement,five sand) using II class country bricks to a size of 9"x4 3/8"x2 3/4" including cost and conveyance of all materials and labour charges for mixing the mortor, constructing, curing to required period and wherever the masonry projection is necessary for elevation shall be done with out extra cost etc complete as per std spn.upto basement | 23 | M3 | 7,460 ₹1,71,576.12 Lowest | 7,560 ₹1,73,876.07 |
| 10.00 | Supplying and filling in foundation and basement etc., with filling Well Gravel in layers well watered, rammed and consolidated etc., complete complying with standard specification and as directed by department officers. | 2.5 | m3 | 259 ₹647.97 Lowest | 275 ₹688 |
Tender Value
₹8.5 L
EMD Value
₹8,500
Closing Date
17 Feb 2026, 3:00 pmClosed
Commissioner, Cuddalore Corporation
Bharathi Road, Cuddalore.
Construction of Public Toilet at ward no.15 in community hall, Cuddalore City Municipal Corporation.
2026_MAWS_653971_1
ROC.NO.487/2025/E1
Open Tender
Civil Works
Item Rate
90 days
WORKS
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,500
Yes
1 Aug 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge as per unit cost given by dma the estimate is arrived. | 12.6 | m3 | - | - |
| 2 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 3 | m3 | - | - |
| 3 | Supplying and Erecting and centering shuttering for sides and sofits of plain surface such as Rcc slab rectangular , T beam lintel , bed blocks, staircase waist slab , etc. including strutting shuttering , and remaining same etc. complete as per drawing | 15.02 | m2 | - | - |
| 4 | a)RCC slabs, Rectangular beems, Tee (or) ECC Beam, Lintel, Bed Block,Staircase waist and landing slabs landing beams, canopy etc., | 17.61 | M2 | - | - |
| 5 | b)RCC column, footing, plinth beam, stair case beam
etc | 24.66 | M2 | - | - |
| 6 | c)Rectangular column top and bottom slabs of boxing, sill, slabs, sun shade etc., | 4 | M2 | - | - |
| 7 | Reinforced cement concrete M20 1:1.5:3 granite metal by volume, characteristic strength not less than 20N/sqmm) machine mixed for all reinforced cement concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with relevant standard specifications at all leads inside the building. | 9.5 | m3 | - | - |
| 8 | Supplying, cutting, bending and placing of reinforcement stel of MS, HYSD bars for all type of RCC works at all levels including cost of 18 gauge GI binding wire cost, labour etc., as per design and details complete. | 9.5 | Qtl | - | - |
| 9 | Flyash Brick work in cement mortor 1:5 mix (one cement,five sand) using II class country bricks to a size of 9"x4 3/8"x2 3/4" including cost and conveyance of all materials and labour charges for mixing the mortor, constructing, curing to required period and wherever the masonry projection is necessary for elevation shall be done with out extra cost etc complete as per std spn.upto basement | 23 | M3 | - | - |
| 10 | Supplying and filling in foundation and basement etc., with filling Well Gravel in layers well watered, rammed and consolidated etc., complete complying with standard specification and as directed by department officers. | 2.5 | m3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_784195.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_784195.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].