Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC AT VINDHANE POST DIGHODE TAL PANVEL DIST RAIGAD | RAIGAD | MAHARASHTRA | ₹3.1 L | L1 | Accepted-AOC LOWEST BIDDER ACCEPTED |
| 2 | L2₹3.2 L+₹3,453.85 (1.10%)Rejected-Finance | ₹3.2 L+₹3,453.85 (1.10%) | L2 | Rejected-Finance rejected |
| 3 | L3₹3.2 L+₹6,593.71 (2.10%)Rejected-Finance | ₹3.2 L+₹6,593.71 (2.10%) | L3 | Rejected-Finance rejected |
Tender Value
₹3.1 L
EMD Value
₹6,280
Closing Date
9 Mar 2026, 6:55 pmClosed
Pradhan
Pokhriabong III Gram Panchayat
Construction of jhora below Dhajea Bus Stand sansad no XI under Pokhriabong III Gram Panchayat XVI th FC 2025-2026 2nd installment
2026_GTA_1016343_9
02/16th FC /Pradhan/PokhriabongIII GP
Open Tender
CIVIL WORKS
Percentage
Pokhriabong III Gram Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹6,280
21 Apr 2026
28 Feb 2026
12 Mar 2026
28 Feb 2026
9 Mar 2026
28 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. . | |||||
| 1.01 | (a) Depth of excavation not exceeding 1.500 mm. | - | Cu.M | 1 | - |
| 2Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. | |||||
| 3Cost of stone boulder 150 mm size delivered ans stacked at site. | |||||
| 4Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes. | |||||
| 4.01 | (b) River bazree. | - | Cu.M | - | - |
| 5Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. | |||||
| 5.01 | (i) (1:3:6) proportion. | - | Cu.M | 1 | - |
| 6Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes. | |||||
| 6.01 | (ii) River bazree. | - | Cu.M | 1 | - |
stage.html
html • 0.05 MB
technical_2497064.pdf
techsummary_2497064.pdf
finance_2497064.pdf
BOQ Comparative Chart
xlsx
finsummary_2497064.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
NIT02.pdf
Tender Documents • 1.22 MB
BOQ_2497064.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .