| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.1 LAccepted-AOC | L1 | Accepted-AOC Work Order |
Tender Value
₹39.8 L
EMD Value
₹39,800
Closing Date
13 Mar 2025, 11:00 amClosed
Executive Engineer, Nashik
Executive Engineer, MIDC, 2nd floor, Satpur, Nashik
M and R to Water supply scheme at Sinnar industrial area...Strengthening of ESR with high strength mortar at WTP premises. 2nd call
2025_MIDC_1156657_1
MIDC_Tender_Esr_Sinnar_2025
Open Tender
Civil Works
Item Wise
Nashik
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,030
₹39,800
5 May 2025
4 Mar 2025
17 Mar 2025
4 Mar 2025
13 Mar 2025
5 Mar 2025
Amount
Providing structural strengthening by providing chembond-kem micriconcrete treatment to 1500 m3 ESR at Sinner Industrial area
Cleaning elevated water storage Reservoir within a given period, by using bleaching powder at the rate of 14 gm/sq.m .washing thrice potassium permanganate at the rate of 2.50 gm/sq.m. finally, cleaning washing by using nylon brush, coir string and duster, bailing out water etc. complete. xiii) Capacity above 7.00 lakh upto 12.00 lakh.
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis,M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works.
Chipping of all loose and Spalling of concrete to bottom of slab, beams etc.(wherever required), cleaning of reinforcement, carrying out thorough sand blasting, application of anti-corrosive zinc rich epoxy primer to exposed reinforcement including cost of material, labour, equipment, tools, scaffolding etc. complete.
Providing and Fixing of 12mm nozzle in the crack portion@ 500 c/c including material, labour complete in all respectProviding and Fixing of 12mm nozzle in the crack portion@ 500 c/c including material, labour complete in all respect
Crack Groove Cutting: Groove shall be cut using hand held electrically operated concrete cutting machine of size of 50 mm wide and 75 mm deep on each side of the crack to form as "V" groove all along the crack to fill the polyester resin/ Epoxy putty (horizontal and vertical cracks). After the groove cutting, the concrete shall be removed from the groove using the pneumatic concrete chipping machine to form "V" groove. The item includes the cost of hire charges for all machineries, tools and barges and all labour charges etc., completeCrack Groove Cutting: Groove shall be cut using hand held electrically operated concrete cutting machine of size of 50 mm wide and 75 mm deep on each side of the crack to form as "V" groove all along the crack to fill the polyester resin/ Epoxy putty (horizontal and vertical cracks). After the groove cutting, the concrete shall be removed from the groove using the pneumatic concrete chipping machine to form "V" groove. The item includes the cost of hire charges for all machineries, tools and barges and all labour charges etc., complete
Crack Sealing/Filling using epoxy mortar: Base and hardener of the high strength repair mortar . Epoxy putty shall be mixed using the slow speed heavy duty mixing machine to obtain a uniform mix. The mixed materials shall be placed all along the prepared "V" groove and finished smoothly using the putty blade/ trowel within 30 minutes by using the divers. The finished surface shall be allowed for curing minimum of 24 hours to attain the strength. The item includes the cost of hire charges of all equipment , tools and plants and all labour charges etc., complete.Crack Sealing/Filling using epoxy mortar: Base and hardener of the high strength repair mortar . Epoxy putty shall be mixed using the slow speed heavy duty mixing machine to obtain a uniform mix. The mixed materials shall be placed all along the prepared "V" groove and finished smoothly using the putty blade/ trowel within 30 minutes by using the divers. The finished surface shall be allowed for curing minimum of 24 hours to attain the strength. The item includes the cost of hire charges of all equipment , tools and plants and all labour charges etc., complete.
Providing and fixing in position HCRM / CRS (Corrosion Resistant Steel) bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required ete completeProviding and fixing in position HCRM / CRS (Corrosion Resistant Steel) bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required ete complete
Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer‘s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. HY200 -10 mm dia 200mm depthSupplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer‘s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. HY200 -10 mm dia 200mm depth
Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer‘s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. HY200 -12 mm dia 240mm depth
Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer‘s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. HY20 -8mm dia 160mm depth.
Providing & applying structural grade epoxy latex bond coat prior to application of any type of mortar confirming to IS codes or equivalent to ensure bond between old concrete & new concrete by brush application etc complete
Providing and placing in position micro concrete which shall be cement base pripack single component, cloride free , non shrink, free flow, self compacting , ready to use after mixing water and agrregate with leakproof shuttering in specified proporation obtain from approved manufacturer(chembond-KEM MICROCONCRETE) all manpower and equipments complete in all respect as per specification and direction of Engineer - in - ChargeProviding and placing in position micro concrete which shall be cement base pripack single component, cloride free , non shrink, free flow, self compacting , ready to use after mixing water and agrregate with leakproof shuttering in specified proporation obtain from approved manufacturer(chembond-KEM MICROCONCRETE) all manpower and equipments complete in all respect as per specification and direction of Engineer - in - Charge
Core Strengthening of Concrete Structure: Strengthening of concrete structure including grouting of concrete with epoxy, AC-DUR-IE, as detailed in the method statement. Item includes cost of material, labour, equipment‘s and also removal of nozzles and finishing of the surface after the work..
Providing, drilling and fixing Nipples for pressure injection grouting of polymer cement grout etc. complete
Filling voids/honeycomb with high pressure injection grouting of Polymer Cement Grout (10% of Polymer by Weight of Cement)Filling voids/honeycomb with high pressure injection grouting of Polymer Cement Grout (10% of Polymer by Weight of Cement)
Providing internal cement plaster 20mm. thick in Single coats in cement mortar 1:3 without neeru finish, to concrete, brick surface, in all positions including scaffolding and curing etc. complete Providing internal cement plaster 20mm. thick in Single coats in cement mortar 1:3 without neeru finish, to concrete, brick surface, in all positions including scaffolding and curing etc. complete
Providing and applying required coats of a water based KEM PROOF CWC Deep Penetrating Sealer on cement concrete surface like beams, and columns, plastered walls, basements, roofs, potable water tanks etc to react with cement and to penetrate concrete structure thereby making it resistant to chemicals / chlorides water to make it dust proof and to act as a water resistant at the same time which Strengthens the treated surface and reduce the curing period etc complete. Providing and applying required coats of a water based KEM PROOF CWC Deep Penetrating Sealer on cement concrete surface like beams, and columns, plastered walls, basements, roofs, potable water tanks etc to react with cement and to penetrate concrete structure thereby making it resistant to chemicals / chlorides water to make it dust proof and to act as a water resistant at the same time which Strengthens the treated surface and reduce the curing period etc complete.
Providing and applying epoxy paint of approved make (Shalimar, Ciba or Mahindra & Mahindra) to concrete surface for RCC ESR or GSR or any other structure including cleaning the surface by scrapping and air blowers to surface by scrapping and air blowers to the satisfaction of Engineer-in-charge, the satisfaction of Engineer-in-charge, the satisfaction of Engineer-in-charge, necessary scaffolding, etc. complete with all leads and lifts and giving satisfactory hydraulic test for water tightness as per I.S. codes.(MJP SSR 23-24, P.No281 I.No SECTION K - (III)06) Providing and applying epoxy paint of approved make (Shalimar, Ciba or Mahindra & Mahindra) to concrete surface for RCC ESR or GSR or any other structure including cleaning the surface by scrapping and air blowers to surface by scrapping and air blowers to the satisfaction of Engineer-in-charge, the satisfaction of Engineer-in-charge, the satisfaction of Engineer-in-charge, necessary scaffolding, etc. complete with all leads and lifts and giving satisfactory hydraulic test for water tightness as per I.S. codes.(MJP SSR 23-24, P.No281 I.No SECTION K - (III)06)
Providing and fixing modifoam fill density 20 Kg/ Cum with fixing special addesive bond material, installation, screeding of M20 in 40 mm thick , laying weld mesh 4 mm @ 40 mm c/c, etc. complete. As directed by Engineer-in-charge.Providing and fixing modifoam fill density 20 Kg/ Cum with fixing special addesive bond material, installation, screeding of M20 in 40 mm thick , laying weld mesh 4 mm @ 40 mm c/c, etc. complete. As directed by Engineer-in-charge.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .