| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹873.07−₹76.1 L (8.88%)Accepted-AOC | ₹873.07−₹76.1 L (8.88%) Quoted ₹7.8 Cr | H2 | Accepted-AOC H2,Awarded |
| 2 | H1₹8.6 CrRejected-Finance UNNAMED ROAD PURA NANDLAL MACHHALISHAHAR JAUNPUR JAUNPUR UTTAR PRADESH 222143 | JAUNPUR | UTTAR PRADESH | 222143 | ₹8.6 Cr | H1 | Rejected-Finance H1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Responsive |
Tender Value
₹10.9 Cr
EMD Value
₹21.8 L
Closing Date
12 Dec 2024, 4:00 pmClosed
Empowered Officer, SRRDA,PMGSY
Office of the Empowered Officer, SRRDA, PMGSY Cell Lower lachumiere, Meghalaya, Shillong - 7930001 0364-2506228/ [email protected]
Construction i/c MBT
2024_CEMEG_137359_1
MG06III0111
Open Tender
Civil Works - Roads
Item Rate
365 days
Mahendraganj
Please refer Tender documents.
6 documents required · 6 mandatory
₹11,000
₹21.8 L
Yes
Shillong
15 May 2025
20 Nov 2024
13 Dec 2024
20 Nov 2024
12 Dec 2024
20 Nov 2024
20 Nov 2024 - 11 Dec 2024
25 Nov 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing and Grubbing Road Land | |||||
| 1.01 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150mm as per Technical Specification Clause 201.
(I) By Manual Means-
(A) In area of non thorny jungle | 3.49 | Hectare | 64,936 | ₹2,26,431.83 |
| 2 | Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202.
(b) Above 600 mm to 900 mm dia Hume pipe | 22.5 | RM | 299 | ₹6,727.5 |
| 3 | Dismantling Stone Masonry as per Technical Specification Clause 202.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.
(B) Rubble Stone Masonry in Cement Mortar | 40.85 | Cum | 512 | ₹20,915.2 |
| 4 | Dismantling Brick / Tile Work
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. | 6.53 | Cum | 513 | ₹3,349.89 |
| 5 | Dismantling Kilometre Stones
Dismantling of kilometre stones including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and backfilling of pit as per Technical Specification Clause 202.
(a) 5th km Stone | 1 | Each | 498 | ₹498 |
| 6 | Dismantling Kilometre Stones
Dismantling of kilometre stones including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and backfilling of pit as per Technical Specification Clause 202.
(b) Ordinary km Stones | 6 | Each | 309 | ₹1,854 |
| 7 | Dismantling Kilometre Stones
Dismantling of kilometre stones including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and backfilling of pit as per Technical Specification Clause 202.
(c) 200 m Stones | 14 | Each | 67 | ₹938 |
| 8 | Preparation of Foundation for Embankment
Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 34,870 | Sqm | 20 | ₹6,97,400 |
| 9 | Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 3,804 | Cum | 520 | ₹19,78,080 |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
156729709.xls
BOQ Document • 0.32 MB
156729710.pdf
Tender Document • 2.07 MB
MBDMG06III0805.pdf
Tender Document • 2.51 MB
156729712.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .