| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹4.8 L (4.48%)Admitted-Finance | ₹1.1 Cr+₹4.8 L (4.48%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹9.4 L (8.74%)Admitted-Finance | ₹1.2 Cr+₹9.4 L (8.74%) | L3 | Admitted-Finance |
| 4 | L4₹1.2 Cr+₹12.9 L (11.9%)Admitted-Finance H NO 384 SHIVALIK PURAM JANIPUR COLONY JAMMU | ₹1.2 Cr+₹12.9 L (11.9%) | L4 | Admitted-Finance |
| 5 | L5₹1.2 Cr+₹14.1 L (13.1%)Admitted-Finance VPO JALGRAN TEH DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹1.2 Cr+₹14.1 L (13.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TRIKUTA BUILDERS L18 | SUNIL KUMAR L10 | aditya puri L11 | M/S Gopal Singh Contractor L15 | INDER MOHAN GUPTA L23 | M/S Kulbushan Singh Contractor L22 | M/S RAJEEV SINGH CONTRACTOR L1 | SHAM SINGH L2 | RAVINDER SINGH, GOVT. CONTRACTOR L5 | VED KISHORE GUPTA , GOVT. CONTRACTOR L20 | Romy Choudhary L17 | yash pal singh L19 | naminder kumar govt. contractor L9 | M/S GUCHHU RAM L13 | M/S HARI SHAM GOVT CONTRACTOR L8 | Vivek Gupta L4 | ASHOK SINGH L21 | M/S AJAY KUMAR L14 | JASVIR SINGH L7 | Satish Samyal L24 | CHANDER SHAKHER GOVT. CONTRACTOR L16 | MOHINDER SINGH CHARAK L12 | M/S Padder Constructions PVT LTD L6 | AKASH GUPTA L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth,1.5 mtr in width as well as 10 sqm on plan)including disposal of excavated earth, lead upto 50m and lift upto 1.50m, disposed earth to be leveled and neatly for all kinds of soil. | 485 | cum | 100 ₹48,500 | 110 ₹53,350 | 140 ₹67,900 | 100 ₹48,500 | 120 ₹58,200 | 250 ₹1,21,250 | 50 ₹24,250 Lowest | 100 ₹48,500 | 80 ₹38,800 | 200 ₹97,000 | 80 ₹38,800 | 120 ₹58,200 | 100 ₹48,500 | 150 ₹72,750 | 100 ₹48,500 | 200 ₹97,000 | 250 ₹1,21,250 | 100 ₹48,500 | 50 ₹24,250 Lowest | 348.16 ₹1,68,857.6 | 200 ₹97,000 | 200 ₹97,000 | 100 ₹48,500 | - |
| 2.00 | Providing and filling RBM including loading, unloading, carriage in layers 20 cm depth consolidation with 8-10 ton Road Roller, watering, dressing complete in all respects including all sort of taxes as per item no.1 (B) | 22,000 | cum | 300 ₹66,00,000 | 220 ₹48,40,000 | 322 ₹70,84,000 | 305 ₹67,10,000 | 437 ₹96,14,000 | 307 ₹67,54,000 | 200 ₹44,00,000 | 248 ₹54,56,000 | 235 ₹51,70,000 | 307 ₹67,54,000 | 400 ₹88,00,000 | 390 ₹85,80,000 | 250 ₹55,00,000 | 300 ₹66,00,000 | 280 ₹61,60,000 | 200 ₹44,00,000 | 310 ₹68,20,000 | 290 ₹63,80,000 | 235 ₹51,70,000 | 501 ₹1,10,22,000 | 350 ₹77,00,000 | 330 ₹72,60,000 | 190 ₹41,80,000 | 130 ₹28,60,000 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering –All work upto plinth level. 1:4:8(1 cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size). | 53.75 | cum | 3,420 ₹1,83,825 | 2,700 ₹1,45,125 | 2,900 ₹1,55,875 | 2,000 ₹1,07,500 | 3,700 ₹1,98,875 | 4,000 ₹2,15,000 | 1,000 ₹53,750 Lowest | 1,500 ₹80,625 | 1,900 ₹1,02,125 | 4,000 ₹2,15,000 | 4,000 ₹2,15,000 | 2,200 ₹1,18,250 | 1,800 ₹96,750 | 1,800 ₹96,750 | 2,500 ₹1,34,375 | 1,000 ₹53,750 Lowest | 4,010 ₹2,15,537.5 | 2,800 ₹1,50,500 | 1,800 ₹96,750 | 3,200 ₹1,72,000 | 2,300 ₹1,23,625 | 2,000 ₹1,07,500 | 3,500 ₹1,88,125 | 2,000 ₹1,07,500 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All works upto plinth level 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size. | 1,826 | cum | 4,200 ₹76,69,200 | 3,499 ₹63,89,174 | 3,020 ₹55,14,520 | 4,000 ₹73,04,000 | 3,900 ₹71,21,400 | 5,000 ₹91,30,000 | 3,000 ₹54,78,000 | 2,900 ₹52,95,400 Lowest | 3,500 ₹63,91,000 | 5,000 ₹91,30,000 | 3,800 ₹69,38,800 | 3,700 ₹67,56,200 | 3,400 ₹62,08,400 | 3,700 ₹67,56,200 | 3,000 ₹54,78,000 | 3,900 ₹71,21,400 | 5,000 ₹91,30,000 | 4,000 ₹73,04,000 | 3,200 ₹58,43,200 | 4,400 ₹80,34,400 | 3,150 ₹57,51,900 | 3,500 ₹63,91,000 | 3,400 ₹62,08,400 | 4,300 ₹78,51,800 |
| 5.00 | Centering and shuttering including strutting, propping etc and removal of form work for:-Foundation footings, base of columns | 3,169 | sqm | 200 ₹6,33,800 | 110 ₹3,48,590 | 170 ₹5,38,730 | 100 ₹3,16,900 | 150 ₹4,75,350 | 200 ₹6,33,800 | 40 ₹1,26,760 | 50 ₹1,58,450 | 30 ₹95,070 | 200 ₹6,33,800 | 150 ₹4,75,350 | 120 ₹3,80,280 | 30 ₹95,070 | 10 ₹31,690 | 1 ₹3,169 Lowest | 10 ₹31,690 | 200 ₹6,33,800 | 150 ₹4,75,350 | 50 ₹1,58,450 | 200 ₹6,33,800 | 166.5 ₹5,27,638.5 | 150 ₹4,75,350 | 100 ₹3,16,900 | 10 ₹31,690 |
| 6.00 | 12mm thick plaster in 1:4 | 1,714 | sqm | 350 ₹5,99,900 | 210 ₹3,59,940 | 180 ₹3,08,520 | 200 ₹3,42,800 | 300 ₹5,14,200 | 170 ₹2,91,380 | 200 ₹3,42,800 | 100 ₹1,71,400 | 150 ₹2,57,100 | 170 ₹2,91,380 | 25 ₹42,850 Lowest | 300 ₹5,14,200 | 150 ₹2,57,100 | 100 ₹1,71,400 | 150 ₹2,57,100 | 100 ₹1,71,400 | 180 ₹3,08,520 | 200 ₹3,42,800 | 300 ₹5,14,200 | 200 ₹3,42,800 | 250 ₹4,28,500 | 150 ₹2,57,100 | 120 ₹2,05,680 | 200 ₹3,42,800 |
| 7.00Carriage of material | |||||||||||||||||||||||||||
| 7.10 | Sand (cum) | 1,868 | cum | 200 ₹3,73,600 | 100 ₹1,86,800 | - | 50 ₹93,400 | 150 ₹2,80,200 | 250 ₹4,67,000 | 1 ₹1,868 Lowest | 10 ₹18,680 | - | 200 ₹3,73,600 | - | 200 ₹3,73,600 | 10 ₹18,680 | 200 ₹3,73,600 | 1 ₹1,868 Lowest | 5 ₹9,340 | 220 ₹4,10,960 | 50 ₹93,400 | 10 ₹18,680 | 100 ₹1,86,800 | 140 ₹2,61,520 | 2 ₹3,736 | 100 ₹1,86,800 | - |
| 7.20 | Stone aggregate 5 KM | 1,876 | cum | 150 ₹2,81,400 | 200 ₹3,75,200 | - | 50 ₹93,800 | 150 ₹2,81,400 | 250 ₹4,69,000 | 1 ₹1,876 Lowest | 10 ₹18,760 | - | 200 ₹3,75,200 | - | 200 ₹3,75,200 | 10 ₹18,760 | 200 ₹3,75,200 | 1 ₹1,876 Lowest | 5 ₹9,380 | 210 ₹3,93,960 | 50 ₹93,800 | 10 ₹18,760 | 100 ₹1,87,600 | 150 ₹2,81,400 | 2 ₹3,752 | 100 ₹1,87,600 | - |
| 8.00 | Dumping of stones horizontally back of R/wall excluding cost of stones | 900 | cum | 200 ₹1,80,000 | 250 ₹2,25,000 | 100 ₹90,000 | 300 ₹2,70,000 | 200 ₹1,80,000 | 300 ₹2,70,000 | 1 ₹900 Lowest | 10 ₹9,000 | 150 ₹1,35,000 | 300 ₹2,70,000 | - | 200 ₹1,80,000 | 400 ₹3,60,000 | 130 ₹1,17,000 | 1 ₹900 Lowest | 100 ₹90,000 | 300 ₹2,70,000 | 70 ₹63,000 | 250 ₹2,25,000 | 200 ₹1,80,000 | 200 ₹1,80,000 | 100 ₹90,000 | 300 ₹2,70,000 | 300 ₹2,70,000 |
Tender Value
₹1.9 Cr
Closing Date
3 Jun 2021, 6:00 pmClosed
ER. AGINDER BAKSHI
O/o EXECUTIVE ENGINEER, JKSIDCO, BARI BRAHMANA
Construction of Retaining wall, Parapit, preparation of formation level by way of RBM filling and Earthwork I cutting of Road connectivity Phase Ist with Phase-II from Rd 0-450 mtrs at Industrial Growth Centre Samba.
2021_SIDCO_124292_3
E- NIT No 02 of 2021-2022 Dt 04-05-2021
Open Tender
Civil Works
Item Rate
40 days
SAMBA
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,000
EXECUTIVE ENGINEER, CONSTRUCTION DIVISION
Yes
14 Jun 2021
13 May 2021
5 Jun 2021
13 May 2021
3 Jun 2021
13 May 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth,1.5 mtr in width as well as 10 sqm on plan)including disposal of excavated earth, lead upto 50m and lift upto 1.50m, disposed earth to be leveled and neatly for all kinds of soil.
Providing and filling RBM including loading, unloading, carriage in layers 20 cm depth consolidation with 8-10 ton Road Roller, watering, dressing complete in all respects including all sort of taxes as per item no.1 (B)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering –All work upto plinth level. 1:4:8(1 cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All works upto plinth level 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size.
Centering and shuttering including strutting, propping etc and removal of form work for:-Foundation footings, base of columns
12mm thick plaster in 1:4
Carriage of material
Sand (cum)
Stone aggregate 5 KM
Dumping of stones horizontally back of R/wall excluding cost of stones
Supply of stones, Boulders of nominal size
Carriage of stones upto a lead of 5 kms
SHAM SINGH
AKASH GUPTA
Vivek Gupta
RAVINDER SINGH, GOVT. CONTRACTOR
M/S Padder Constructions PVT LTD
JASVIR SINGH
M/S HARI SHAM GOVT CONTRACTOR
naminder kumar govt. contractor
SUNIL KUMAR
aditya puri
MOHINDER SINGH CHARAK
M/S GUCHHU RAM
M/S AJAY KUMAR
M/S Gopal Singh Contractor
CHANDER SHAKHER GOVT. CONTRACTOR
Romy Choudhary
TRIKUTA BUILDERS
yash pal singh
VED KISHORE GUPTA , GOVT. CONTRACTOR
ASHOK SINGH
M/S Kulbushan Singh Contractor
INDER MOHAN GUPTA
Satish Samyal
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_242539.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .