| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC | ₹3.1 Cr | L1 | Accepted-AOC Found 1st Lowest |
| 2 | L2₹4.0 Cr+₹96.2 L (31.2%)Rejected-AOC | ₹4.0 Cr+₹96.2 L (31.2%) | L2 | Rejected-AOC Found 2nd Higher |
| 3 | L3₹4.2 Cr+₹1.1 Cr (35.8%)Rejected-AOC 2 1433 D 6 KAMAL COLONY SAHARANPUR UP PIN 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | ₹4.2 Cr+₹1.1 Cr (35.8%) | L3 | Rejected-AOC Found 3rd Highest |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-REJECTED DUE TO EXPERIENCE, MAAT, NET WORTH & OTHER CERFICATES NOT SUBMITTED BY FIRM |
Tender Value
₹4.1 Cr
EMD Value
₹4.1 L
Closing Date
15 Feb 2023, 1:00 pmClosed
SUPERINTENDING ENGINEER, EDC, BANDA
CHILLA ROAD, INDIRA NAGAR, BANDA
THE WORK OF ERECTION OF NEW 11/0.4 KV SUB-STATIONS, INCREASING CAPACITY OF VARIOUS 11/0.4 KV SUB-STATIONS, ERECTION/EXTENSION OF 11 KV HT/LT LINES AND REPAIRING ETC. AT VARIOUS PLACES IN DIST. BANDA
2023_DVVNL_768125_2
EDCBNDA-30/2022-23
Open Tender
Electrical Works
Turn-key
120 days
BANDA
AS PER ANNEXURED
2 documents required · 2 mandatory
₹5,900
DVVNL
₹4.1 L
O/O SE, EDC, BANDA
4 Sept 2024
3 Feb 2023
15 Feb 2023
3 Feb 2023
15 Feb 2023
3 Feb 2023
10 Feb 2023
ST Pole 11.0 Mtr. Long
PCC Pole 8.5 Mtr. Long
11/0.4 KV 25 KVA T/F
11/0.4 KV 63 KVA T/F
11/0.4 KV 100 KVA T/F
11/0.4 KV 250 KVA T/F
11/0.4 KV 400 KVA T/F
ACSR Weasel Conductor
ACSR Dog Conductor
ACSR Rabbit Conductor
ACSR Raccon Conductor
Cable LT ABC (3x120+1x95+1x16 Sq.mm.)
Cable LT ABC (3x95+1x70+1x16 Sq.mm.)
Cable LT ABC (3x50+1x25+1x16 Sq.mm.)
Stone Pad
11 KV V-Type Steel X-arm (65x65x6 mm)
Cross-arm holding clamp with N & B
F-Bracket for fitting top insulator
11 KV Pin Insulator with pin
11 KV Disc Insulator with fitting
MS Top Channel (125x65x2240 mm)
MS Dropper Channel (100x50x2028 mm)
MS Angle 75x75x6x2028 mm. with clamp & N/B (T/F Base)
M.S. Angle 65x65x6mm 4300mm with 4 clamp bracing
MS T-Off Channel (125x65x1300 mm)
Clamp for Channels
11 KV Fuse Set
Suspension Clamp
Dead End Clamp
Piercing clamp
Eye Hook Insulated with bolt.
LT Distribution Box 3-Phase
LT D.B. Clamp for 3 Phase
LT Distribution Box 1-Phase
LT D.B. Clamp for 1 Phase
Earthing Rod Complete (MS earthing rod of 20x2500 mm, 6 SWG earthing wire etc.)
Stay Complete (Stay rod 16x1800 mm, Stay wire 5 Kg., Stay clamp, Bolt & Nut with Grounting)
Danger Board with clamp & Nut/Bolt
Gaurding Angle with Clamp & nut-bolt
GI Wire 6 SWG
GI barbed Wire
LT Clamp with N & B
PG Clamp
Nut, Bolt & Washer of suitable sizes
SF Cluster for Cable Jointing
LT PVC Cable 4x16 Sq. mm.
LT PVC Cable 3.5x150/70 Sq.mm.
LT PVC Cable Al. 1x240 Sq.mm.
LT PVC Cable Al. 1x400 Sq.mm.
Al. Lugs for 100 KVA T/F
Al. Lugs for 250 KVA T/F
Al. Lugs for 400 KVA T/F
Alluminium Paint
Red Oxide Paint
Erection of single support structure on 11 Mtr. ST Pole, including complete HT/LT fittings with fixing of all accessories, includes also the work of safe cartage of poles with related accessories to work site as per direction of Engineer incharge/RESSPO manual.
Erection of double pole structure on 11 Mtr. ST Pole, including complete HT/LT fittings with fixing of all accessories, includes also the work of safe cartage of poles with related accessories to work site as per direction of Engineer incharge/RESSPO manual.
Erection of single support structure on 8.5 Mtr. PCC Pole, including complete HT/LT fittings with fixing of all accessories, includes also the work of safe cartage of poles with related accessories to work site as per direction of Engineer incharge/RESSPO manual.
Erection of double pole structure on 8.5 Mtr. PCC Pole, including complete HT/LT fittings with fixing of all accessories, includes also the work of safe cartage of poles with related accessories to work site as per direction of Engineer incharge/RESSPO manual.
Concreting/Grouting of erected 11 Mtr. long STP Poles as single pole structure as per direction of Engineer incharge/RESSPO manual. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. (arrangement of grouting material by firm).
Concreting/Grouting of erected 11 Mtr. long STP Poles as double pole structure as per direction of Engineer incharge/RESSPO manual. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. (arrangement of grouting material by firm).
Concreting/Grouting of erected 8.5 Mtr. long PCC Poles as single pole structure as per direction of Engineer incharge/RESSPO manual. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. (arrangement of grouting material by firm).
Concreting/Grouting of erected 8.5 Mtr. long PCC Poles as double pole structure as per direction of Engineer incharge/RESSPO manual. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. (arrangement of grouting material by firm).
Construction of new 11/0.4 kV, 100/250/400 KVA Transformer plinth of size 4x4x5 ft. above ground level and one ft. below the ground level of 9”. After excavation of 4” earth, brick ballast shall be provided and rammering will be done properly. After that a retaining wall of 9” width by first class brick in ratio 1:5 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. After this brick ballast shall be provided up to 6” from the earth level and proper rammering shall be done. One No. Jail of 12 mm MS tore shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervising Engineer.
Erection/Installation of 25 KVA Distribution Transformer on the newly erected double pole structure with fitting of all accessories, earthing & all connections both ends by suitable size cable, including the work of safe cartage of T/F, related accessories, cable etc.
Erection/Installation of 63 KVA Distribution Transformer on the existing/newly erected double pole structure with fitting of all accessories, earthing & all connections both ends by suitable size cable, including the work of safe cartage of T/F, related accessories, cable etc.
Erection/Installation of 100 KVA Distribution Transformer on the newly erected double pole structure/plinth with fitting of all accessories, earthing & all connections both ends by suitable size cable, including the work of safe cartage of T/F, related accessories, cable etc.
Erection/Installation of 250 KVA Distribution Transformer on the newly erected double pole structure/plinth with fitting of all accessories, earthing & all connections both ends by suitable size cable, including the work of safe cartage of T/F, related accessories, cable etc.
Erection/Installation of 400 KVA Distribution Transformer on the newly erected double pole structure/plinth with fitting of all accessories, earthing & all connections both ends by suitable size cable, including the work of safe cartage of T/F, related accessories, cable etc.
Demounting of 250 KVA T/F, including the work of safe carriage of the same T/F from work site to departmental store with loading & unloading.
Demounting of 100 KVA T/F, including the work of safe carriage of the same T/F from work site to departmental store with loading & unloading.
Demounting of 25 KVA T/F, including the work of safe carriage of the same T/F from work site to departmental store with loading & unloading.
Erection of 11 KV Line with laying, sagging, stringing, binding and jumpering of new ACSR Weasel/Dog/Rabbit/Raccon Conductor on 11.0 Mtr. Long STP poles with fitting of all accessories as per direction of supervising engineer/RESSPO manual. Includes the work of safe cartage of conductor & related fitting accessories. Above conductor also used in jumpering.
Erection of 11 KV Line with laying, sagging, stringing, binding and jumpering of new ACSR Weasel/Dog/Rabbit/Raccon Conductor on 8.5 Mtr. Long PCC poles with fitting of all accessories as per direction of supervising engineer/RESSPO manual. Includes the work of safe cartage of conductor & related fitting accessories. Above conductor also used in jumpering.
Erection of LT Line with laying, stringing, binding and sagging etc. of cable LT ABC (3x120+1x95+1x16 Sq.mm.) on the newly erected poles as per direction of supervising engineer/RESSPO manual. Includes the work of safe cartage of conductor & related fitting accessories.
Erection of LT Line with laying, stringing, binding and sagging etc. of cable LT ABC (3x95+1x70+1x16 Sq.mm.) on the newly erected poles as per direction of supervising engineer/RESSPO manual. Includes the work of safe cartage of conductor & related fitting accessories.
Erection of LT Line with laying, stringing, binding and sagging etc. of cable LT ABC (3x50+1x25+1x16 Sq.mm.) on the newly erected poles as per direction of supervising engineer/RESSPO manual. Includes the work of safe cartage of conductor & related fitting accessories.
Reconductoring of 33 KV Line on ACSR Dog Conductor, including the work of binding.
Reconductoring of 11 KV Line on ACSR Weasel Conductor, including the work of binding.
Reconductoring of 11 KV Line on ACSR Dog Conductor, including the work of binding.
Reconductoring of LT Line on ABC Conductor, including the work of binding.
AMIT ENGINEERING CORPORATION
M/S Sushil Kumar
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .