Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 LAdmitted-Fee/PreQual/Technical/Finance | -4.99% | ₹4.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
22 May 2026, 6:00 pmClosed
EXECUTIVE OFFICER
JHARSUGUDA MUNICIPALITY
RCC SLAB
2026_ORULB_128923_96
EO/JMC/02/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
WARDNUMBER14AND 15
Scan copy of regd. cert, PAN, GST clearance cert., experience cert., and other documents as per DTCN
2 documents required · 2 mandatory
₹2,000
₹5,000
Yes
17 Jun 2026
12 May 2026
25 May 2026
12 May 2026
22 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cement Concrete (1:2:4) using 12 mm size hard crusher broken chips of approved quality from approved quarry including hoisting and laying compacting watering curing including cost, conveyance, royalties taxes of all materials etc. completed as per direction of Engineer-in-charge. | - | cum | - | - |
| 2 | Cement concrete work of M20 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, tools and plants, water for curing etc.all complete, as per OPWD specification required for the work to finished items of work. | 1 | cum | 1 | ₹1 |
| 3 | Supplying cutting straitening the bent up uncoated HYSD reinforcement including cutting bending, binding, tying the grill and placing in position as required for R.C.C. Work including cost, conveyance, royalty taxes of rod and binding wire of 18 to 20 gauge etc. etc. complete as per direction of Engineer-in-charge of Rod and no separate payment will be made towards the weight of binding wire. | 1 | qntl | 1 | ₹1 |
| 4 | Rigid and smooth centring and shuttering C.C. work in foundation, plinth band and footing bases of columns. Pre cast slabs etc including false work and dismantling then after casting including cost of materials complete . | 1 | sqm | - | - |
| 5 | Labour for shifting and fitting and fixing (LS) | - | LS | - | - |
stage.html
html • 0.02 MB
finance_590641.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.73 MB
BOQ_590641.xls
BOQ • 0.29 MB
NIT.pdf
Tender Documents • 6.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .