| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.4 LAccepted-AOC T V MALAI | 1 | Accepted-AOC L1 Hence contract issued | |
| 2 | 2₹8.6 L+₹18,720.70 (2.22%)Rejected-Finance | 2 | Rejected-Finance Not L1 Hence Rejected | |
| 3 | Rejected-Technical 18 KODIMARA STREET PARANGIPETTAI CHIDAMBARAM T K CUDDALORE 608 502 | CUDDALORE | TAMIL NADU | 608502 | - | Rejected-Technical Prequal criteria not met |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
19 Dec 2023, 3:00 pmClosed
General Manager
The General Manager TSD 550 THIRUVANNAMALAI DISTRICT CO-OPERATIVE MILK PRODUCERS UNION LIMITED NO310 VELLORE ROAD VENGIKKAL THIRUVANNAMALAI
Construction of platform for RO water system, Compressor out door units in Vengikkal dairy, Thiruvannamalai DCMPU Limited
2023_TCMPF_397936_1
5343/Civil/Engg/2023
Open Tender
Civil Works
Works
120 days
Thiruvannamalai
As mentioned in tender document
2 documents required · 2 mandatory
₹0
₹10,000
Yes
Thiruvannamalai
6 Feb 2024
11 Dec 2023
20 Dec 2023
11 Dec 2023
19 Dec 2023
11 Dec 2023
15 Dec 2023
Amount
Earth work narrow excavation for foundation in all soils and sub soils and to full depth as may be directed except hard rock requiring blasting inclusive of shoring, shuttering and baling out water where ever necessary , refilling the sides of foundations with excabvated earth in layers of not more than 15cm thk watered, well rammed , consolidated and depositing the surplus earth on bank with initial lead of 10m and initial lift of 2m, clearing and leveling the site etc., complete as directed by the federation officers and as per standard specifications.
Supply and filling with Earth for foundation and basement to required thickness and in layers of not more than 15 cm thick, watered, well rammed and consolidated etc., complete as directed by the Federation Officers and as per standard specifications.
Supplying and filling with M sand for foundation and basement to required thickness and in lyers on not more than 30cm thick, watered ,well rammed and consolidated etc., complete as directed by the Federation officers and as per the technical Specifications
Plain Cement Concrete 1:5:10 using 40 mm size HBG stones for foundation including de-watering if found necessary and laid in layers of not more than 15 cm thick for flooring including rendering the top surface rough to take floor finish including side shuttering if required and compaction ,curing etc., complete as directed by the Federation officers and as per the technical Specifications
Supplying, erecting steel centering using M.S. Sheet of size 90X60cm and BG 10 gauge stiffened welded with M.S. angel of size 25X25X3mm laid over silver osk/country wood joist of size 10X6.5cm spaced at about 90cm centre to centre and supported by casurinaprops of 10 to 13cm dia spaced at 75cm center to centre for all type of RCC roof slab, lintel beam,T,L,beam landing slab plinth beam, grade beam, column footing, column , sunshade, facia, sloped roof, waist slab, etc., Including necessary suppoerts with all cross bracings filling slits and holes in the surfaces(the retrieved materials should be taken back by the contrator) and side shuttering etc., complete as directed by the Federation officers and as per standard specification. (Up to basement height Column surface)
Above basement height Column surface
Up to basement height Plain surface
0 to 3.30m height plain surface
Reinforced Cement Concrete M20 using 20 mm machine crushed hard granite broken stones excluding cost of centering and reinforcement but including compaction with mechanical vibrators and curing etc., complete as as directed by the federation officers and as per standard specifications. (Up to basement height)
Above basement up to 4.50m height
Supply, fabricating and placing in position of reinforcement grills for all RCC works including cost of steel rods, binding wires, labour for bending, cutting and tying etc., complete as as directed by the federation officers and as per standard specifications.
Brick work In cement mortar 1:5 (one part cement and five part sand) using second class ground moulded chamber burnt bricks of side 9"X4.5"X3" to line, level and to plumb on one face including necessar scaffolding, racking out jenits, curing etc., complete as directed by the Federation officers and as per standard specification. (Up to basement height)
Plastering with cement mortor 1:5 (one part cemnet and five part sand) 12mm thick including scaffolding, neatly finishing and curing etc., complete as directed by the Federation officers and as per standard specification.
Painting with two coat of plastic emulsion paint over one coat of primer etc., including scaffolding, neatly finishing and curing etc., complete as directed by the Federation officers and as per standard specification.
SAS CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .