Tender Value
₹5.0 Cr
EMD Value
₹10.1 L
Closing Date
17 Aug 2026, 3:00 pm
Earth work in forming embankment, construction of Retaining wall, side drain extension of bridges, Linking of track, etc., in connection with Extension of shunting neck at BG coaching complex/TPJ.
TPJ-14-2026-02
TPJ-14-2026-02
Open
Works - General
12 Months
Garhwa, Jharkhand
₹0
₹10.1 L
24 Jul 2026
24 Jul 2026
3 Aug 2026
percentage above or below the advertised value of schedule 'A1' (The advertised value is inclusive
of Railways escalation over CPWD-DSR 2023 basic value)
Item- 1 Retaining wall for the height of 2.0 meter above ground level and for a length 360meter.
S No. Item Description of Item Unit Qty Rate Amount
5.0 REINFORCEMENT CEMENT CONCRETE
5.9S FORM WORK
Centering and shuttering including
5.9 strutting, propping etc. and removal of form
5.9.1 Foundations, footings, bases of columns, Sqm 216 392.15 84704.4
etc. for mass concrete
5.9.2 Walls (any thickness) including attached Sqm 2088 842.5 1759140
2 pilasters, buttresses, plinth and string
Item- 2 Retaining wall for the height of 4.5 meter above ground level and length 360meter
S No. Item Description of Item Unit Qty Rate Amount
5.0 REINFORCEMENT CEMENT CONCRETE
5.9S FORM WORK
Centering and shuttering including
5.9 strutting, propping etc. and removal of form
5.9.1 Foundations, footings, bases of columns, Sqm 432 392.15 169408.8
etc. for mass concrete
5.9.2 Walls (any thickness) including attached Sqm 2448 842.5 2062440
2 pilasters, buttresses, plinth and string
Item- 3 Extension of Bridge no 1139 and 1138 of size 1.0 x1.2m for the extension length of 20 meter
S No. Item Description of Item Unit Qty Rate Amount
6.0 MASONRY WORK
6.1S General
Brick work with common burnt clay F.P.S.
6.1 (non modular) bricks of class designation
7.5 in foundation and plinth in:
13.0 FINISHING
13.1S CEMENT PLASTER (IN FINE SAND)
13.1 12 mm cement plaster of mix :
13.33S POINTING ON STONE WORK
Pointing on stone work with cement mortar
1:3 (1 cement : 3 fine sand) :
15.0 DISMANTLING AND DEMOLISHING
15.1S General
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Demolishing cement concrete manually/ by
mechanical means including disposal of
material within 50 metres lead as per
direction of Engineer - in - charge.
(including equivalent design mix)
Item- 4 Construction of side drain for a length of 360m.
S No. Item Description of Item Unit Qty Rate Amount
2.0 EARTH WORK
2.1S General
Earth work in excavation by mechanical
means (Hydraulic excavator) / manual
means in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on
2.8 plan), including dressing of sides and
ramming of bottoms, for all lift, including
getting out the excavated soil and disposal
of surplus excavated soil as directed, within
a lead of 50 m.
2.27 Supplying and filling in plinth with sand cum 64.8 2123.75 137619
2 under floors, including watering, ramming,
consolidating and dressing complete.
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position cement
concrete of specified grade excluding the
cost of centering and shuttering - All work
up to plinth level :
derived from natural sources : 6 graded
stone aggregate 40 mm nominal size
derived from natural sources)
5.0 REINFORCEMENT CEMENT CONCRETE
5.1S CAST IN SITU
Providing and laying in position specified
grade of reinforced cement concrete,
5.1 excluding the cost of centering, shuttering,
finishing and reinforcement - All work up to
III) derived from natural sources : 3 graded
stone aggregate 20 mm nominal size
derived from natural sources)
5.9S FORM WORK
Centering and shuttering including
5.9 strutting, propping etc. and removal of form
5.9.1 Foundations, footings, bases of columns, Sqm 434.52 392.15 170397.02
etc. for mass concrete
5.12S PRE-CAST RCC
5.12 Providing, hoisting and fixing above plinth cum 64.8 10585.9 685966.32
level up to floor five level precast reinforced
cement concrete work in string courses,
bands, copings, bed plates, anchor blocks,
plain window sills and the like, including the
6 cost of required centering, shuttering but ,
excluding cost of reinforcement with 1:1.5:3
(1 cement : 1.5 coarse sand (zone-III)
derived from natural sources : 3 graded
stone aggregate 20 mm nominal size
derived from natural sources).
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Schedule A2-All items which are covered by Unified Standard Schedule of rates 2021 for
Tiruchchirappalli Division - Except supply of cement and reinforcement steel. (The
Schedule tenderer/contractor shall quote a rate 'at par' or a collective percentage above or below the
advertised value of schedule 'A2' (The advertised value is inclusive of Railways escalation over
USSOR 2021 basic value)
Item- 1 Earth work in forming embankment for laying shuniting neck.
S No. Item Description of Item Unit Qty Rate Amount
1 011010 Preparation of foundation for Embankment 100 Sqm 6750.00 569.75 38458.13
by clearing, grubbing, stripping top soil
(average 150 mm) and stacking beyond
foundation area, thereafter ploughing and
pulverizing 150 - 200 mm of top of soil with
tractor trolley, mixing water to achieve OMC
with water sprinkler or left for natural
drying, as required, and compaction with
vibratory roller of suitable capacity to
achieve 98% MDD for laying first layer of
soil for embankment construction.
2 011020 Benching of existing embankment manually Kilometre 0.45 276440.22 124398.10
in steps of 30 cm height for
doubling/tripling works in running line to
provide proper amalgamation between the
old and new embankments as per RDSO
latest Specifications and guidelines
RDSO/2020//GE: IRS-0004 to the entire
satisfaction of Engineer in-charge. The item
includes uprooting and disposing of all the
vegetation, all lift, descends, ascends and
additional earthwork required for filling due
to removal of earth in benching in existing
bank. Note: (1) The benching Work shall be
done for a maximum height of 0.90 m at
any time based on the progress of
earthwork starting from toe of the
embankment. (2) Benching work shall be
certified and recorded before starting the
earth work. (3) Unit for payment shall be
km per metre height of the Bank. Height
here means representative average height
of the bank in the specified km taken from
cross sectional measurements for
earthwork. (4) Since the rate includes
earthwork in steps, payment under this item
shall be made after completion of earthwork
to that level. (5) Cut soil from bank shall not
be used in embankment construction and
disposed off away from bank as per the
direction of Engineer-in-charge.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Earthwork in filling in embankment, guide
bunds, around buried type abutments,
bridge gaps, trolley refuges, platforms etc.
with contractor's own earth conforming to
Soil Quality Class SQ1/SQ2/SQ3, after
preparation of foundations as applicable,
benching in existing banks wherever
required, spreading in layers with motor
grader, bringing the moisture content to
OMC, mechanical compaction to specified
density and dressing of bank to final profile
as per RDSO Specifications: RDSO/2020/GE:
IRS-0004 with latest correction slips. Note:
1) Foundation preparation, Benching
including additional earthwork on account
of this, wherever required, shall be paid
extra under relevant schedule item for
benching. 2) Payment for Earthwork under
this item shall be made based on the cross
section measurements calculated (i) with
original ground profile of existing bank
based on initial ground levels before doing
benching and (ii) final profile of the bank
worked out with final levels as per
prevailing guidelines.
Retaining wall for the height of 2.0 meter above ground level and for a length 360meter.Permanent
S No. Item Description of Item Unit Qty Rate Amount
Earthwork in excavation by mechanical
means (Hydraulic Excavator)/Manual Means
for foundations and floors of the bridges,
retaining walls etc. including setting out,
dressing of sides, ramming of bottom,
getting out the excavated material, back
filling in layers with approved material and
consolidation of the layers by ramming and
watering etc. including all lift, disposal of
surplus soil up to a lead of 300m, all types
of shoring and strutting with all labour and
material complete as per drawing and
technical specification as directed by
Engineer in charge. Note: This item will be
used for excavation work in connection with
other miscellaneous works also like side
drains, foundation for OHE masts and other
miscellaneous structures in connection with
Gauge Conversion, Doubling, New lines.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
2 022040 Providing and laying in position machine cum 108.00 4561.69 492662.52
batched, machine mixed and machine
v i b r a t e d Cement Concrete of specified
grade as per approved Design Mix (mixed in
Mobile Concrete Batching/Mixing Plant at
site or RMC from approved plants) using
20mm graded crushed stone aggregate and
coarse sand of approved quality in RCC raft
foundation & Pile cap including finishing,
using Plasticiser in approved proportions (as
per IS:9103), to modify workability without
impairing strength and durability complete
as per specifications and direction of the
Engineer in charge. Note: 1. Payment for
cement, reinforcement and shuttering shall
be made extra under relevant item. 2.
Plasticiser shall invariably be used in
approved proportion to increase workability
with minimum possible quantity of cement
for all grade of Design Mix Concrete unless
it is specifically approved citing reasons for
not using plasticiser at the stage of Mix
Design and in that case deduction shall be
made as per relevant item.
Providing and laying in position machine
batched, machine mixed and machine
v i b r a t e d Cement Concrete of specified
grade as per approved Design Mix (mixed in
Mobile Concrete Batching/Mixing Plant at
site or RMC from approved plants) using
20mm graded crushed stone aggregate and
coarse sand of approved quality for the
following Reinforced cement concrete
structural elements up to height of 9.0 m
from foundation top level, including
finishing, using Plasticiser in approved
proportions (as per IS:9103), to modify
workability without impairing strength and
durability complete as per specifications
and direction of the Engineer in charge.
Note: 1. Payment for cement, reinforcement
and shuttering shall be made extra under
relevant item. 2. Plasticiser shall invariably
be used in approved proportion to increase
workability with minimum possible quantity
of cement for all grade of Design Mix
Concrete unless it is specifically approved
citing reasons for not using plasticiser at
the stage of Mix Design and in that case
deduction shall be made as per relevant
4 022060 Providing and laying Plain Cement Concrete cum 91.80 4630.33 425064.29
1:3:6 with graded stone aggregate of 40mm
nominal size, in foundation and floors,
retaining walls of bridges including
mechanical mixing, vibrating, pumping and
bailing out water where ever required with
all materials and labour complete but
excluding the cost of cement and shuttering
as per drawings and technical specifications
as directed by Engineer.
5 022070 Providing and fixing Weep Holes in Metre 100.00 313.33 31333.00
Abutments, Wing walls and Return walls
etc., of new bridges with 110mm dia UPVC
pipe Type A ISI marked with all contractor's
men, material, transportation, all taxes as
per specifications and as directed by
Engineer-in-Charge.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
6 052030 Supply and laying of quarry dust including cum 91.80 2052.25 188396.55
consolidation, supply of all materials,
labour, lead, lift, tools, plants, crossing of
tracks as per drawing and technical
specification as directed by the Engineer in
charge in case loose slush is encountered at
site of foundation before casting the
foundation or laying the filtering media.
Item- 3 Retaining wall for the height of 4.5 meter above ground level and length 360meter
S No. Item Description of Item Unit Qty Rate Amount
1 013080 Shoring with 'Z' section MS sheet piles side Sqm 720.00 1010.15 727308.00
by side in all kinds of soil mechanically or
manually as per approved drawing with
contractor's own arrangement complete in
all respects and removal of sheet piles after
completion of the work as directed by
engineer in-charge Note: Payment will be
made as per actual driven length of pile.
Earthwork in excavation by mechanical
means (Hydraulic Excavator)/Manual Means
for foundations and floors of the bridges,
retaining walls etc. including setting out,
dressing of sides, ramming of bottom,
getting out the excavated material, back
filling in layers with approved material and
consolidation of the layers by ramming and
watering etc. including all lift, disposal of
surplus soil up to a lead of 300m, all types
of shoring and strutting with all labour and
material complete as per drawing and
technical specification as directed by
Engineer in charge. Note: This item will be
used for excavation work in connection with
other miscellaneous works also like side
drains, foundation for OHE masts and other
miscellaneous structures in connection with
Gauge Conversion, Doubling, New lines.
3 022040 Providing and laying in position machine cum 410.40 4561.69 1872117.58
batched, machine mixed and machine
v i b r a t e d Cement Concrete of specified
grade as per approved Design Mix (mixed in
Mobile Concrete Batching/Mixing Plant at
site or RMC from approved plants) using
20mm graded crushed stone aggregate and
coarse sand of approved quality in RCC raft
foundation & Pile cap including finishing,
using Plasticiser in approved proportions (as
per IS:9103), to modify workability without
impairing strength and durability complete
as per specifications and direction of the
Engineer in charge. Note: 1. Payment for
cement, reinforcement and shuttering shall
be made extra under relevant item. 2.
Plasticiser shall invariably be used in
approved proportion to increase workability
with minimum possible quantity of cement
for all grade of Design Mix Concrete unless
it is specifically approved citing reasons for
not using plasticiser at the stage of Mix
Design and in that case deduction shall be
made as per relevant item.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Providing and laying in position machine
batched, machine mixed and machine
v i b r a t e d Cement Concrete of specified
grade as per approved Design Mix (mixed in
Mobile Concrete Batching/Mixing Plant at
site or RMC from approved plants) using
20mm graded crushed stone aggregate and
coarse sand of approved quality for the
following Reinforced cement concrete
structural elements up to height of 9.0 m
from foundation top level, including
finishing, using Plasticiser in approved
proportions (as per IS:9103), to modify
workability without impairing strength and
durability complete as per specifications
and direction of the Engineer in charge.
Note: 1. Payment for cement, reinforcement
and shuttering shall be made extra under
relevant item. 2. Plasticiser shall invariably
be used in approved proportion to increase
workability with minimum possible quantity
of cement for all grade of Design Mix
Concrete unless it is specifically approved
citing reasons for not using plasticiser at
the stage of Mix Design and in that case
deduction shall be made as per relevant
5 022060 Providing and laying Plain Cement Concrete cum 91.80 4630.33 425064.29
1:3:6 with graded stone aggregate of 40mm
nominal size, in foundation and floors,
retaining walls of bridges including
mechanical mixing, vibrating, pumping and
bailing out water where ever required with
all materials and labour complete but
excluding the cost of cement and shuttering
as per drawings and technical specifications
as directed by Engineer.
6 022070 Providing and fixing Weep Holes in Metre 100.00 313.33 31333.00
Abutments, Wing walls and Return walls
etc., of new bridges with 110mm dia UPVC
pipe Type A ISI marked with all contractor's
men, material, transportation, all taxes as
per specifications and as directed by
Engineer-in-Charge.
7 052030 Supply and laying of quarry dust including cum 91.80 2052.25 188396.55
consolidation, supply of all materials,
labour, lead, lift, tools, plants, crossing of
tracks as per drawing and technical
specification as directed by the Engineer in
charge in case loose slush is encountered at
site of foundation before casting the
foundation or laying the filtering media.
8 052260 Dewatering of natural or accumulated water HP Hour 500.00 74.78 37390.00
from any location. Payment to be done for
Horse power of pump multiplied by
Hiring of machinery for minor miscellaneous
works for short duration including
operator/driver, fuel, lubricants and
consumable. The contractor shall arrange
all statutory permits as required by rules
and regulations prevailing in the area of
work. Payment shall be made for actual
working hours at site.
9 211201 JCB Backhoe Loaders 3DX Plus or similar Hour 500.00 867.49 433745.00
with minimum 1.10 cum bucket capacity
Item- 4 Extension of Bridge no 1139 and 1138 of size 1.0 x1.2m for the extension length of 20 meter
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
S No. Item Description of Item Unit Qty Rate Amount
1 013080 Shoring with 'Z' section MS sheet piles side Sqm 400.00 1010.15 404060.00
by side in all kinds of soil mechanically or
manually as per approved drawing with
contractor's own arrangement complete in
all respects and removal of sheet piles after
completion of the work as directed by
engineer in-charge Note: Payment will be
made as per actual driven length of pile.
Earthwork in excavation by mechanical
means (Hydraulic Excavator)/Manual Means
for foundations and floors of the bridges,
retaining walls etc. including setting out,
dressing of sides, ramming of bottom,
getting out the excavated material, back
filling in layers with approved material and
consolidation of the layers by ramming and
watering etc. including all lift, disposal of
surplus soil up to a lead of 300m, all types
of shoring and strutting with all labour and
material complete as per drawing and
technical specification as directed by
Engineer in charge. Note: This item will be
used for excavation work in connection with
other miscellaneous works also like side
drains, foundation for OHE masts and other
miscellaneous structures in connection with
Gauge Conversion, Doubling, New lines.
Providing and laying in position Plain
cement concrete of specified Nominal Mix
f o r miscellaneous works like side drains,
foundation for OHE masts and other
miscellaneous structures excluding the cost
of Cement, centering and shuttering - All
work up to plinth level :
III) : 3 graded stone aggregate 20 mm
4 graded stone aggregate 40 mm nominal
Providing and laying in position machine
batched, machine mixed and machine
v i b r a t e d Cement Concrete of specified
grade as per approved Design Mix (mixed in
Mobile Concrete Batching/Mixing Plant at
site or RMC from approved plants) using
20mm graded crushed stone aggregate and
coarse sand of approved quality for the
following Reinforced cement concrete
structural elements up to height of 9.0 m
from foundation top level, including
finishing, using Plasticiser in approved
proportions (as per IS:9103), to modify
workability without impairing strength and
durability complete as per specifications
and direction of the Engineer in charge.
Note: 1. Payment for cement, reinforcement
and shuttering shall be made extra under
relevant item. 2. Plasticiser shall invariably
be used in approved proportion to increase
workability with minimum possible quantity
of cement for all grade of Design Mix
Concrete unless it is specifically approved
citing reasons for not using plasticiser at
the stage of Mix Design and in that case
deduction shall be made as per relevant
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
6 024010 Providing and casting machine batched, cum 96.00 5017.86 481714.56
machine mixed and machine vibrated
Cement Concrete of specified grade as per
approved Design Mix, mixed in Mobile
Concrete Batching/Mixing Plant at site or
RMC from approved plants, (Cast in-
Situ/Pre-cast) in bottom/top slab, side walls,
toe wall and sumps haunch filling head
walls, thrust bed or any other component
using 20mm graded crushed stone
aggregate and coarse sand of approved
quality of RCC box of any size including
finishing, Plasticiser in approved proportions
(as per IS:9103), to modify workability
without impairing strength and durability,
complete as per drawings and technical
specifications as directed by Engineer in
c h a r g e . N o t e : 1. Payment for cement,
reinforcement and shuttering shall be made
extra under relevant item. 2. Plasticiser
shall invariably be used in approved
proportion to increase workability with
minimum possible quantity of cement for all
grade of Design Mix Concrete unless it is
specifically approved citing reasons at the
stage of Mix Design and in that case
deduction shall be made as per relevant
Centering and shuttering including
strutting, propping etc. and removal of form
7 025031 All types of bridge sub-structures, e.g. pier, Sqm 994.00 765.08 760489.52
abutment, wing wall, retaining wall, RCC
box type foundations, Abutment cap, Pier
Cap, Inspection Platform & Pedestal over
Pier cap, Fender wall, Diaphragm wall etc.
up to 5m above ground level
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
8 052020 Providing and laying 300mm thick (average) cum 16.00 3322.34 53157.44
Dry Stone flooring with boulders of not less
than 35kg each in weight, hand packed with
surface levelled off to the correct section
with hammer dressing as necessary on the
ground including filling the gaps with quarry
spalls and ordinary sand complete including
cost of supply of all materials, labour, lead,
lift, tools, plants, crossing of tracks and the
like as per drawing and technical
specification as directed by Engineer in
9 052210 Providing cast in situ bridge number plaques Each 2.00 1001.17 2002.34
as per Railway drawing in cement concrete
1:2:4 mix using 20mm hard stone
aggregate embedded in 30mm notch in
Bridge parapet coping duly engraving the
letter and figures and an arrow indicating
the direction of flow and finishing the top
exposed surface with cement mortar 1:3,
painting letters and figures with two coats
of black enamel paint on two coats of white
background with all labour, tools, cement,
paint etc. with all leads and lifts.
10 052240 Supplying, spreading and filling coarse sand cum 24.00 5628.34 135080.16
(no cohesive materials to be used) of
approved quality including watering and
ramming in foundation, behind the
abutment, wing wall, retaining wall in layers
not exceeding 150mm thick including its
compaction as per direction of Engineer-in-
charge. The rate includes all lead, lift,
ascent, descent, crossing of Railway line
etc. complete with contractor's labour,
materials, tools and plant.
11 052260 Dewatering of natural or accumulated water HP Hour 300.00 74.78 22434.00
from any location. Payment to be done for
Horse power of pump multiplied by
Hiring of machinery for minor miscellaneous
works for short duration including
operator/driver, fuel, lubricants and
consumable. The contractor shall arrange
all statutory permits as required by rules
and regulations prevailing in the area of
work. Payment shall be made for actual
working hours at site.
12 211201 JCB Backhoe Loaders 3DX Plus or similar Hour 20.00 867.49 17349.80
with minimum 1.10 cum bucket capacity
Item- 5 Permanent way works
S No. Item Description of Item Unit Qty Rate Amount
1 063080 Lubrication of Elastic Rail Clips on PSC ERC 2464.00 2.69 6628.16
sleepers as per procedure prescribed in
latest edition of IRPWM with Railway's
2 071030 Dismantling the existing BG Buffer-stop laid Set 1.00 5818.47 5818.47
with rails & wooden/ST sleepers including
leading the dismantled Buffer stop
materials to nominated places within
station yard limits and stacking as material-
wise and classification-wise duly releasing
all fittings carefully without causing any
damage with all contractor's labour, tools,
with all lead and lifts, crossing of tracks if
any, etc., complete as directed by the
Engineer-in-charge.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
3 083030 Boxing and profiling of ballast as per TRM 360.00 29.22 10519.20
procedure prescribed in latest edition of
IRPWM including cess dressing on both
sides of track. The work will include
removing excess ballast from track and
putting the same in crib and shoulder by
leading to a maximum of 50m including
crossing of track, deweeding on ballast
section etc and as directed by Engineer-In
25mm gap Cess Welding with Railway's
welding portion and finishing of weld to
meet the prescribed tolerances and pass all
stipulated tests with Contractor's labour,
materials, consumables, tools, equipments
etc. to complete the work in all respect as
per IR's "Manual for Fusion Welding of Rails
by Alumino - Thermic Process" with latest
correction slips, including all required
handling and rehandling of rails, marking of
welded joint, painting weld collar with
anticorrosive paint, as directed by Engineer
in charge. Note: 1. Only welding portion and
related accessories as per Annexure - I shall
be supplied by Railways. 2. Welding shall be
carried out only by trained welder having
valid competency certificate. 3. Hydraulic
Weld trimmer shall be used for chipping and
profile Grinder for finishing.
Single shot crucible fitted with Automatic
Tapping Thimble Technology, 3 pieces
Mould (Zircon washed) and Compressed Air
Petrol heating technique.
5 121010 Dismantling of existing LWR/SWR track of TRM 100.00 216.96 21696.00
any structure, removing rails, sleepers, fish
plates, cutting of rails, segregation and
stacking of released Rails, Sleepers and
fitting at nominated location in countable
manner within a free lead of 500m, levelling
of ballast to correct profile for laying new
t r a c k over it, all as per direction of
Engineer-in-Charge.
Providing Centre Line / Rail Level, reference
Pegs on formation at an interval of 30
metres on one side or at centre of proposed
/ existing track, as directed by engineer in-
charge for linking of new track / CTR / Deep
Screening / Lifting / Lowering works, duly
embedding in formation including marking
with contractor's paint. Note: (1) Rails/tie
bar of suitable size bar shall be supplied by
the Railways from nearest Stores Depot. In
case of hard wood peg, the hard wood will
be supplied by the contractor. (2)
Excavation and concrete work, if required,
will be paid separately.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
7 123020 Installation of reference points for track Each 6.00 708.60 4251.60
centre line in main and loop lines, in
straight or curve portion, SRJ for turnouts,
heel of crossing (HOC), locations of
derailing switches, switch expansion joints
etc. away from formation on firm ground at
known offset with MS Angles of
50mmx50mmx5mm thick of length 1.80 m
each, founded in concrete block of size
30cm x 30cm x 45cm of nominal mix 1:3:6,
including painting to reference pegs with
two coats of enamel paints on exposed
surface, as directed by Engineer In charge.
Note: Earth work and Cement concrete will
be paid under relevant items.
Linking of BG track (except at LC, Bridges
and SEJs) with any type of rail section and
sleeper of specified density, on ballast bed
spread and compacted with suitable roller,
over prepared formation including leading
free rails/welded panels available along the
alignment on to formation, leading and
spreading all fittings and fastenings,
spreading of sleepers at specified spacing,
squaring, placing of rails over sleepers and
fixing rails to sleepers with all types of
fittings and fastenings to correct gauge &
alignment, lubrication of fittings and
fastenings with contractor's grease as per
IRPWM standards with contractors labour,
tools, consumables, with all lead, lifts etc.
complete and raising, levelling and initial
packing of track to make it fit for 30 kmph
and meet other prerequisites prescribed in
Indian Railway Track Machine Manual for
deployment of Tamping Machine. Note:
1.Rail cutting and Hole drilling shall be paid
separately. 2.Spreading of ballast and
compaction shall be paid separately under
8 123042 For sleeper density of 1540 sleepers per km TRM 400.00 325.44 130176.00
Through packing of track, as per procedure
prescribed in latest edition of Indian
Railways Permanent Way Manual
9 131011 For PSC sleeper Track with Sleeper Density TRM 400.00 115.94 46376.00
of 1540 Sleepers/Km or more
Anti-corrosive painting of rail on running
track of any sleeper density on web, foot
etc. including liner contact area (excluding
bottom of foot) and fishing plane as per
requirement with two coats of thickness of
100 microns each by bituminous black paint
confirms to IS-9862 of reputed make
including painting of liners, ERCs and
including surface preparation, as a
complete job as per procedure prescribed in
latest edition of IRPWM Note: 60% of
payment shall be made if painting on only
gauge face side is done.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Quick cutting with abrasive rail cutter of all
types of rail sections including wear
resistant, head hardened rails up to 110
UTS, with contractors tools & plants,
equipment, consumable with all lead & lift
etc. complete as directed by Engineer in-
charge. Abrasive Rail Cutter will be as per
RDSO Specification No. TM/SM/1 (Rev. 01 of
2012) with latest status of RDSO; Rail
Cutting Wheel Abrasive Disc will be as per
RDSO Specification No.TM/SM/2 (Rev. 01 of
Drilling holes of 16 mm to 32 mm dia. with
Rail Drilling machine including chamfering
with appropriate chamfering tools in all
types of rail section with contractor's tools
& plants, equipment, consumable with all
lead & lift etc. complete, as directed by
Engineer in-charge. Rail Drilling Machine will
be as per RDSO Specification No. TM/SM/3,
Loading of rails of any section and length up
t o 1 3 metres in Wagons / Truck / trailer
including lead up to 50 metres and lift up to
13 171014 I n Wagon where mechanical handling is MT 48.00 165.78 7957.44
possible and traffic block is not required or
in Truck/trailer.
Unloading of rails of any section and length
up to 13 metre, in neat manner for Railway
usage from departmental material train
(DMT) or contractor's / Railway's
Truck/trailer including lead up to 50 metre,
lift up to 5 metre and stacking in prescribed
14 171053 From Wagon where mechanical handling is MT 48.00 121.63 5838.24
possible and traffic block is not required or
in Truck / trailer.
Loading of 52kg / 60kg PSC normal line and
special sleepers up to 2.75 metre length in
Depot / Station / Mid-section between
stations in a neat manner to departmental
material train (DMT) or contractor's /
Railway's Truck/Trailer with crane or any
other means including crossing of one track
with free lead up to 250 metre and lift up to
5 metre, if required with contractor's labour,
tools & plants, machinery, consumables etc.
Note: In case of any damage to sleeper
during loading, penalty @ 50% of the all
inclusive cost of sleeper shall be levied.
15 172014 I n Wagon where mechanical handling is MT 214.98 132.26 28433.25
possible and traffic block is not required or
in Truck / trailer
Loading, leading and unloading of all types
of P.Way fittings and all other miscellaneous
material except Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: Lead shall
be the shortest motorable road length
between the points of loading and
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Transportation of Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: 1 . Lead
shall be the shortest motorable road length
between the points of loading and
unloading. 2. Loading and unloading shall
be paid extra under relevant items.
over item no. 172057
Unloading of 52kg / 60kg PSC line and
special sleepers up to 2.75 metre length in
Depot / Station / Mid-section between
stations in neat manner for Railway usage
from departmental material train (DMT) or
contractor's / Railway's Truck/Trailer with
crane or any other means including crossing
of one track and lead up to 250 metre & lift
up to 5 metre with contractor's labour, tools
& plants, machinery, consumables etc.
Note: In case of any damage to sleeper
during loading, penalty @ 50% of the all
inclusive cost of sleeper shall be levied.
Hiring of machinery for minor miscellaneous
works for short duration including
operator/driver, fuel, lubricants and
consumable. The contractor shall arrange
all statutory permits as required by rules
and regulations prevailing in the area of
work. Payment shall be made for actual
working hours at site.
20 211201 JCB Backhoe Loaders 3DX Plus or similar Hour 60.00 867.49 52049.40
with minimum 1.10 cum bucket capacity
21 211250 Manufacturing and fixing buffer stop with Each 1.00 17110.32 17110.32
Railway supplied rails, cutting, including
bending of rails as per plan ,with all
contractor's labour, materials, tools, plants
etc. and all lead and lift including crossing
of track where necessary and as directed by
Engineer in charge at site. Note:
Excavation, fixing rails in cement concrete,
drilling of holes will be paid separately.
Item- 6 Supply and spreading of track ballast
S No. Item Description of Item Unit Qty Rate Amount
Manufacturing, supply and stacking of
machine crushed Track Ballast conforming
to RDSO Specification (IRS-GE-1) with latest
correction slips at Railway depot or
nominated location. Note: Distance of
nearest quarry mentioned in each sub-item
is only for the purpose of selecting the
items for preparation of estimates/tender
schedule, based on the minimum distance
b e t w e e n nearest quarry and centre of
supply points and will not affect the
selection of quarry during physical supply in
any way till prescribed specification is met
1 085014 When distance of nearest quarry is more cum 1038.00 1520.43 1578206.34
than 30 km and up to 40 km
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
2 123030 Spreading of ballast, from existing stacks cum 1038.00 49.15 51017.70
available along formation on top or at cess,
in required uniform thickness, compaction
of ballast layer laid on new formation at all
the locations with smooth wheeled power
roller of 8-10 tonne capacity to sufficient
number of passes to form consolidated
ballast bed of approximately 250mm
thickness to a width of 4m symmetrical to
centre line of proposed track in correct line
& level with all ascents & descents, as
directed by Engineer in-charge. Note: Item
is inclusive of (a) providing ramp for taking
roller to formation and removing the same
& making good formation after completion
of work; (b) redistribution & leveling of
excess ballast while rolling to obtain
uniform plane cambered surface.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Annexure-V-VA-16082023.pdf
ATTACHMENT
SpecialConditions-updationoflabourdata.pdf
ATTACHMENT
JPO.pdf
ATTACHMENT
Registersatworksite.pdf
ATTACHMENT
Tenderformfirstpagesecondpage.pdf
ATTACHMENT
annexureforcommercialcomplaince.pdf
ATTACHMENT
annexurefortechnicalcomplaince18122022.pdf
ATTACHMENT
PPEforsafetyinconstructionsite_1.pdf
ATTACHMENT
GCC-April-2022updatedandCSNo-10.pdf
ATTACHMENT
ACSNo.11forGCC2022dt.13.3.26.pdf
ATTACHMENT
Contractorse-MBboardletters_1.pdf
ATTACHMENT
RDSOcircularforsteelreinforcement.pdf
ATTACHMENT
SpecialconditionsforsubmissionofBG.pdf
ATTACHMENT
specificationforworks.pdf
ATTACHMENT
MaintenanceperiodHQLetterdt.17.02.26.pdf
ATTACHMENT
BOCWWcessRBletterdt.02.01.2026.pdf
ATTACHMENT
FormforPoliceverificationofcontractualstaff.pdf
ATTACHMENT
PlanofERCapplicatorcumExtractor.pdf
ATTACHMENT
specialconditionofcontract-cc-tpj_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].