| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹47.9 LAdmitted-Finance 958 1 PHASE II ADARSH NAGAR P O P S JAGATPURA JAIPUR 302017 RAJASTHAN | JAIPUR | RAJASTHAN | 302017 | -2.01% | ₹47.9 L | L1 | Admitted-Finance |
| 2 | L2₹48.4 LAdmitted-Finance AT VILLAGE KUMHARGADIYA P O BAJTO P S GIRIDIH DIST GIRIDIH | -1.00% | ₹48.4 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical 11 BISHANPUR PANCHAMBA GIRIDIH JHARKHAND 815316 GIRIDIH JHARKHAND 815316 UDYAM JH 08 0012570 | GIRIDIH | JHARKHAND | 815316 | - | - | - | Rejected-Technical Technical not Accept |
| 4 | Rejected-Technical SHUBHRA NIWAS GT ROAD ISRI BAZAR NIMIAGHAT GIRIDIH | - | - | - | Rejected-Technical Technical not Accept |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Technical not Accept |
Tender Value
₹48.9 L
EMD Value
₹97,900
Closing Date
25 Mar 2026, 5:00 pmClosed
EXECUTIVE OFFICER
NREP GIRIDIH
Construction of bridge on river village Alaytand Panchayat Fulchi under Gandey block.
2026_NREPG_111782_1
NREP/GIRIDIH/32/2025-26 GR. 1
Open Tender
Civil Works
180 days
NREP
Please refer tender documents
2 documents required · 2 mandatory
₹5,000
₹97,900
18 Jun 2026
18 Mar 2026
27 Mar 2026
18 Mar 2026
25 Mar 2026
18 Mar 2026
Earthwork in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material) Mechanical means. Depth upto 3m (not requiring blasting) in ordinary soil
Ordinary Rock
P.C.C. M10 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days)
P.C.C. M15 (1:2:4) grade levelling course below approach slab complete as per design and specification below Approach Slab
Plain/Reinforced Cement Concrete in open foundation complete as per drawing and technical specification. (R.C.C. Grade M 25 using batching plant,transit mixer & manual placing)
Plain/Reinforced Cement Concrete in open foundation complete as per drawing and technical specification. (R.C.C. Grade M 25 using batching plant,transit mixer & concrete pump) Height upto 5 M
Construction of railing of M 30 grade in – situ with 20 mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawing and technical specification.
Furnishing and placing Reinforcement/Pre stressed cement concrete in Super-Structure as per drawing and technical specification, RCC Grade M 30 Solid Slab (Height upto 5 M)
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and technical specification.
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and technical specification.
Providing and fixing 20mm thick compresible fibre board in expansion complete as per drawing &Technical specification.
Drainage spout complete as per drawing and technical specification.
Providing weep holes in Brick Masonry/Plain/Reinforced Concrete Abutment, Wing Wall/Return Wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and technical specification.
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specification.
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specification
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specification.
Construction of embankment with approved materials obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300–2) .
Compacting original ground supporting embankment (Rolling with vibratory roller)
Granular material Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification.
Construction of Sub Grade & Earthen Shoulder ( Construction of subgrade and earthen shoulders with approved material obtained form borrow pits with all lift & leads , transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) with lead up to 250 m as per Technical Specification claouse 303.1
Granular Sub base with close Graded Material (Table:- 400-1) By mix in place method ( Construction of granular sub-base by providing well graded material, spreading in uniform layers with moter grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with sooth wheeel roller to achieve the desired density, complete as per clause 401) (ii) For Grading-II Material
excavation for strcutures - Earthwork in excavation for structure as per drawing and technical specification in ordinary soil by mechanical means upto 3m
Sand filling in foundation trenches as per Drawing and Technical specification.
P.C.C. M10 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days)
random rubble masonry work in cement mortar (1:3) for foundation complete as per drawing and technical specification.
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification. Granular material
Random Rubble masonry work in cement mortar 1:3 for sub–structure complete as per drawing and technical specification.
Providing weep holes in Brick Masonry/Plain/ Reinforced Concrete Abutment, Wing Wall/Return Wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and technical specification.
P.C.C.M15 (1:2:4) in sub structure (Plain Cement Concrete 1:2:4 nominal mix in sub structure complete as per drawings and technical specifications
Carriage of Materials Cement
Steel
stone chips
Stone Boulder
Stone Metal
Goods & Service Tax (G.S.T.) -
Labour Cess -
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
SBD.pdf
Tender Documents • 1.38 MB
BOQ_150925.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid