Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.3 CrAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹98.6 Cr+₹8.3 Cr (9.16%)Rejected-Finance BOMDILA AP | SHI YOMI | ARUNACHAL PRADESH | 791001 | L2 | Rejected-Finance too high |
| Sl No | Description | Qty | Unit | M/S TTC INFRA INDIA L2 | M/s Drengo Construction L1 |
|---|---|---|---|---|---|
| 1.00Site Clearance | |||||
| 1.10 | Clearing and Grubbing road land | 15.75 | Hect. | 84,270 ₹13,27,252.5 | 77,625 ₹12,22,593.75 Lowest |
| 1.20 | Cutting of tree including cutting of trunks, branches and removal | 21 | Km | 78,270 ₹16,43,670 | 72,100 ₹15,14,100 Lowest |
| 2.00Earthwork (Formation Width-7.50 m) | |||||
| 2.10 | In ordinary soil (60% of 492000) | 2,95,200 | Cum | 230 ₹6,78,96,000 | 205 ₹6,05,16,000 Lowest |
| 2.20 | In ordinary rock (20% of 492000) | 98,400 | Cum | 340 ₹3,34,56,000 | 305 ₹3,00,12,000 Lowest |
| 2.30 | In hard rock (20% of 492000) | 98,400 | Cum | 440 ₹4,32,96,000 | 400 ₹3,93,60,000 Lowest |
| 3.00Pavement (Carriageway width-5.50m) Hard Shoulder-0.5m both sides | |||||
| 3.10 | Lime stabalization for Sub-Grade 200 mm (60%*20699)*7.5*0.2) | 18,629 | Cum | 1,280 ₹2,38,45,120 | 1,170 ₹2,17,95,930 Lowest |
| 3.20 | GSBC 150mm for full streatch (20699*5.5*0.15) | 17,077 | Cum | 2,810 ₹4,79,86,370 | 2,580 ₹4,40,58,660 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.0 Cr
Closing Date
3 Jul 2025, 5:00 pmClosed
Executive Engineer
O/o Executive Engineer, Anini Division PWD, Govt of Arunachal Pradesh Anini, Arunachal Pradesh
C/O ROAD FROM AMULI NH 313 TO ATHUNLI VIA LEYAKA PASS (21 KM) IN ARUNACHAL PRADESH UNDER NESIDS ROADS.
2025_PWDAP_2596_1
AD/S-10/NIT/2025-26/330-38
Open Tender
Civil Works
Turn-key
1095 days
Anini
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
EE, PWD, Anini Division, Anini, Dibang Valley, AP.
₹1.0 Cr
Yes
Anini
6 Aug 2025
17 Jun 2025
4 Jul 2025
17 Jun 2025
3 Jul 2025
17 Jun 2025
2 Jul 2025
Amount
Site Clearance
Clearing and Grubbing road land
Cutting of tree including cutting of trunks, branches and removal
Earthwork (Formation Width-7.50 m)
In ordinary soil (60% of 492000)
In ordinary rock (20% of 492000)
In hard rock (20% of 492000)
Pavement (Carriageway width-5.50m) Hard Shoulder-0.5m both sides
Lime stabalization for Sub-Grade 200 mm (60%*20699)*7.5*0.2)
GSBC 150mm for full streatch (20699*5.5*0.15)
Hard shoulder @ 0.50 m both sides (20699*0.5*0.15)
WMM - 250 mm (20699*5.5*0.250)
Prime coat (20699*5.5)
Tack coat (20699*5.5)
Drains
CC Drain
Unlined Drain
Protection work
Stone Masonary Breast Wall 2m Ht.
Stone Masonary Breast Wall 3m Ht.
Stone Masonary Retaining Wall 2m Ht.
Stone Masonary Retaining Wall 3m Ht.
Stone Masonary Retaining Wall 4m Ht.
Cross Drainage Works
RCC Box Culvert (2mx2m)
RCC Box Culvert (3mx3m)
RCC Box Culvert (6mx3m)
RCC Box Culvert (6mx4m)
Traffic Signs and Road Markings
Km Stone
Road Marking
Direction Sign Board
Place indentification (minimum 9 Sqm)
Road Studs
Solar Studs
W metal beam crash barrier
Bridges
RCC Minor Bridge (Composite Girder)
RCC Minor Bridge (Solid Slab-10m Span) 6 Nos
Maintenance cost for 5 years
1st Year (Defect Liability)
2nd Year (0.5% of B)
3rd Year (0.5% of B)
4th Year (0.5% of B)
5th Year (0.5% of B)
M/S TTC INFRA INDIA (BID ID -7684)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
boqcomparativechart.xlsx
BOQ • 0.01 MB
LOA.pdf
Tender Documents • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .