Tender Value
₹33.2 L
EMD Value
₹33,500
Closing Date
10 Nov 2022, 3:00 pmClosed
Block Development officer, V.P
Block Development office, Vembakkam
Execution of AGAMT II 2022-2023 Rejuvenation of Anjaneyar Kulam, Providing Paver Block in Erikarai Cross Street, Construction of Threashing floor near by Kosavan Kizhaku at ADC in Kundiyanthandalam atVembakkam Block
2022_RDTN_260691_1
No. A13-13/2156/2022 Date. 06.10.2022 VEM01
Open Tender
Civil Works - Others
Item Rate
90 days
Block Development office, Vembakkam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹33,500
17 Nov 2022
4 Nov 2022
10 Nov 2022
4 Nov 2022
10 Nov 2022
4 Nov 2022
Amount
Rejuvenation of Anjaneyar Kulam at Kundiyanthandalam Panchayat ( Desiliting, Bhathing Ghat, Inner Pond lining wall, Inlet/Outlet) AGAMT II 2022-23
Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
Provision for Bathing Ghat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
BABY POND LINING WALL
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Collection and supply of sand and filling in to the basement including cost and conveyance etc
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Provision for Inlet
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Providing Paver Block to Erikarai Cross Street in Kundiyanthandalam Panchayat
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C.1:3:6 using 20mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .GSB Grading III
Flooring with paver block 60 mm thickness laid over, interlocking blocks including cost and conveyance and all labour charges for 10 m2
Construction of Threshing Floor near by Kosavan Kizhaku at ADC in Kundiyanthandalam panchayat
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Collection & Supply of US Gravel with 1 Km lead including cost and conveyance to the site and all labour etc complete.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C.1:3:6 using 20mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C.1:2:4 using 20mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
JCK Constructions
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .