Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
27 Feb 2025, 5:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Engine Division, Bangalore
HINDUSTAN AERONAUTICS LIMITED Engine Division Bangalore
JOB WORK
19189
3-40081511-1
IMM
Bangalore Complex- Engine Divn
₹0
Exempted
27 Feb 2025
8 Feb 2025
8 Feb 2025
27 Feb 2025
31013571 - WASHER PLAIN - ROUTINGS (PSL.NO.112189)
Opn No Work Center No Work Center Description Note Text
5 P4422 PROGRESS DESPATCH RAW MATERIAL TO VENDOR SOURCE FOR MANUFACTURE
10 E4466 EXTERNAL / SUBCONTRACT WC REF. OPN DRG 3101357/PA
15 E4466 EXTERNAL / SUBCONTRACT WC DEBURR
20 Q76 INSPN - SUB CONTRACT INSPECT$INSPECTION$
25 676 NDT UNIT PREPARE FOR CRACK TEST
28 Q66 NDT - INSPECTION INSPECT FOR CRACKS
30 Q76 INSPN - SUB CONTRACT FINAL INSPECTION AND TAG REF. COMPT.DRG.$INSPECTION$
40 I4364 IND - PACKING & PRESERVATION PACK AND PRESERVE$PACKING UNIT$
50 I4364 IND - PACKING & PRESERVATION INSPECT PACKING$INSPECTION$
60 P4422 PROGRESS DELIVER TO STORES$PROGRESS$
31013572 - WASHER PLAIN - ROUTINGS (PSL.NO.112195)
Opn No Work Center No Work Center Description Note Text
2 Q72 INSPN - RAW MATERIAL INSPECT THE RAW MATERIAL SPEC AND CERTIFY
5 P4422 PROGRESS DESPATCH RAW MATERIAL TO VENDOR SOURCE FOR MANUFACTURE
10 E4466 EXTERNAL / SUBCONTRACT WC REF. OPN DRG 3101357/PA
15 E4466 EXTERNAL / SUBCONTRACT WC DEBURR
20 Q76 INSPN - SUB CONTRACT INSPECT$INSPECTION$
25 676 NDT UNIT PREPARE FOR CRACK TEST
28 Q66 NDT - INSPECTION INSPECT FOR CRACKS
30 Q76 INSPN - SUB CONTRACT FINAL INSPECTION AND TAG REF. COMPT.DRG.$INSPECTION$
40 P4364 PACKING PACK AND PRESERVE$PACKING UNIT$
50 Q71 INSPN - PACKING INSPECT PACKING$INSPECTION$
60 P4422 PROGRESS DELIVER TO STORES$PROGRESS$
31013574 - WASHER PLAIN - ROUTINGS (PSL.NO.112194)
Opn No Work Center No Work Center Description Note Text
10 E4466 EXTERNAL / SUBCONTRACT WC REF. OPN DRG 3101357/PA
15 E4466 EXTERNAL / SUBCONTRACT WC DEBURR
20 Q76 INSPN - SUB CONTRACT INSPECT$INSPECTION$
25 676 NDT UNIT PREPARE FOR CRACK TEST
28 Q66 NDT - INSPECTION INSPECT FOR CRACKS
30 Q76 INSPN - SUB CONTRACT FINAL INSPECTION AND TAG REF. COMPT.DRG.$INSPECTION$
40 P4364 PACKING PACK AND PRESERVE$PACKING UNIT$
50 Q71 INSPN - PACKING INSPECT PACKING$INSPECTION$
60 P4422 PROGRESS DELIVER TO STORES$PROGRESS$
31016176 - SHIM COMP.BRG.CARRIER - ROUTINGS (PSL.NO.100706)
Opn No Work Center No Work Center Description Note Text
10 E4466 EXTERNAL / SUBCONTRACT WC SHEAR.020" THICK SHT. (12" WIDE COIL) TO A LENGTH$OF 18" (TO MAKE 21 PARTS OF 3101617-6)$GUILLOTINE$
20 E4466 EXTERNAL / SUBCONTRACT WC REF.OPN.DRG. 31016176/P1
40 E4466 EXTERNAL / SUBCONTRACT WC DEBURR
50 Q76 INSPN - SUB CONTRACT INSPECTION
60 676 NDT UNIT PREPARE FOR CRACK TEST
70 Q66 NDT - INSPECTION INSPECT CRACKS
80 Q76 INSPN - SUB CONTRACT INSPECT FINAL AS PER GII 233 AND MARK$PART NO AS PER OPN DWG 3101617-6/P2
100 P4364 PACKING PACK TO PRESERVE AS PER HQI-T-008 CLASSS-2 $PACKING SECTION$
110 Q71 INSPN - PACKING INSPECT PACKING$INSPECTION$
120 P4422 PROGRESS SEND TO STORES$PROGRESS$
86523110 - SHIM - ROUTINGS (PSL.NO.31151)
Opn No Work Center No Work Center Description Note Text
5 Q72 INSPN - RAW MATERIAL INSPECT THE RAW MATERIAL AND CHECK SUPPLY CONDITION SHOULD BE HARDNESS 62 HB MAX.
8 P4422 PROGRESS DESPATCH RAW MATERIAL TO VENDOR
10 E4466 EXTERNAL / SUBCONTRACT WC SHEAR SHEET INTO STRIPS $GUILLOTINE$
20 E4466 EXTERNAL / SUBCONTRACT WC CLEAN SHEET WITH TRI CHLORO ETHYLENE, DRESS TO FLATTEN, LOAD AND ALIGN SHT
40 E4466 EXTERNAL / SUBCONTRACT WC REF OPN DRG 865231-10/ P1 (ISSUE:NIL)-LASER CUTTING
60 E4466 EXTERNAL / SUBCONTRACT WC DEBURR PROFILE ALONG LASER CUT PATH
70 Q76 INSPN - SUB CONTRACT INSP PART AS PER DRG
75 676 NDT UNIT PREPARE FOR CRACK TEST
78 Q66 NDT - INSPECTION CRACK TEST
80 Q76 INSPN - SUB CONTRACT INSPECT AND TAG PART NO AS PER MARK WITH INFORMATION SHOWN WITH IN THE QUOTES IN ACCORDANCE WITH AS 478-350R-37 "99193-865231--X" WHERE X IS THE APPLICABLE DESH NUMBER
90 P4364 PACKING PACK & PRESERVE PARTS AS PER HQI-T-008 CLASS-03 $PACKING SECTION$
100 Q71 INSPN - PACKING INSPECT PACKING $INSPECTION$
110 P4422 PROGRESS DELIVER TO STORES$
86523112 - SHIM - ROUTINGS (PSL.NO.103770)
Opn No Work Center No Work Center Description Note Text
5 Q72 INSPN - RAW MATERIAL INSPECT & ENSURE THAT SUPPLIED RAW MATL. AS PER DRG.ISS.
20 P4422 PROGRESS DESPATCH RAW MATERIAL TO VENDOR FOR MANUFACTURE
30 E4466 EXTERNAL / SUBCONTRACT WC REF OPN DRG 865231-12/P1
40 E4466 EXTERNAL / SUBCONTRACT WC DEBURR
50 Q76 INSPN - SUB CONTRACT INSPECT
54 676 NDT UNIT PREPARE FOR CRACK TEST
56 Q66 NDT - INSPECTION CRACK TEST
60 Q76 INSPN - SUB CONTRACT FINAL INSPECT AND MARK PART NO. AS PER COMPT. DRG
70 P4364 PACKING PACK AND PRESERVE
80 Q71 INSPN - PACKING INSPECT PACKING
90 P4422 PROGRESS CREDIT TO STORES
8652313 - SHIM - ROUTINGS (PSL.NO.102315)
Opn No Work Center No Work Center Description Note Text
5 Q72 INSPN - RAW MATERIAL INSPECT RAW MATL
8 P4422 PROGRESS DESPATCH RAW MATL
10 E4466 EXTERNAL / SUBCONTRACT WC SHEAR SHEET INTO
20 E4466 EXTERNAL / SUBCONTRACT WC FEED STRIP, PIERCE
30 E4466 EXTERNAL / SUBCONTRACT WC FLATTEN & DEBURR OD
40 Q76 INSPN - SUB CONTRACT INSPECT FINISHED
70 676 NDT UNIT PREPARE FOR CRACK
80 Q66 NDT - INSPECTION INSPECT FOR CRACKS
90 Q76 INSPN - SUB CONTRACT INSPECT AND TAG
100 P4364 PACKING PACK & PRESERVE AS PER HQI-T-008 CLASS-03 $PACKING SECTION$
110 Q71 INSPN - PACKING INSPECT PACKING $INSPECTION$
120 P4422 PROGRESS DELIVER TO STORES
8702251 - SHIM-FSV - ROUTINGS (PSL.NO.102858)
Opn No Work Center No Work Center Description Note Text
10 E4466 EXTERNAL / SUBCONTRACT WC SHEAR SHEET INTO BLANKS FO 10 INCH X 0.5INCH FOR 40 PARTS$-GUILLOTINE SHEAR$
20 E4466 EXTERNAL / SUBCONTRACT WC TRIM AND DRESS TO TEMPLATE. REF OPN DWG 870225/P1
25 Q76 INSPN - SUB CONTRACT INSPECT$
80 676 NDT UNIT PREPARE FOR CRCK TEST$CD UNIT$
85 Q66 NDT - INSPECTION INSPECT FOR CRACKS$CD INSPN$
90 Q76 INSPN - SUB CONTRACT INSPECT FINAL AND TAG P.NO$
100 P4364 PACKING PACKINNG AND PRESERVE$
105 P4422 PROGRESS TURN TO STORE$
8702253 - SHIM FSV- ROUTINGS (PSL.NO.107565)
Opn No Work Center No Work Center Description Note Text
10 E4466 EXTERNAL / SUBCONTRACT WC SHEAR SHEET INTO BLANKS OF 10 INCH X 6 INCH FOR 40 PARTS$CORNERS MAINTAINING ED 0.30 INCH (APPX) DEBURR$PROFILE AND HOLES$
20 E4466 EXTERNAL / SUBCONTRACT WC TRIM AND DRESS TO SUIT TEMPLATE, REF OPN DWG 870225/P1
30 Q76 INSPN - SUB CONTRACT INSPECT$INSPECTION$
40 676 NDT UNIT PREPARE FOR CRACK TEST$CD UNIT$
50 Q66 NDT - INSPECTION INSPECT FOR CRACKS$CD INSPN$
60 Q76 INSPN - SUB CONTRACT INSPECT FINAL AND TAG PART NO.$INSPECTION$
80 P4364 PACKING PACK TO PRESERVE AS PER HQI-T-008 CLASSS - 2 $PACKING SECTION$
90 Q71 INSPN - PACKING INSPECT PACKING$INSPECTION$
100 P4422 PROGRESS SEND TO STORES$PROGRESS$
8702255 - SHIM-FSV - ROUTINGS (PSL.NO.107566)
Opn No Work Center No Work Center Description Note Text
10 E4466 EXTERNAL / SUBCONTRACT WC SHEAR SHEET INTO BLANKS OF 10 INCH X 6 INCH FOR 40 PARTS$-GUILLOTINE SHEAR$
20 E4466 EXTERNAL / SUBCONTRACT WC LASER CUT PROFILE AS PER COMP DWG 870225/P1
30 E4466 EXTERNAL / SUBCONTRACT WC DEBURR
75 Q76 INSPN - SUB CONTRACT INSPECT$
80 676 NDT UNIT PREPARE FOR CRACK TEST$CD UNIT$
85 Q66 NDT - INSPECTION INSPECT FOR CRACKS$CD INSPN$
90 Q76 INSPN - SUB CONTRACT FINAL INSPECT AND TAG P.NO$
100 I4364 IND - PACKING & PRESERVATION PACK AND PRESERVE$
105 Q71 INSPN - PACKING INSPECT$
106 P4422 PROGRESS TURN TO STORE$
8964533 - SHIM COMP.BRG.CARRIER - ROUTINGS (PSL.NO.108077)
Opn No Work Center No Work Center Description Note Text
5 P4422 PROGRESS DESPATCH RAW-MATL. TO VENDOR AFTER CERTIFIED BY INSPECTION
10 E4466 EXTERNAL / SUBCONTRACT WC SHEAR SHT INTO BLANK$252MM X 252MM$GUILLOTINE$
20 E4466 EXTERNAL / SUBCONTRACT WC LOCATE BLANK IN POSITION AND BLANK$PROFILE TO DIMN
30 E4466 EXTERNAL / SUBCONTRACT WC LOCATING AT (2) PINS AND ONE LUG$PIERCE (12) HOLES 0.21/0.23 INCH DIA
40 E4466 EXTERNAL / SUBCONTRACT WC LOCATING ON (2) HOLES PIERCE I/DIA$5.41/8.43 INCHES
50 E4466 EXTERNAL / SUBCONTRACT WC FLATTEN
60 E4466 EXTERNAL / SUBCONTRACT WC DEBURR COMPLETE INCLUDING HOLES
70 Q76 INSPN - SUB CONTRACT INSPECT
80 676 NDT UNIT PREPARE FOR CRACK TEST
90 Q66 NDT - INSPECTION INSPECT FOR CRACKS
100 Q76 INSPN - SUB CONTRACT INSPECT FINAL & MARK PT NO AS PER$MC5014 CLASS II A$
110 I4364 IND - PACKING & PRESERVATION PACK & PRESERVE THE PART AS PER$HQI 015
120 Q71 INSPN - PACKING INSPECT
130 Q67 INSPN - PROCESS DELIVER PT TO STORE 48
S8154135C005-WASHER-SHIM--FSV. - ROUTINGS (PSL.NO.118500)
Opn No Work Center No Work Center Description Note Text
5 Q72 INSPN - RAW MATERIAL INSPECT RAW-MATERIAL & CHECK FOR SUPPLY CONDITION
8 P4422 PROGRESS DESPATCH RAW-MATERIAL TO VENDOR AFTER CERTIFIED BY INSPECTION
20 E4466 EXTERNAL / SUBCONTRACT WC REF. OPN DRG. NO. S8154135C005/P1
30 E4466 EXTERNAL / SUBCONTRACT WC DEBURR
40 E4466 EXTERNAL / SUBCONTRACT WC INSPECT
45 Q76 INSPN - SUB CONTRACT INSPECT FINISHED PARTS RECEIVED FROM VENDOR.
50 676 NDT UNIT PREPARE FOR CRACK TEST
60 Q67 INSPN - PROCESS INSPECT FOR CRACKS
70 Q76 INSPN - SUB CONTRACT FINAL INSPECT & MARK IDENTITY
80 P4364 PACKING PACK TO PRESERVE AS PER HQI - T-008 (CURRENT ISSUE)
90 Q71 INSPN - PACKING INSPECT PACKING
100 P4422 PROGRESS CREDIT TO SOTRES
S8154135C010-WASHER-SHIM--FSV. - ROUTINGS (PSL.NO.118501)
Opn No Work Center No Work Center Description Note Text
10 P4422 PROGRESS DESPATCH RAW-MATL. TO VENDOR
20 E4466 EXTERNAL / SUBCONTRACT WC MARK AND CUT SHEET TO SIZE 6"X6"
30 E4466 EXTERNAL / SUBCONTRACT WC INSPECT
40 E4466 EXTERNAL / SUBCONTRACT WC PRE-CLEAN THE SHEET AS REQUIRED
50 E4466 EXTERNAL / SUBCONTRACT WC PHOTO RESIST DIP COAT
60 E4466 EXTERNAL / SUBCONTRACT WC PHOTO PROCESS USING PHOTO TOOL
70 E4466 EXTERNAL / SUBCONTRACT WC CHEMICAL ETCH O/D 0.480"/0.470"
80 Q76 INSPN - SUB CONTRACT INSPECT
90 676 NDT UNIT PREPARE FOR CRACK TEST
100 Q66 NDT - INSPECTION INSPECT FOR CRACKS
110 Q76 INSPN - SUB CONTRACT INSPECT FINAL AND PART NO TAG
120 I4364 IND - PACKING & PRESERVATION PACK & PRESERVE PARTS AS PER HQI-T-008 (CURRENT ISSUE)
130 Q71 INSPN - PACKING INSPECT
140 P4422 PROGRESS DELIVER TO STORES
S8154243C005 - WASHER-SHIM - ROUTINGS (PSL.NO.118499)
Opn No Work Center No Work Center Description Note Text
10 E4466 EXTERNAL / SUBCONTRACT WC SHEAR SHEET TO SIZE 10INCH X 10INCH FOR 200 PARTS$GUILLOTINE$
20 E4466 EXTERNAL / SUBCONTRACT WC MARK AND DRILL DIA 0.25INCH 2 HANDLING HOLES$AT 2 CORNERS(ONE SIDE ONLY) MAINTAINING 0.30INCH$
25 E4466 EXTERNAL / SUBCONTRACT WC INSPECT$
30 E4466 EXTERNAL / SUBCONTRACT WC STRIP INK MARKS IF NECESSARY$PCM UNIT$
40 E4466 EXTERNAL / SUBCONTRACT WC DIP IN PHOTO RESIST COAT$PCM UNIT$
50 E4466 EXTERNAL / SUBCONTRACT WC PHOTO PROCESS USING PHOTO TOOL 10504305PCM UNIT$
60 E4466 EXTERNAL / SUBCONTRACT WC CHEMICAL CUT ID AND OD$PCM UNIT$
70 E4466 EXTERNAL / SUBCONTRACT WC STRIP PARTS$PCM UNIT$
75 Q76 INSPN - SUB CONTRACT INSPECT$
80 676 NDT UNIT PREPARE FOR CRACK TEST$
85 Q66 NDT - INSPECTION INSPECT FOR CRACKS$CD INSPN$
95 Q76 INSPN - SUB CONTRACT INSPECT FINAL AND TAG PART NO$
100 I4364 IND - PACKING & PRESERVATION PACK AND PRESERVE PER HQI-T-008 (CURRENT ISSUE)
105 Q71 INSPN - PACKING INSPECT$
106 P4422 PROGRESS TURN TO STORE$
S8157N127002-WASHER---FDV. - ROUTINGS (PSL.NO.106108)
Opn No Work Center No Work Center Description Note Text
5 P4422 PROGRESS DESPATCH RAW-MATL. TO VENDOR
10 Q72 INSPN - RAW MATERIAL INSPECT THE RAW MATERIAL SUPPLY CONDITION ANNELED OR 1/4 HARD OR FULL HARD
20 E4466 EXTERNAL / SUBCONTRACT WC SHEAR SHEET INTO STRIPS TO SUIT PIERCE AND BLANKING
30 E4466 EXTERNAL / SUBCONTRACT WC PIERCE AND BLANK, PER OPN DRG S8157N/P1,P2
40 E4466 EXTERNAL / SUBCONTRACT WC DEBURR AND FLATTEN
50 Q76 INSPN - SUB CONTRACT INSPECT THE FINISHED PARTS
80 676 NDT UNIT PREPARE FOR CRACK TEST$CD UNIT$
85 Q66 NDT - INSPECTION INSPECT FOR CRACKS$CD INSPN$
95 Q76 INSPN - SUB CONTRACT INSPECT FINAL AND TAG PART NO$
100 I4364 IND - PACKING & PRESERVATION PACK AND PRESERVE$
105 Q71 INSPN - PACKING INSPECT$
106 P4422 PROGRESS TURN TO STORE$
S8157N19005 - WASHER-ENG - ROUTINGS (PSL.NO.112206)
Opn No Work Center No Work Center Description Note Text
20 E4466 EXTERNAL / SUBCONTRACT WC SHEAR SHEET INTO STRIPS TO SUIT PIERCE AND BLANKING
30 E4466 EXTERNAL / SUBCONTRACT WC PIERCE AND BLANK, PER OPN DRG S8157N/P1,P2
40 E4466 EXTERNAL / SUBCONTRACT WC DEBURR AND FLATTEN
50 Q76 INSPN - SUB CONTRACT INSPECT
60 676 NDT UNIT PREPARE FOR CRACK TEST AS PER RPS 702
70 Q66 NDT - INSPECTION INSPECT FOR CRACKS
80 Q76 INSPN - SUB CONTRACT FINAL INSPECT AND MARK PART NO
90 P4364 PACKING PACK AND PRESERVE HQI 015
100 Q71 INSPN - PACKING INSPECT PACKING
110 P4422 PROGRESS SEND TO STORES
S8157N237005 - WASHER - ROUTINGS (PSL.NO.112203)
Opn No Work Center No Work Center Description Note Text
10 Q72 INSPN - RAW MATERIAL INSPECT THE RAW MATERIAL SUPPLY CONDITION ANNELED OR 1/4 HARD OR FULL HARD
20 E4466 EXTERNAL / SUBCONTRACT WC SHEAR SHEET INTO STRIPS TO SUIT PIERCE AND BLANKING
30 E4466 EXTERNAL / SUBCONTRACT WC PIERCE AND BLANK, PER OPN DRG S8157N/P1,P2
40 E4466 EXTERNAL / SUBCONTRACT WC DEBURR AND FLATTEN
50 E4466 EXTERNAL / SUBCONTRACT WC INSPECT
55 Q76 INSPN - SUB CONTRACT INSPECT PARTS RECEIVED
60 676 NDT UNIT PREPARE FOR CRACK TEST AS PER RPS 702
70 Q66 NDT - INSPECTION INSPECT FOR CRACKS
80 Q76 INSPN - SUB CONTRACT FINAL INSPECT AND MARK PART NO
90 P4364 PACKING PACK AND PRESERVE HQI 015
100 Q71 INSPN - PACKING INSPECT PACKING
110 P4422 PROGRESS SEND TO STORES
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
raw.json
RAW_JSON
3101357--A-BETTER.tif
TENDER_DOCUMENT • 0.15 MB
31013571-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
31013572-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
31013574-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
3101617-NIL.tif
TENDER_DOCUMENT • 0.24 MB
31016176-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
86523110-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
86523112-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
8652313-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
870225-NIL.tif
TENDER_DOCUMENT • 0.09 MB
8702251-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
8702253-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
8702255-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
896453-B-BETTER.tif
TENDER_DOCUMENT • 0.08 MB
8964533-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
DWG_865231_A_01.pdf
TENDER_DOCUMENT • 0.08 MB
DWG_S8154_NR.pdf
TENDER_DOCUMENT • 0.44 MB
S8154135C005-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
S8154135C010-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
S8154243C005-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
S8157N127002-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
S8157N19005-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
S8157N237005-ROUTINGS.xls
TENDER_DOCUMENT • 0.03 MB
S8157_YU.pdf
TENDER_DOCUMENT • 1.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .