Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹6.3 L+₹53,196.61 (9.15%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹6.7 L+₹88,396.26 (15.2%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Ram Gopal L3 | NIRANJAN SINGH CONTRACTOR L1 | MS PARMAR CONSTRUCTOION AND SUPPLIERS L2 |
|---|---|---|---|---|---|---|
| 0.00The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | ||||||
| 1.00 | E/W excation in foundation M.K.R. soil including all lead and lift as per proper completion of work. | 9.72 | cum | 113.52 ₹1,103.41 | 70 ₹680.4 Lowest | 107.55 ₹1,045.39 |
| 2.00 | R.C.R. Stone masonry 1:4 cm with all cost of labour cement, sand, stone T&P etc required for completion of work. | 40.23 | Cum | 4,582.15 ₹1,84,339.89 | 3,900 ₹1,56,897 Lowest | 4,340.99 ₹1,74,638.03 |
| 3.00 | Laying RC.C. 1:1:2 in slab with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 18.32 | Cum | 6,844 ₹1,25,382.08 | 5,850 ₹1,07,172 Lowest | 6,485.24 ₹1,18,809.6 |
| 4.00 | Steel Reinforcement for RCC work including cutting, bending, binding with GI wire and placing in position with cost of steel reinforcement. | 2.5 | MT | 65,551 ₹1,63,877.5 | 62,500 ₹1,56,250 | 62,101.8 ₹1,55,254.5 Lowest |
| 5.00 | Cement pointing 1:2 on stone masonry all cost of labour material T&P etc required for completion of work. | 29.28 | Sqm | 118.58 ₹3,472.02 | 105 ₹3,074.4 Lowest | 112.35 ₹3,289.61 |
| 6.00 | Centering & Shuttering for R.C.C. work with all cost of labour material T&P etc required for completion of work. | 65.98 | Sqm | 776.15 ₹51,210.38 | 650 ₹42,887 Lowest | 735.3 ₹48,515.09 |
| 7.00 | Laying and fixing joint filler bond 20 mm including cost of cealing compound cost of labour etc required for completion of work. | 11.6 | RM | 742.14 ₹8,608.82 | 690 ₹8,004 Lowest | 703.08 ₹8,155.73 |
| 8.00 | Providing and fixing drainage spout pipe of GI 100 mm dia including cost of labour T&P etc required for completion of work. | 2 | RM | 1,462.05 ₹2,924.1 | 1,250 ₹2,500 Lowest | 1,385.1 ₹2,770.2 |
| 9.00 | E/W in filling for including machanical compaction dressing and watering with all lead and lifts and T&P etc with proper completion of work. | 187.5 | Cum | 252.47 ₹47,338.13 | 180 ₹33,750 Lowest | 239.18 ₹44,846.25 |
Tender Value
₹7.0 L
EMD Value
₹14,100
Closing Date
4 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER ICD KARWI
OFFICE OF THE EE ICD KARWI
Balance work of Pahreta minor and construction of VRB at km 1.530
2026_UPIDC_1201379_4
04/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
90 days
Distt Hamirpur
AS PER NIT
2 documents required · 2 mandatory
₹854
₹14,100
19 Nov 2026
28 Oct 2026
4 Nov 2026
28 Oct 2026
4 Nov 2026
28 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | - | - | - | - |
| 1 | E/W excation in foundation M.K.R. soil including all lead and lift as per proper completion of work. | 9.72 | cum | 119.5 | ₹1,161.54 |
| 2 | R.C.R. Stone masonry 1:4 cm with all cost of labour cement, sand, stone T&P etc required for completion of work. | 40.23 | Cum | 4,823.32 | ₹1,94,042.16 |
| 3 | Laying RC.C. 1:1:2 in slab with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 18.32 | Cum | 7,205.82 | ₹1,32,010.62 |
| 4 | Steel Reinforcement for RCC work including cutting, bending, binding with GI wire and placing in position with cost of steel reinforcement. | 2.5 | MT | 69,002 | ₹1,72,505 |
| 5 | Cement pointing 1:2 on stone masonry all cost of labour material T&P etc required for completion of work. | 29.28 | Sqm | 124.83 | ₹3,655.02 |
| 6 | Centering & Shuttering for R.C.C. work with all cost of labour material T&P etc required for completion of work. | 65.98 | Sqm | 817 | ₹53,905.66 |
| 7 | Laying and fixing joint filler bond 20 mm including cost of cealing compound cost of labour etc required for completion of work. | 11.6 | RM | 781.2 | ₹9,061.92 |
| 8 | Providing and fixing drainage spout pipe of GI 100 mm dia including cost of labour T&P etc required for completion of work. | 2 | RM | 1,539 | ₹3,078 |
| 9 | E/W in filling for including machanical compaction dressing and watering with all lead and lifts and T&P etc with proper completion of work. | 187.5 | Cum | 265.76 | ₹49,830 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.27 MB
NIT04.pdf
Tender Documents • 4.25 MB
BOQ_2273384.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .