Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical AA |
| 2 | Accepted-Technical | Accepted-Technical AA |
| 3 | Accepted-Technical | Accepted-Technical AA |
| 4 | Accepted-Technical | Accepted-Technical AA |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-As per the NIT conditions, only the previously submitted CDR is admissible for reuse in retendered works but a fresh fee slip and affidavit are mandatory. Hence, the bid is rejected due to non-submission of the required documents. |
Tender Value
₹2.4 L
EMD Value
₹4,700
Closing Date
12 Oct 2026, 6:00 pmClosed
ER FAYAZ AHMED SEIKH
XEN REW RAMBAN
AS PER NIT
2026_RDPR_327192_5
NIT No. 48.2 Fresh of 48 and 48.1 3rd Call UH PRI,DDC MIX BLOCK
Open Tender
Civil Works
Percentage
30 days
RAMBAN
AS PER NIT
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹4,700
13 Oct 2026
6 Oct 2026
13 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.in 90 % All kinds of soil & 10 % HArd rock | 8.5 | cum | 592.9 | ₹5,039.65 |
| 2 | Providing and Laying cement concrete 1:4:8 mix | 1.6 | cum | 5,202.9 | ₹8,324.64 |
| 3 | Providing and laying cement concrete 1:3:6 mix in foundation and plinth using 20mm stone aggergate with 30% boulder | 12.7 | cum | 5,733.6 | ₹72,816.72 |
| 4 | In ordinary soil disposal lead upto 50mts and 1.5 m | 40 | cum | 154.15 | ₹6,166 |
| 5 | Dry R.R stone masonary with hard stones in fnd. And plinth using nallah stone without bond stone | 24.81 | cum | 2,793.8 | ₹69,314.18 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: foundations | 46.46 | sqm | 286.35 | ₹13,303.82 |
| 7 | Carriage of Cement | 2.93 | MT | 766.2 | ₹2,244.97 |
| 8 | Carriage of Sand | 6.57 | cum | 2,581.6 | ₹16,961.11 |
| 9 | Carriage of Aggregate | 12.44 | cum | 1,444.48 | ₹17,969.33 |
| 10 | Carriage of Stones | 25.6 | cum | 801.48 | ₹20,517.89 |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.50 MB
BOQ_1106948.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .