| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | ₹19.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.1 LRejected-Finance 6 2 SIVAN NORTH CAR STREET PALAYAMKOTTAI TIRUNELVELI 2 | ₹20.1 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | M/S VIJAY INFRATECH L2 | N Sivapuermal L1 |
|---|---|---|---|---|---|
| 1.001) Providing Paver Block at Dhalapathisamuthiram Raja Nagar Village in Dhalapathisamuthiram Panchayat | |||||
| 2.00 | EARTHWORK EXCAVATION for foundation in hard soil and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed.(Hard Soil ) For core wall | 43.32 | Cum | 199.82 ₹8,656.20 | 197.25 ₹8,544.87 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing ,laying, compacting and curing etc complete | 21.66 | Cum | 5,559.34 ₹1.2 L | 5,487.79 ₹1.2 L |
| 4.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. Up to Basement | 375.44 | Sqm | 368.65 ₹1.4 L | 363.91 ₹1.4 L |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing ,laying, compacting and curing etc complete | 43.18 | Cum | 6,317.9 ₹2.7 L | 6,236.58 ₹2.7 L |
| 6.00 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 401 | 127.79 | Cum | 1,988.7 ₹2.5 L | 1,963.1 ₹2.5 L |
| 7.00 | Providing and Laying Paver Block of 60mm thick approved design made out of 12mm and 6mm HBGS chips in M30 mix properly cured to attain the required strength, Laying and interlocking block and well compacted using 1-3 ton capacity compressor, the cost inclusive of all materials for manufacturing, interlocking block loading transportation to work site unloading and labour charges for fixing over Sand bed of 30mm thick & Joints filling using compressor of 1-3 ton capacity including hire and fuel charges for compressor and all other incidental charges etc complete. | 1,277.94 | Sqm | 710.28 ₹9.1 L | 701.14 ₹9.0 L |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 3,06,380.8 ₹3.1 L | 3,02,438.1 ₹3.0 L |
Tender Value
₹20.1 L
EMD Value
₹21,000
Closing Date
5 Feb 2026, 3:00 pmClosed
Project Director
DRDA, Tirunelveli
Providing Paver Block at Dhalapathisamuthiram Raja Nagar Village in Dhalapathisamuthiram panchayat in Nanguneri Block
2026_RDTN_648368_8
A10/3938216/2025
Open Tender
Civil Works
90 days
Tirunelveli District
As per pre-qualification
5 documents required · 5 mandatory
₹0
₹21,000
11 May 2026
29 Jan 2026
5 Feb 2026
29 Jan 2026
5 Feb 2026
30 Jan 2026
1) Providing Paver Block at Dhalapathisamuthiram Raja Nagar Village in Dhalapathisamuthiram Panchayat
EARTHWORK EXCAVATION for foundation in hard soil and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed.(Hard Soil ) For core wall
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing ,laying, compacting and curing etc complete
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. Up to Basement
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing ,laying, compacting and curing etc complete
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 401
Providing and Laying Paver Block of 60mm thick approved design made out of 12mm and 6mm HBGS chips in M30 mix properly cured to attain the required strength, Laying and interlocking block and well compacted using 1-3 ton capacity compressor, the cost inclusive of all materials for manufacturing, interlocking block loading transportation to work site unloading and labour charges for fixing over Sand bed of 30mm thick & Joints filling using compressor of 1-3 ton capacity including hire and fuel charges for compressor and all other incidental charges etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.72 MB
Technicalbid08.pdf
Tender Documents • 0.47 MB
Pricebid08.pdf
Additional Documents • 0.47 MB
BOQ_777455.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid