Loading…
Loading…
Tender Value
₹22 L
EMD Value
₹22,000
Closing Date
4 Aug 2026, 3:00 pm
The Commissioner,TCMC
Muthurangan Street
Dismantling the Existing Motor Room and providing Pile foundation at Old Age Home Silapathigaram Street ward no 45 in TCMC
2026_DMA_686862_3
006/2026/E1/Z5
Open Tender
Civil Works
Works
Zone 5
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹22,000
18 Jul 2026
18 Jul 2026
4 Aug 2026
18 Jul 2026
4 Aug 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 1,020.91 | Cum | - | - | 18% |
| 2 | Removing Solid Waste to transfer to Appur Compost Yard and engaged Tipper Truck and poclain for Hirer basis including and unloading for solid waste compost yard to appur Compost yard rate inlisive for Driver,Operator,fuel Charges,appur Entry fee remite amount for dump of garbage in appur village dumping yard including all inlisive charges etc,as per specification. | 1,020.91 | Cum | - | - | 18% |
| 3 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 1,020.91 | Cum | - | - | 18% |
| 4 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 285 | Kg | - | - | 18% |
| 5 | Installation of Vertical Bored cast in situ RCC piles of following diameter in all types of soils, using Standardised Concrete Mix of following grade, with sulphate resistant Cement or OPC/PPC, etc and Crushed Stone Sand and 20mm and down graded HBGS jelly coarse aggregate. The rate includes cost for placing of reinforcement cage in bore hole in correct position, cost of boring to the required depth with Bentonite solution with temprory casing of required length, conveyance of RMC to site and pouring concrete using Tremine pipes, conveyance of all materials to the site including all tools and plants, shifting the plants and equipments from one point to another, excavtion of mud pits for circulation of Bentonite soultion, closing the mud pits to original level and mud removal with initial lead and lift but including dismantling the concrete above the cut off level etc complete as directed by the departmental officers including socketing. The reinforcement cage should be welded properly for lifting. The concrete cubes to be tested as per IS 456-2000. Acceptance criteria by clause 16.1. Frequency of testing as per 15.2.2. Testing to be conducted at both the ends at site as well as RMC plant. Pile driving depth should be decided by the departmental officers at site. The length of pile for payment shall be measured from top of shoe to the bottom of the pile cap.( Cost of Reinforcement provided for Pile and Welding charges shall be measured and Paid separately ) | 40 | Mtr | - | - | 18% |
| 6 | Dismantling the Existing Motor Room including cost and conveyance of all materials and labour charges etc complete | 20 | Hrs | - | - | 18% |
| 7 | Supply and Delivery of Tipper Lorry for Removal of building Debris including cost and conveyance of all materials and labour charges etc complete | 3 | Each | - | - | 18% |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_825639.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].