Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.8 LAccepted-Finance | 1 | Accepted-Finance Accepted | |
| 2 | 2₹3.1 L+₹31,826 (11.3%)Accepted-Finance | 2 | Accepted-Finance Accepted | |
| 3 | 3₹3.4 L+₹58,556 (20.7%)Accepted-Finance | 3 | Accepted-Finance Accepted | |
| 4 | 4₹3.7 L+₹88,156 (31.2%)Accepted-Finance | 4 | Accepted-Finance Accepted |
Tender Value
₹4.2 L
EMD Value
₹8,438
Closing Date
3 Mar 2020, 3:00 pmClosed
Executive Engineer Amini
Executive Engineer LPWD Division Office Amini
Construction of Approach road from Main Road to Dr. APJAK GSSS at Chethlat
2020_UTL_1094_1
52/EE/LPWD/AMN /2019-20
Open Tender
Civil Works - Buildings
Item Rate
90 days
LPWD Division Office Amini
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Excutive Engineer Amini
₹8,438
9 Mar 2020
21 Feb 2020
4 Mar 2020
21 Feb 2020
3 Mar 2020
21 Feb 2020
Amount
Surface dressing of the ground including removing vegitation and inequalities not exceeding 15 cm deep and disposal of rubbish lead up to 50 metres and lift up to 1.5 metres (Full Cost)
Felling trees of girth (measured at a hight of 1 mtr above ground level ) including cutting of trunks and branches removing the roots and stacking of servicable materials and disposable opf unservicable materials Byond 60 cms and upto 120 cm in girth (Full Cost)
Earth work excavation in foundation trenches or drains not exceeding 1.5m in width or 10 sq.m on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. (Full Cost)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc layers not exceeding 20cm plinth, sides of foundations etc layers not exceeding 20cm and watering lead up to 50 mtr and lift up to 1.5 metres. (Full Cost)
Supplying and Filling Plinth with Red Mud under floors including watering ,ramming, consolidating and dressing complete (Labour Element)
Providing and laying cement concrete 1: 4:8 ( 1 cement: 4 M.Sand: 8 granite chips ) foundation and plinth.Stone aggregate 40mm nomonal size (Labour Element)
Brick work with modular bricks of class designation in foundation and plinth in C.M.1:6 (1Cement: 6 Metal sand) . (Labour Element)
Cement concrete 1:2:4 (1 cement : 2 metale sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including side shuttering, consolidation finishing and tamping complete (Labour Element)
12mm cement plaster 1:6 (1cement :6 metal sand) (Labour Element)
Finishing wall with Arcylic smooth exterior paint of required shade on new work (two or more coats applied @1.67ltr/10 sqm) over including priming coat of exterior primer applied @2.20 kg/10 sqm. (Nerolac paint premier or equivalent). Exterior (Full Cost)
SABIR ALI KURAISHY KEELASURAMBI
Mohammed Basheer Ahamed CH
Coral Group Pvt Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .