Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹41.6 LAdmitted-Finance | -16.25% | ₹41.6 L | L1 | Admitted-Finance |
| 2 | L2₹45.2 L+₹3.5 L (8.53%)Admitted-Finance | -9.11% | ₹45.2 L+₹3.5 L (8.53%) | L2 | Admitted-Finance |
| 3 | L3₹46.9 L+₹5.3 L (12.7%)Admitted-Finance 106 NEHRU NAGAR ROORKEE DISTRICT HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | -5.61% | ₹46.9 L+₹5.3 L (12.7%) | L3 | Admitted-Finance |
| 4 | L4₹47.2 L+₹5.6 L (13.4%)Admitted-Finance | -5.01% | ₹47.2 L+₹5.6 L (13.4%) | L4 | Admitted-Finance |
| 5 | L5₹48.0 L+₹6.3 L (15.2%)Admitted-Finance | -3.49% | ₹48.0 L+₹6.3 L (15.2%) | L5 | Admitted-Finance |
Tender Value
₹58.7 L
EMD Value
₹1.2 L
Closing Date
15 Jun 2026, 6:00 pmClosed
O/o Executive Engineer PWD Division Suratgarh
O/o Executive Engineer PWD Division Suratgarh
Rate contract tender for Road repair and other maintainance work under Section I Sub Division I Suratgarh Sec II
2026_CEPWD_565745_2
EE PWD SOG NIT No. 03 of 2026-27
Open Tender
Civil Works
Percentage
290 days
Suratgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EE PWD Division Suratgarh Through E-Grass Challan
₹1.2 L
Yes
18 Jun 2026
8 Jun 2026
16 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002.Mechanical Means | 400 | cum | 93 | ₹37,200 |
| - | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Mechanical Means.In area of non-thorny jungle | 10 | Hect | 10,374 | ₹1,03,740 |
| - | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 | 4,662.81 | Sqm | 125 | ₹5,82,851.25 |
| - | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 | 18,651.24 | Sqm | 193 | ₹35,99,689.32 |
| - | Removal of blown sand including taking out and disposal of excavated material with lead up to 50Mtr. and lift up to 1.5 Mtr disposed soil to be levelled and neatly dressed. | 12,500 | cum | 9 | ₹1,12,500 |
| - | Providing and fixing PVC Bump Speed Breakers size 350 mm x 250 mm x 50 mm fitted with key hooks complete with labour material and traffic diversion arrangements. | 100 | Rmt | 1,522 | ₹1,52,200 |
| - | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc | 2,500 | P. Kg. | 11.89 | ₹29,725 |
| - | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. | 2,500 | P. Kg. | 2.46 | ₹6,150 |
| - | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. | 1,500 | P. Bag | 7.9 | ₹11,850 |
| - | Barricading with sal ballies as per design including tying with vertical posts by coconut strings complete in all respect with two horizontal members and vertical supports upto 2.5m centre to centre and for 3 days period including removal and cleaning the site complete in all respect. Complete | 200 | P. Mtr. | 25 | ₹5,000 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
ALLDOC.pdf
Tender Documents • 19.59 MB
BOQ_1006687.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .