| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 CrAccepted-Finance | ₹16.3 Cr | L1 | Accepted-Finance First Lowest quoted rate accepted. |
| 2 | L2₹17.7 CrRejected-Finance | ₹17.7 Cr | L2 | Rejected-Finance Quoted rate high. Second lowest quoted rate. |
| 3 | L3₹20.5 CrRejected-Finance | ₹20.5 Cr | L3 | Rejected-Finance Quoted rate high. Third lowest quoted rate. |
| 4 | L4₹21.4 CrRejected-Finance | ₹21.4 Cr | L4 | Rejected-Finance Quoted rate high. Fourth lowest quoted rate. |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
27 Sept 2024, 5:00 pmClosed
The Superintending Engineer, West Circle, M.E.Dte
Patal Bazar, 3rd Floor, Tinkonia, Purba Bardhaman, Pin-713101
Surveying, Design, Execution and Commissioning for Water Supply Scheme for 14 nos.DTW EM works,OHR 350 KL capacity within Sainthia Municipality under AMRUT 2.0
2024_MAD_737212_1
07 of SE(WC)/MED / 2024-25
Open Tender
CIVIL WORKS
548 days
Sainthia Municipality
please refer tender documents
3 documents required · 3 mandatory
₹0
₹5 L
Yes
The Superintending Engineer, West Circle, M.E.Dte
22 Nov 2024
21 Aug 2024
30 Sept 2024
21 Aug 2024
27 Sept 2024
22 Aug 2024
2 Sept 2024
Amount
Surveying, Design, Execution and Commissioning for Water Supply Scheme of Sainthia Municipality including i) Construction of 14 No. Pump House / Switch Room ( 4.0 m x 3.6 m ) for 5 Zones 14 No. DTW works site, ii) Construction of 1 No. OHR 350 CUM capacity with minimum staging height 20 m as per approved drawing design and specification including required length of peripheral Boundary Wall and Approach Road ( C.C or B.T as applicable ) , Drain as per approve drawing design at OHR & T.Well sites , along with arrangement of chlorination with supply and delivery of Chlorine and other relevant water treatment works and iii) Sinking of 14 No. 300 x 200 size 120 m deep by Direct Rotary Rig method using UPVC Pipe with 300 mm size ERWMS / MS common Manifold of 6m length for 5 Zone as per approved drawing and design and specification ( 3 No. for Z-2 , 1 No. for Z-3 , 4 No. for Z-4 , 6 No. for Z-5 )with UPVC Strainer 200 mm dia. 30m length and Development (Min. 8 Hr. continuous of tube well by using suitable air compressor (Min. Capacity: 600CFM & operating Pressure 14 Bar) followed by Water Resistivity Test / Electro-Logging Test / Yield testing with BHT pump (Head :45 to 50mtr.,Discharge :1100 to 1000 LPM and 25 BHP engine) all complete including To & Fro Transportation cost and Cost of fuels, lubricants & Labour etc. along with arrangement of chlorination with supply and delivery of Chlorine and other relevant water treatment works, iv) installation of designed capacity , Submersible Pump Motor units for 14 No. DTW with 80 mm dia. ERWMS column pipe and required length from DTW to Common Manifold( ERWMS / MS ) for 5 Zone as per approved drawing and design and specification with design dia. and thickness for required length of ERWMS / M.S pipe for Rising Main at different zone wise location and Pump House, Switch Room with illumination works and with installation of 14 Nos. approved make & brand designed capacity pump motor (Submersible ) units as to be required , v) including existing 4 Nos. D.T.Well E&M works for Z-I incl. replacement and supply and installation of new Submersible pump with designed capacity & including existing 5 Nos. D.T.Well E&M works for Z-II & including existing 5 Nos. D.T.Well E&M works for Z-III incl. replacement and supply and installation of new Submersible pump with designed capacity for all zones existing Deep Tube Wells & CWRs E&M works, vi) including construction of Guard Room ( 6.0 m x 4.0 m x 3.5 m ht. R.C.C frame Structure base B/W 1:4 ) incl. all complete, vii) Construction of 2 Storied Staff Quarter 1200 Sq ft. of each Floor R.C.C frame Structure base B/W 1:4 incl. all complete and including all Civil & Elctro-Mechnical works complete including viii) Soil Testing works and ix) Land Development works as and where necessary x) Pipe Carrying Bridge for a) Rising Main Pipe over rive for 200mm DI K-9 Pipe in CWRM Line Location ( 23° 57.12.00'N, 87°39.57.34'E) Bharat Gas Go-down , Length -350 Mtr, Width-2 mtr. and for b) Distribution Pipes over Canal for 200 mm DI K-7 Pipe in Distribution network Zone-IV , Near Municipal Children Park ( 23° 56.228'N, 87° 41.428'E) , Length -15 Mtr, Width-1.5 mtr. & c) Distribution Pipes over Canal for 160 mm HDPE Pipe in Distribution network Zone-IV, Near Rohit Cyber Point ( 23° 56.308'N, 87° 42.112'E) , Length -15 Mtr, Width-1.5 mtr d) Distribution Pipes over Canal for 350 mm DI K-7 Pipe in Distribution network Zone-V, Near Energie Fitness Gym ( 23° 56.575'N , 87° 40.225'E) , Length -15 Mtr , Width-1.5 mtr. etc. all cost and complete within Sainthia Municipal area including 3 months trial run and necessary training of maintenance staff & thereafter (subsequently) 5 (five) years comprehensive operation and maintenance of the Scheme
Construction of OHR 350 CUM including Boundary Wall and Approach Road ( C.C or B.T as applicable ), Drain as per approved drawing (Civil work), design complete as per direction of the E.I.C and including all cost and complete. and including all cost and complete. including all labour charges etc complete
Sinking of 14 No. 300 x 200 size 120 m deep by Direct Rotary Rig method using UPVC Pipe with 300 mm size ERWMS / MS common Manifold of 6m length for 5 Zone as per approved drawing and design and specification ( 3 No. for Z-2 , 1 No. for Z-3 , 4 No. for Z-4 , 6 No. for Z-5 ) with UPVC Strainer 200 mm dia. 30m length and Development (Min. 8 Hr. continuous of tube well by using suitable air compressor (Min. Capacity: 600CFM & operating Pressure 14 Bar) followed by yield testing with BHT pump (Head :45 to 50mtr.,Discharge :1100 to 1000 LPM and 25 BHP engine) all complete including To & Fro Transportation cost and Cost of fuels, lubricants & Labour etc along with arrangement of chlorination with supply and delivery of Chlorine and other relevant water treatment works, installation of designed capacity , Submersible Pump Motor units for 14 No. DTW with 80 mm dia. ERWMS column pipe and required length from DTW to Common Manifold ( ERWMS / MS ) with design dia. and thickness for required length of ERWMS / M.S pipe for Rising Main at different zone wise location and Pump House, Switch Room with illumination works including Water Resistivity / Electro-logging Test and including Approach Road ( C.C or B.T as applicable ), as per approved drawing (Civil work), design complete as per direction of the E.I.C and including all cost and complete. and including all cost and complete including all labour charges etc complete.
Supply delivery, installation and testing commissioning of MCC Control panel for operating 3 No. DTWs at Z-2 Submersible pumping units and internal & external illumination works with caballing and earthing arrangement as per technical specification and direction of EIC. For receiving zone wise DTWs Raw Water and to feed OHR Zone – II. and including all cost and complete and including all labour charges etc complete
Supply delivery, installation and testing commissioning of MCC Control panel for operating 1 No. DTWs at Z-3 Submersible pumping units and internal & external illumination works with caballing and earthing arrangement as per technical specification and direction of EIC. For receiving zone wise DTWs Raw Water and to feed OHR Zone – III and including all cost and complete and including all labour charges etc complete.
Supply delivery, installation and testing commissioning of MCC Control panel for operating 4 No. DTWs at Z-4 Submersible pumping units and internal & external illumination works with caballing and earthing arrangement as per technical specification and direction of EIC. For receiving zone wise DTWs Raw Water and to feed OHR Zone – IV and including all cost and complete and including all labour charges etc complete.
Supply delivery, installation and testing commissioning of MCC Control panel for operating 6 No. DTWs at Z-5 Submersible pumping units and internal & external illumination works with caballing and earthing arrangement as per technical specification and direction of EIC. For receiving zone wise DTWs Raw Water and to feed OHR Zone – Vand including all cost and complete and including all labour charges etc complete.
Supply delivery, installation and testing commissioning of 14 No. Submersible Pump w.r.t each DTW design capacity Yield for operating the 14 nos. DTW with 80 mm dia. ERWMS column pipe and required length from DTW to Common Manifold and from Common Manifold (300 mm size ERWMS / MS common Manifold of 6m length) to OHR with design dia. and thickness and required length of M.S pipe for Rising Main and with caballing and earthing arrangement for individual connection with the Switch Room and as per technical specification and direction of EIC. For all Zone and including all cost and complete and including all labour charges etc complete.
Supply and Installation of Submersible Pumps Motors and Replacement of old Pumps Motors from Existing 5 Zones Deep Tube Wells & CWRs with complete E&M works as per approved DPR drawing , design and specification and direction of the E.I.C incl. all cost & complete
Supply and Installation of Vertical Turbine Pumps Motors and Replacement of old Pumps Motors from Existing CWR at Z- IV with complete E&M works incl. installation of Electro-Chlorination system and as per approved drawing , design and specification and direction of the E.I.C incl. all cost & complete.
Construction of 14 Nos. Pump House / Switch Room ( 4.00 m x 3.60 m ) for 5 Zones DTWs & Construction of Guard Room ( 6.0 m x 4.0 m x 3.5 m ht. R.C.C frame Structure base B/W 1:4 ) incl. S&P & Internal Electrification Works all complete & Construction of 2 Storied Staff Quarter 1200 Sq ft. of each Floor R.C.C frame Structure base B/W 1:4 incl. S&P, Internal Electrification works all complete and including all Civil & Elctro-Mechnical works complete as per approved drawing (Civil work), design complete as per direction of the E.I.C and including all cost and complete
Construction of MS Pipe Carrying Bridge over River For 200mm DI K-9 Pipe in CWRM Line Location ( 23° 57.12.00'N, 87°39.57.34'E) Bharat Gas Go-down , Length -350 Mtr, Width-2 mtr as per approved drawing, design complete as per direction of the E.I.C and including all cost and complete
Construction of MS Pipe Carrying Bridge over Canal For 200 mm DI K-7 Pipe in Distribution network Zone-IV , Near Municipal Children Park ( 23° 56.228'N, 87° 41.428'E) , Length -15 Mtr, Width-1.5 mtr
Construction of MS Pipe Carrying Bridge over Canal For 160 mm HDPE Pipe in Distribution network Zone-IV , Near Rohit Cyber Point ( 23° 56.308'N, 87° 42.112'E) , Length -15 Mtr , Width-1.5 mtr
Construction of MS Pipe Carrying Bridge over Canal For 350 mm DI K-7 Pipe in Distribution network Zone-V, Near Energie Fitness Gym ( 23° 56.575'N , 87° 40.225'E) , Length -15 Mtr , Width-1.5 mtr
Testing, Commissioning & 3 months Trial run of the whole installation as per I.E Rules with Govt. Electrical inspector’s fees as complete in all respect and as per Bid document & as per direction of EIC including all cost and complete
Comprehensive Operation and maintenance of Electro-Mechanical works of all Zones Pump Houses, CWRs & OHRs for 5 (five) years. The work includes supplying adequate number of operator personnel and skilled Labor with a provision for necessary training to the personnel appointed by the ULB including supplying of all sundry materials and replacement of all types of damaged component etc. as per Bid document and complete in all respect as per direction of EIC and including all cost and complete. N.B:- This item will be executed after three (3) months trial run.
M/S GHOSH AND CO. (BID ID -5624578)
M.C.GHOSH AND ASSOCIATES (BID ID -5627148)
Aa Treatment Engineers (BID ID -5620922)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid