Loading…
Loading…
Tender Value
₹47.6 L
EMD Value
₹47,601
Closing Date
10 Aug 2026, 5:00 pm
Office of the Block Development Officer, Padmapur
Office of the Block Development Officer, Padmapur
Construction of Kalyan Mandap at Dibirsing
2026_PZPPD_136852_1
IFB-RC(BDO)PAD 04/2025-26
Open Tender
Civil Works - Buildings
Percentage
120 days
Dibirsing
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹47,601
Yes
25 Jul 2026
25 Jul 2026
12 Aug 2026
25 Jul 2026
10 Aug 2026
25 Jul 2026
25 Jul 2026 - 31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work : AR0102aa (Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge | 129.9 | Cubic Meter | 282.89 | ₹36,746 |
| 2 | Earth Work : AR0115 (Filling foundation and plinth with sand well watered and rammed) : Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. | 75.95 | Cubic Meter | 541.44 | ₹41,122.15 |
| 3 | Concrete : AR0304 (Cement concrete (1:4:8) with 4 cm. hard granite(Crusher Broken) metal) : Cement concrete (1:4:8) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. | 62.79 | Cubic Meter | 5,393.47 | ₹3,38,647.55 |
| 4 | R.C.C. Work : AR0408Aa (Column base (including centring & shuttering)) : Column base (including centring & shuttering) | 21.56 | Cubic Meter | 7,071.18 | ₹1,52,451.07 |
| 5 | R.C.C. Work : AR0408Ac (Column & Beam (including centring & shuttering)) : Column & Beam (including centring & shuttering) | 22.16 | Cubic Meter | 16,452.79 | ₹3,64,556.41 |
| 6 | R.C.C. Work : AR0408Ab (Plinth beam (including centring & shuttering)) : Plinth beam (including centring & shuttering) | 13.66 | Cubic Meter | 7,945.24 | ₹1,08,556.86 |
| 7 | R.C.C. Work : AR0408Ad (Lintel (including centring & shuttering)) : Lintel (including centring & shuttering) | 2.49 | Cubic Meter | 14,781.92 | ₹36,750.21 |
| 8 | R.C.C. Work : AR0408Af (Sun shade & Chajja (including centring & shuttering)) : Sun shade & Chajja (including centring & shuttering) | 25.38 | Square Meter | 1,264.07 | ₹32,082.19 |
| 9 | R.C.C. Work : AR0408Ag (Roof (including centring & shuttering)) : Roof (including centring & shuttering) | 29.53 | Cubic Meter | 14,383.91 | ₹4,24,738.77 |
| 10 | R.C.C. Work : AR0408Ae (Staircase (including centring & shuttering)) : Staircase (including centring & shuttering) | 5.44 | Cubic Meter | 16,314.46 | ₹88,734.37 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
DIBIRSING.pdf
Tender Documents • 0.87 MB
BOQ_602979.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].