Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
Closing Date
25 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
BLOCK DEVELOPMENT OFFICE
BLOCK DEVELOPMENT OFFICE
Construction of Anganwadi Toilet in Parai Street at Banavaram in Banavaram Panchayatt
2026_RDTN_724973_1
A2/1803/2026
Open Tender
Civil Works
Item Rate
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Yes
11 Nov 2026
11 Nov 2026
25 Nov 2026
11 Nov 2026
25 Nov 2026
11 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Anganwadi Toilet in Parai Street at Banavaram in Banavaram Panchayatt | - | - | - | - |
| 2 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete 1st depth 0.00 to 0.30m | 1.14 | CUM | - | - |
| - | P.C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc.. Complete | 0.27 | CUM | - | - |
| - | Supplying and erecting centering shuttering including necessary supports for plane surfece etc.., | 2.13 | SQM | - | - |
| 5 | Brickwork with cm 1:5 using country bricks including cost and conveyance labour charges etc complete. | 1.47 | SQM | - | - |
| 6 | Supplying, fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete | 0.03 | MT | - | - |
| - | R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance etc., complete | 0.27 | CUM | - | - |
| 8 | Cost and Supply of RCC Rings including cost and conveyance of all material to site and all labour charges etc.., Complete | 3 | Each | - | - |
| 9 | Cost and Supply of Steel Door including cost and conveyance of all material to site and all labour charges etc.., Complete | 1 | Each | - | - |
| 10 | Plastering with cement mortar 1:3 .10mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 1.65 | SQM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_870329.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .