Loading…
Loading…
Tender ID
Tender Value
₹5.5 Cr
EMD Value
₹11.0 L
Closing Date
24 Feb 2026, 3:00 pmClosed
EE, NWR-1, PWD, Mukarba Chowk, Delhi-110033
EE, NWR-1, PWD, Mukarba Chowk, Delhi-110033
Maintenance to various roads under North West Road Division-1 (M311) and Sub Division NWR-12, Sub Division NWR-15 and BDFD Road, T.V. Tower Road, Muni Maya Ram Marg, Outer Ring Road and Power House Road under Sub Division NWR-14 during 2026-27.......
2026_PWD_286646_1
106/EE/NWR-1/PWD/2025-26
Open Tender
Civil Works - Roads
Percentage
570 days
EE, NWR-1, PWD, Mukarba Chowk, Delhi-110033
Maintenance to various roads under North West Road Division-1 (M311) and Sub Division NWR-12, Sub Division NWR-15 and BDFD Road, T.V. Tower Road, Muni Maya Ram Marg, Outer Ring Road and Power House Road under Sub Division NWR-14 during 2026-27.......
22 documents required · 22 mandatory
₹0
₹11.0 L
17 Feb 2026
10 Feb 2026
24 Feb 2026
10 Feb 2026
24 Feb 2026
10 Feb 2026
Initial Desilting of PWD's open / covered / pipe / RCC box / brick drains and culverts etc. by deploying labour / supersucker / pumps / jetting machines / any other suitable mechanical means including opening/closing/placing/refixing of Manhole cover/SFRC Cover/Drain Cover, taking out silt, sludge, building rubbish, earth mixed malba, plastic bags, all type of floating, solid and semi- solid malba/ rubbish and its final disposal to authorised MCD/any other dumping ground as approved by Engineer-in-Charge. The rates includes all above operations including opening/closing/placing/refixing of Manhole cover/SFRC Cover/Drain Cover, taking out silt / floating material / malba / waste materials etc. from the drains / culverts, keeping it adjacent to drains for its drying (if required/ allowed by Engineer-in-Charge), its disposal to any temporary dumping ground (if required/ allowed by Engineer-in-Charge) and its final disposal to MCD/any other dumping ground, as approved by Engineer-in-Charge, all inclusive. (The cost of disposal of silt / floating material / malba / waste materials etc. from drain side/temporary dumping ground (if required/ allowed by Engineer-in-Charge) will be paid separately under agreement item no 3. Drains upto 600mm in width and all depths/ drains upto 600 mm dia pipes. NWR-12, NW14 & NWR-15
Drains above 600mm upto 1200mm in width and all depths / drains upto 1200 mm dia pipes. NWR-12, NWR-14 & NWR-15
Drains above 1200mm upto 1800mm in width and all depths / drains upto 1800 mm dia pipes. NWR-12, NWR-14 & NWR-15
Drains above 1800mm upto 3000mm or more in width and all depths / drains upto 3000 mm or more dia pipes. NWR-12 & NWR-14
Regular (on daily basis) desiltig of PWD's open / covered / pipe / RCC box / brick drains and culverts etc. by deploying labour / supersucker / pumps / jetting machines / any other suitable mechanical means including taking out silt, sludge, building rubbish, earth mixed malba, plastic bags, all type of floating, solid and semi- solid malba/ rubbish and its final disposal to authorised MCD/any other dumping ground as approved by Engineer-in-Charge. The rates includes all above operations including taking out silt / floating material / malba / waste materials etc. from the drains / culverts, keeping it adjacent to drains for its drying (if required/ allowed by Engineer-in-Charge), its disposal to any temporary dumping ground to be arranged by agency. (if required/ allowed by Engineer-in-Charge) and its final disposal to MCD/any other dumping ground, as approved by Engineer-in-Charge, all inclusive. ( The cost of disposal of silt / floating material / malba / waste materials etc. from drain side/temporary dumping ground (if required/ allowed by Engineer-in-Charge) will be paid separately under agreement item.Note:- The payment under this agreement item is for regular desilting of any stretch of drain and will be made once only after its regular desilting for a period of four months and not on monthly basis though the rates indicated in agreement items are for per metre per month. Regular cleaning of bell mouth and numbering of bell mouth is also included in this item. Drains upto 600mm in width and all depths/ drains upto 600 mm dia pipes. NWR-12, NWr-14 & NWR-15 (For the period from June to September 2026)
NWR-12, NWR-14 & NWR-15 (For the period from October to January 2027)
NWR-12, NWR-14 & NWR-15 (For the period from Feburary to May 2027)
NWR-12, NWR-14 & NWR-15 (For the period from June to September 2027)
Drains above 600mm upto 1200mm in width and all depths / drains upto 1200 mm dia pipes. NWR- 12, NWR-14 & NWR-15(For the period from June to September 2026)
NWR-12, NWR-14 & NWR-15 (For the period from October to January 2027)
NWR-12, NWR-14 & NWR-15 (For the period from Feburary to May 2027)
NWR-12, NWR-14 & NWR-15 (For the period from June to September 2027)
Drains above 1200mm in width and all depths / drains above 1800 mm dia pipes.. NWR- 12, NWR-14 & NWR-15 (For the period from June to September 2026)
NWR-12, NWR-14 & NWR-15 (For the period from October to January 2027)
NWR-12, NWR-14 & NWR-15 (For the period from Feburary to May 2027)
NWR-12, NWR-14 & NWR-15 (For the period from June to September 2027)
Drains above 1800mm upto 3000mm or more in width and all depths / drains upto 3000 mm or more dia pipes. NWR- 12 & NWR-14(For the period from June to September 2026)
NWR-12 & NWR-14 (For the period from October to January 2027)
NWR- 12 & NWR-14(For the period from Feburary to May 2027)
NWR- 12 & NWR-14 (For the period from June to September 2027)
Disposal of silt, sludge, building rubbish, earth mixed malba, plastic bags, all type of floating, solid and semi- solid malba/ rubbish / similar unserviceable dimantled or waste materials by mechanical means/including loading, transporting and unloading the same at any authorized Municipal/ any other Dumping Ground including weighing at plant etc. complete as per direction of Engineer-in-charge. Weighing and unloading at the plant shall be as per procedures/ rules of the Dumping Ground Management. The rates are inclusive of all operations, labours, leads and lifts from site of work to the authorized Municipal/ any other Dumping Ground. (Processing fees at prescribed rate of dumping ground will be deposited by the agency and shall be reimbursed by the department on production of only original cash receipts). (Payments for disposal under this item will be made on production of original Municipal dumping ground receipts), the agency shall also submit pre & post photograph in soft/hard copy. NWR- 12, NWR-14 & NWR-15
Providing and placing in position 100 mm thick factory made machine batched & machine mixed Precast RCC Rectangular Covers on drains of footpath of various sizes, of M-25 grade cement concrete for RCC work, including cost of centering, shuttering, reinforcement of 8 mm dia TMT bars of Fe 500 grade @ maximum 100mm c/c on both ways , neat cement punning on finished surface, properly encased on all edges with 1.6 mm thick , 100 mm wide MS sheet duly painted over priming coat , reinforcement to be welded at edges with MS sheet and providing 2 Nos. 12 mm dia bar for hooks etc i/c cost of cartage, all leads & lift, handling at site etc. all complete as per direction of Engineer-in-Charge. NWR- 12, NWR-14 & NWR-15
Providing and fixing in position pre-cast R.C.C. manhole cover and frame of required shape and approved quality, EHD – 35, Circular shape 560 mm internal dia NWR- 12, NWR-14 & NWR-15
Providing and placing in position pre-cast R.C.C. manhole cover of required shape and approved quality, EHD – 35, Circular shape 560 mm internal dia NWR- 12, NWR-14 & NWR-15
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.69 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 5.04 MB
BOQ_379524.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .