Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Finance | -18.21% | ₹5.5 L | L1 | Admitted-Finance |
| 2 | L2₹5.7 L+₹20,952.75 (3.79%)Admitted-Finance | -15.11% | ₹5.7 L+₹20,952.75 (3.79%) | L2 | Admitted-Finance |
| 3 | L3₹6.0 L+₹44,000.76 (7.96%)Admitted-Finance | -11.70% | ₹6.0 L+₹44,000.76 (7.96%) | L3 | Admitted-Finance |
Tender Value
₹6.8 L
EMD Value
₹13,520
Closing Date
17 Aug 2026, 6:00 pmClosed
EE WDSC Kapasan
Executive Engineer WDSC Kapasan Panchayat Samiti Campus, Kapasan District Chittorgarh (Rajasthan)
2_ Rennovation of Anicut 3 ( Total Works 3 ) Gram Panchyat Dhamana,Turkiya, Uchnarkhurd Block Kapasan Yojna WDC-PMKSY 1.0 WDF Punaruthan Fund District Chittorgarh
2026_WDSC_582770_2
107 ENIT 01 2026-27 EXEN WDSC Kapasan
Open Tender
Miscellaneous Works
Percentage
Kapasan
Please Refer Tender Documents.
2 documents required · 2 mandatory
₹500
Revenue Head in Govt. of Rajasthan
₹13,520
Yes
8 Sept 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। मशीनरी कार्य सख्त मिट्टी (in Hard Soil)( Bsr item no. 196B) | 126.36 | cum | 66.16 | ₹8,359.98 |
| 1.02 | पुराने प्लास्तर (Lime or Cement) को तोड़ना, जोड़ों को कुरेदना तथा सतह को साफ करना। Item 115 b | 192.4 | sqm | 37.62 | ₹7,238.09 |
| 1.03 | Centering & Shuttering with plywood or steel sheets including strutting, propping , bracing both ways and removal of form work for foundation in basements rafts, footings, strap beams, bases of columns , etc. upto plinth level. ( PS- BSR2025Itam No. 93b) | 232.72 | sqm | 243.34 | ₹56,630.08 |
| 1.04 | Reinforced Cement Concrete work in beams, Suspended floors, Girders having slopes up to 150 ,Landings, Balconies, Shelves, Chajjas, Lintels, Bands, Plain window sills, With 1:1.5:3 (1 cement : 1.5 : coarse sand : 3 graded stone aggregate 20mm nominal size)Staircases and Spiral Staircases up to floor three level includind curing, compaction, Finishing with rendering in cement sand mortar 1:3(1 Cement : 3 Coarse Sand) and making good and joints excluding the cost of centering, Shuttering and reinforcement:( PS- BSR2025Item No. 13a) | 47.39 | cum | 5,804.15 | ₹2,75,058.67 |
| 1.05 | Providing & fabricating steel reinforcement for R.C.C. work including cutting , bending, placing in position and binding complete including cost of binding wire in foundations, Raft footing step Beams base of columns etc. all complete up o floor three level.( PS- BSR2025Itam No. 61) 10 mm sariya weight per mtr 0.617kg | 933.43 | kg | 85.88 | ₹80,162.97 |
| 1.06 | सीमेन्ट प्लस्टर दीवार पर 1:4 अनुपात में सीमेन्ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित 25 मि.मी. मोटाई (केवल जलरोधी संरचनाओ के उपयोग हेतु)( Bsr item no. 76 A) | 252.12 | sqm | 299.53 | ₹75,517.5 |
| 1.07 | सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । Bsr item no. 16) | 32.78 | cum | 4,907.84 | ₹1,60,879 |
| 1.08 | खुदी हुई मिट्टी/रेत को नीव में तथा कुर्सी में 50 मीटर तक दूरी (Lead) में डालना तथा समतल करना , पानी डालना तथा दूरमुट से कुटना। Bsr item no. 5) | 126.36 | cum | 71.61 | ₹9,048.64 |
| 1.09 | board /paint work detail | 3 | no. | 1,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.63 MB
02.pdf
Tender Documents • 16.53 MB
BOQ_1035348.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .