Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance | L1 | Accepted-Finance being L1 | |
| 2 | L2₹1.8 L+₹28,275 (18.1%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.9 L+₹33,675 (21.6%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
Closing Date
4 Dec 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE E/M Lucknow
36 LBS MARG
JOB WORKS
2020_MES_399316_1
3002/EM/JOB/81/E3
Limited
Job Works
Works
30 days
GE E/M lucknow
As per NIT
2 documents required · 2 mandatory
₹0
Exempted
10 Dec 2020
28 Nov 2020
5 Dec 2020
28 Nov 2020
4 Dec 2020
28 Nov 2020
90 days
Job Work to be carried out for repair/replacement of transformer winding of capacity 200 KVA at mechanical laundry of Command Hospital in the area of AGE E/M Hospital under GE E/M Lucknow
M&L for step down transformer 200 KVA after dismentling HT/LT side cable terminals, earthing connections, opening top cover, taking out transformer oil, transformer core carefully, cleaning the sludge and carbon particle from main tank and conservator tank, takign out burnt HT/LT bush rods transformer oil, making electrical/earthing connections, using suitable size of AI/Cu lugs after repair/replacement of burnt/unsv parts including transportation from site to repairer shop and back to site incl testing and recommissioning complete all as specified and directed by engr-in-Charge. Note :- The major parts required for the repair will be measured and paid separately under relevant items. the nuts, bolts, washers required for repairing are deemed to te including in the quoted rates.
HT 11 KV porcelaing with brass stud screwed with brass nuts, bolts and cork washer for transformer of capacity 200 KVA all as spd and directed by Engr-in-Charge.
Supply and filling new transformer oil dielectric strength not less than 40 KV for making up the level/for replacing the used unsv oil including dehydration before fillign complete all as specified and directed by Engr-In-Charge.
M&L for rewinding of transformer 200 KVA complete using appropritate size of copper wound wire (HT/LT coils), all as sprcified and directed by Engr-in-Charge
S K Stationers
M/S SHIV INFOSYSTEM
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .