Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-SINGLE BID IN CALL 1 |
Tender Value
₹1.3 L
EMD Value
₹3,825
Closing Date
18 Aug 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O TWO NO OF CULVERTS/ DRAIN NEAR ZAKIR MASJID AT LONEPORA BLOCK KPORA
2026_RDPR_320612_26
ENIT90of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹3,825
23 Aug 2026
12 Aug 2026
19 Aug 2026
12 Aug 2026
18 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | EARTH WORK IN EXCAVATION BY MECHNICAL MEANS IN TRENCHES FOR FOUNDATIONS DRAINS PIPES CABLES ETC NOT EXCEEDING 1.5M WIDTH AND FOR SHAFTS WELLS CESSPITS AND THE LIKE NOT EXCEEDING 10SQM ON PLAN I/C DRESSING COMPLETE JOB | 5.37 | cum | - | - |
| 0.0 | P/L OF CEMENT CONCRETE 1:2:4 MIX WITH 20MM NS excluding cost of shutterings, CARRIAGES | 4.58 | cum | - | - |
| 0.0 | P/L OF CEMENT CONCRETE 1:3:6 MIX WITH 20MM NSexcluding cost of shutterings, CARRIAGES | 3.89 | CUM | - | - |
| 0.0 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.87 | CUM | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for: for ABUTS | 25 | SQM | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for: for SLAB | 12.55 | SQM | - | - |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level TMT | 186.25 | KG | - | - |
| 0.0 | CARRIAGE OF ALL MATERIAL 20 KM BY MT STONE SOLINGT I/C CARRIAGE AND H | 10.13 | cum | - | - |
| 0.0 | Back filling behind abts using Nallah muck including de-watering dressing and ramming with all carriages loading un-loading and stacking etc complete | 1 | job | - | - |
| 0.0 | Add provision for PG/SB | 1 | JOB | - | - |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_1066935.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].