| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹87.5 LAccepted-AOC 243 5 SUNDER NAGAR PATIALA 147001 | PATIALA | PUNJAB | 147001 | ₹87.5 L | 1 | Accepted-AOC Being lowest |
| 2 | 2₹87.7 L+₹15,212.45 (0.17%)Rejected-AOC CHANDIGARH | ₹87.7 L+₹15,212.45 (0.17%) | 2 | Rejected-AOC Being Higher |
| 3 | 3₹87.8 L+₹24,160.95 (0.28%)Rejected-AOC LUDHIANA | LUDHIANA | PUNJAB | 141001 | ₹87.8 L+₹24,160.95 (0.28%) | 3 | Rejected-AOC Being highest |
Tender Value
₹89.5 L
EMD Value
₹1.8 L
Closing Date
2 Jun 2026, 11:00 amClosed
Divisional Soil conservation officer hoshiarpur
Room No. 440 to 444, 4th floor, admin complex hoshiarpur
Const of Stone Masonry Water Recharging ROC and Crate Wire structures at Vill Harwan Khurali Rampur Tabba Sekhowal Nainwan Maira and Mehandwani Gujjran under Sub Division Garhshankar and at Vill Sherpur and Tajewal under Sub Division Mahilpur
2026_DOA_168582_1
DSWC/HSP/2026-2027/03
Open Tender
Civil Works
Percentage
120 days
Different village of Sub division gsr and mahilpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹1.8 L
17 Jun 2026
18 May 2026
2 Jun 2026
19 May 2026
2 Jun 2026
19 May 2026
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
Tender No. DSWC/HSP/2026-2027/03
Construction of Stone Masonry Water Recharging, ROC and Crate Wire Structures at Vill.Harwan, Khurali, Rampur, Tabba, Sekhowal, Nainwan, Mehandwani Gujjran and Maira under sub division Garhshankar, Construction of Crate Wire Structures at Vill. Tajewal and Sherpur under sub division Mahilpur
RATES FOR CIVIL WORK( Approved by CCS PUNJAB Chandigarh)
Name & Address of Firm/ Bidder
Total Estimated Cost 8948500
Quoted by Contractor (as %age less of estimated Amount) Less (-%) Amount Quoted
1. Stone Masonry Water Recharging Structure
Village Harwan Tehsil Garhshankar & Distt. Hoshiarpur
Estimate Sanction No. 5821 dated 20/04/2026 Amount = 9,50,700/- o/o CCS Punjab, Chandigarh
1.1 Stone Masonry Water Recharging structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 91.93 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 11.2 Per Cum 3433.35
3 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 12.09 Per Cum 5058.9
4 Squared Rubbled Masonary 1:5 Below ground level and below plinth level CSR 12.17 42.77 Per Cum 5602.51
5 Squared Rubbled Masonary 1:5 upto plinth level CSR 12.17 32.53 Per Cum 5602.51
6 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 & 12.25 as per PWD specifications. 40.67 Per Cum 6089.23
7 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 83.85 Per Sqm 213.54
8 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 228.82 Per Cum 0.99_
9 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 32 Per Cum 1458.04
10 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 129.5 Per Sqm 197
11 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 129.5 Per Sqm 73.75
12 PVC pipe 2 inches for weap hole 6 mtr 170
13 Display Board (Complete in all respect) 1 no. 3000
TOTAL (A) SAY = 950700
2. Stone Masonry Water Recharging Structure
Village Khurali Tehsil Garhshankar & Distt. Hoshiarpur
Estimate Sanction No. 5832 dated 20/04/2026 Amount = 12,39,800/- o/o CCS Punjab, Chandigarh
2.1 Stone Masonry Water Recharging structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 87.39 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 13.56 Per Cum 3433.35
3 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 14.77 Per Cum 5058.9
4 Squared Rubbled Masonary 1:5 Below ground level and below plinth level CSR 12.17 60.9 Per Cum 5602.51
5 Squared Rubbled Masonary 1:5 upto plinth level CSR 12.17 42.11 Per Cum 5602.51
6 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 & 12.25 as per PWD specifications. 64.87 Per Cum 6089.23 394977.9
7 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 116.68 Per Sqm 213.54
8 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 8 Per Cum 38.98
9 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 8 Per Cum 1458.04
10 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 35 Per Sqm 197
11 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 35 Per Sqm 73.75
12 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 285.18 Per Cum 0.99_
13 PVC pipe 2 inches for weap hole 6 mtr 170
14 Display Board (Complete in all respect) 1 no. 3000
TOTAL (B) SAY = 1239800
3. Stone Masonry Water Recharging Structure
Village Rampur Tehsil Garhshankar & Distt. Hoshiarpur
Estimate Sanction No. 6280 dated 28/04/2026 Amount = 24,78,100/- o/o CCS Punjab, Chandigarh
3.1 Stone Masonry Water Recharging structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 164.19 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 24.42 Per Cum 3433.35
3 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 24.39 Per Cum 5058.9
4 Squared Rubbled Masonary 1:5 in foundation and upto plinth level CSR 12.17 199.61 Per Cum 5602.51
5 Square rubble boulder masonary 1:5 in superstructure CSR 12.17 & 12.25 as per PWD specifications. 139.46 Per Cum 6089.23
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 108.29 Per Sqm 213.54
7 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 545.99 Per Cum 435.56
8 PVC pipe 75 mm for weap holes in side wall 18 mtr 71.64
3.2 Crate Wire Structure
9 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10 Per Cum 38.98
10 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 46 Per Sqm 197
11 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 46 Per Sqm 73.75
12 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 10 Per Cum 1458.04
13 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 10 Per Cum 435.56
3.3 Display Board
14 Display Board (6'X4' in size complete in all respect) 1 no. 3000
TOTAL (C) SAY = 2478100
4. Stone Masonry Run-off Control and Crate Wire Structure
Village Tabba Tehsil Garhshankar & Distt. Hoshiarpur
Estimate Sanction No. 60 dated 06/04/2026 Amount = 6,39,400/- o/o COS, SAS Nagar
4.1 Stone Masonry ROC structure 1 to 6
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 41.9 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 7.15 Per Cum 3433.35
3 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 2.6 Per Cum 5058.9
4 Squared Rubbled Masonary 1:5 in foundation CSR 12.17 33.28 Per Cum 5602.51
5 Square rubble boulder masonary 1:5 in superstructure CSR 12.17 & 12.25 as per PWD specifications. 40.43 Per Cum 6089.23
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 60.73 Per Sqm 213.54
7 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 118.4 Per Cum 0.99_
4.2 Crate Wire Structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 21 Per Cum 38.98
2 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 123.24 Per Sqm 197
3 Spreading of wire crates as per PWD specifications CSR 23.37 123.24 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 45.9 Per Cum 1458.04
5 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 45.9 Per Cum 0.99_
TOTAL (D) SAY = 639400
5. Stone Masonry Water Recharging and Crate Wire Structure
Village Sekhowal Tehsil Garhshankar & Distt. Hoshiarpur
Estimate Sanction No. 151 dated 15/04/2026 Amount = 3,77,900/- o/o COS, SAS Nagar
5.1 Stone Masonry ROC structure 1 to 4 and Crate Wire Structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 37.6 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 3.94 Per Cum 3433.35
3 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 1.81 Per Cum 5058.9
4 Squared Rubbled Masonary 1:5 in foundation CSR 12.17 22.8 Per Cum 5602.51
5 Square rubble boulder masonary 1:5 in superstructure CSR 12.17 & 12.25 as per PWD specifications. 21.84 Per Cum 6089.23
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 34.53 Per Sqm 213.54
7 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 91.08 Per Cum 347.19
8 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 93.78 Per Sqm 197
9 Spreading of wire crates as per PWD specifications CSR 23.37 93.78 Per Sqm 73.75
10 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 19.68 Per Cum 1458.04
TOTAL (E) SAY = 377900
6. Stone Masonry Water Recharging and Crate Wire Structure
Village Nainwan Tehsil Garhshankar & Distt. Hoshiarpur
Estimate Sanction No. 191 dated 17/04/2026 Amount = 6,28,600/- o/o COS, SAS Nagar
6.1 Stone Masonry ROC structure 1 to 3 and Crate Wire Structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 0.99_ Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 4.25 Per Cum 3433.35
3 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 2.27 Per Cum 0.99_
4 Squared Rubbled Masonary 1:5 in foundation CSR 12.17 23.74 Per Cum 5602.51
5 Square rubble boulder masonary 1:5 in superstructure CSR 12.17 & 12.25 as per PWD specifications. 22.99 Per Cum 6089.23
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 40.34 Per Sqm 213.54
7 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 176.01 Per Cum 347.19
8 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 407.72 Per Sqm 197
9 Spreading of wire crates as per PWD specifications CSR 23.37 407.72 Per Sqm 73.75
10 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 100.5 Per Cum 1458.04
TOTAL (F) SAY = 628600
7. Stone Masonry ROC and Crate Wire Structure
Village Mehandwani Gujjran Tehsil Garhshankar & Distt. Hoshiarpur
Estimate Sanction No. 361 dated 24/04/2026 Amount = 3,78,400/- o/o COS, SAS Nagar
7.1 Stone Masonry ROC structure 1 to 4 and Crate Wire Structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 0.99_ Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 3.73 Per Cum 3433.35
3 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 1.66 Per Cum 0.99_
4 Squared Rubbled Masonary 1:5 in foundation CSR 12.17 22.77 Per Cum 5602.51
5 Square rubble boulder masonary 1:5 in superstructure CSR 12.17 & 12.25 as per PWD specifications. 22.89 Per Cum 6089.23
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 32.04 Per Sqm 213.54
7 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 90.67 Per Cum 382.53
8 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 75.7 Per Sqm 197
9 Spreading of wire crates as per PWD specifications CSR 23.37 75.7 Per Sqm 73.75
10 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 0.99_ Per Cum 1458.04
TOTAL (G) SAY = 378400
8. Stone Masonry ROC and Crate Wire Structure
Village Maira Tehsil Garhshankar & Distt. Hoshiarpur
Estimate Sanction No. 364 dated 24/04/2026 Amount = 5,60,500/- o/o COS, SAS Nagar
8.1 Stone Masonry ROC structure 1 to 4 and Crate Wire Structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 51.17 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 5.53 Per Cum 3433.35
3 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 2.5 Per Cum 0.99_
4 Squared Rubbled Masonary 1:5 in foundation CSR 12.17 31.68 Per Cum 5602.51
5 Square rubble boulder masonary 1:5 in superstructure CSR 12.17 & 12.25 as per PWD specifications. 38.07 Per Cum 6089.23
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 49.15 Per Sqm 213.54
7 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 0.00_ Per Cum 382.53
8 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 90.6 Per Sqm 197
9 Spreading of wire crates as per PWD specifications CSR 23.37 90.6 Per Sqm 73.75
10 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 22 Per Cum 1458.04
TOTAL (H) SAY = 560500
9. Crate Wire Structures
Village Tajewal Tehsil Garhshankar & Distt. Hoshiarpur
Estimate Sanction No. 6378 dated 04/05/2026 Amount = 9,29,400/- o/o CCS Punjab, Chandigarh
9.1 Crate Wire Structures
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 154 Per Cum 38.98
2 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 316.5 Per Cum 1458.04
3 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 1112.96 Per Sqm 197
4 Spreading of wire crates as per PWD specifications CSR 23.37 1112.96 Per Sqm 73.75
5 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 316.5 Per Cum 497.96
6 Display Board (6'X4' in size complete in all respect) 1 no. 3000
TOTAL (I) SAY = 929400
10. Crate Wire Structures
Village Sherpur Tehsil Garhshankar & Distt. Hoshiarpur
Estimate Sanction No. 6400 dated 04/05/2026 Amount = 7,65,700/- o/o CCS Punjab, Chandigarh
10.1 Crate Wire Structures
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 120 Per Cum 38.98
2 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 250 Per Cum 1458.04
3 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 993.75 Per Sqm 197
4 Spreading of wire crates as per PWD specifications CSR 23.37 993.75 Per Sqm 73.75
5 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 250 Per Cum 497.96
6 Display Board (6'X4' in size complete in all respect) 1 no. 3000
TOTAL (J) SAY = 765700
GRAND TOTAL (A+B+C+D+E+F+G+H+I+J) =
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
DNIT03.pdf
Tender Documents • 0.55 MB
finbid3.xls
Additional Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .