Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-Finance H NO 53 2 NEAR GOVT PRIMARY SCHOOL DULER MAPUSA BARDEZ GOA | ₹14.5 L | L1 | Accepted-Finance Lowest Quote |
| 2 | L2₹14.9 L+₹41,646.65 (2.87%)Rejected-Finance 2128 DESAI NAGAR SANKHALI GOA | NORTH GOA | GOA | 403001 | ₹14.9 L+₹41,646.65 (2.87%) | L2 | Rejected-Finance Better quote available |
Tender Value
₹13.8 L
EMD Value
₹27,672
Closing Date
17 Aug 2026, 3:00 pmClosed
Executive Engineer
DISTRICT RURAL DEVELOPMENT AGENCY NORTH SPACES building 7th Floor Patto Plaza
Construction of metallic shed in crematorium Karabhat Chodan in VP Chodan Madel
2026_DRD_30888_1
DRDA-N/GGSY/TN/12/26-27/187/L2
Open Tender
Civil Works - Buildings
Percentage
Chodan
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹27,672
18 Aug 2026
6 Aug 2026
18 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain(not exceeding 1.5m in width or 10sq.m. on plan)including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 1.01 | All kinds of soil | 12 | cu.m | 291 | ₹3,492 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 3 | cu.m | 2,211 | ₹6,633 |
| 3Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 3.01 | All works upto plinth level | 2 | cu.m | 6,810 | ₹13,620 |
| 4 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 8 | cu.m | 245 | ₹1,960 |
| 5Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) | |||||
| 5.01 | All works upto plinth level | 3 | cu.m | - | - |
| 6Centering & shuttering including Strutting, Propping & removal of forms for : | |||||
| 6.01 | Foundations, Footings, Bases for columns | 17 | sq.m | 407 | ₹6,919 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_31289.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .