Tender Value
₹11.0 L
EMD Value
₹22,000
Closing Date
26 Aug 2026, 6:00 pm2d left
ZAVED HUSSAIN
Municipal Commmittee Ferozpur Jhirkha
CONST OF C.C. ROAD and DRAIN FROM H/O JAGDISH BUDHI MASTER TO RAGHUNATH MANDIR WARD NO 08 and 10 MC Ferozpur Jhirka
2026_HRY_542152_1
2026B5342A5C FE73 45DB B990 E29AAB4A6443338ULB
Open Tender
Civil Works
Works
150 days
MC Ferozpur Jhirka
2 documents required · 2 mandatory
₹1,000
₹22,000
Yes
20 Aug 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
26 Aug 2026
20 Aug 2026
20 Aug 2026 - 26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 112.7 | cum | 1,863 | ₹2,09,960.1 |
| 2 | [11.5.2]12 mm cement plaster of mix : 2. 1:3 (1 cement: 3 fine sand) [Through Rate] | 94.45 | Sqm | 126 | ₹11,900.7 |
| 3 | [17.14.3]Granular Sub-Base with Close Graded Material - (Table:- 400-1) Plant mix method
Construction of granular sub-base by providing Material as per Grading III (Table 400-I of MORTandH 5th revision) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORTandH specifications 3. Grading III material [Through Rate] | 112.7 | cum | 1,197 | ₹1,34,901.9 |
| 4 | [17.5.1]Compacting Original Ground 1. Compacting original ground below road crust
Loosening of the ground up to a level of 500 mm below the road crust, watered, graded and compacted at OMC in layers to meet requirement of table 300-2 for embankment construction as per technical clause 305 of MORT&H specifications [Through Rate] | 141.71 | cum | 53 | ₹7,510.63 |
| 5 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | 1,115.86 | Sqm | 7 | ₹7,811.02 |
| 6 | [3.1.18]By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. [Rate] | 141.71 | cum | 202 | ₹28,625.42 |
| 7 | [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate] | 141.71 | cum | 460 | ₹65,186.6 |
| 8 | [6.22.2.1]Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 2.1. All works up to Plinth Level :
M-20 grade plain cement concrete. (cement content considered @ 300 kg/cum) [Through Rate] | 141.71 | cum | 4,158 | ₹5,89,230.18 |
| 9 | [6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate] | 47.23 | Sqm | 156 | ₹7,367.88 |
| 10 | [7.22.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] | 8.56 | cum | 4,488 | ₹38,417.28 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_621619.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].