Tender Value
₹6.1 L
EMD Value
₹12,120
Closing Date
5 Sept 2026, 6:00 pmClosed
Er. Sandeep Gupta
XEN
Construction of Synthetic badminton court in Govt. College of Education Canal Road Jammu
2026_PWDJK_322910_1
eNIT NO. 59 of 2026-2027 Dated 31-08-2026
Open Tender
Civil Works
Percentage
45 days
Jammu
BOQ
2 documents required · 2 mandatory
₹600
Executive Engineer PWD R and B Division
₹12,120
15 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
5 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalitiesnot exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil. | 325.28 | Sqm | 24.12 | ₹7,845.75 |
| 2 | Filling of river bed material including digging ,loading ,unloading and carriage complete including levelling ,consolidation | 173.46 | Cum | 350 | ₹60,711 |
| 3 | Supplying and filling in plinth with fine sand under floors including, watering, ramming, consolidating and dressing complete. | 5.66 | Cum | 1,204.5 | ₹6,817.47 |
| 4 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 11.68 | Cum | 5,202.9 | ₹60,769.87 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 17.65 | Cum | 7,788.4 | ₹1,37,465.26 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more | 842.14 | Kg | 123.2 | ₹1,03,751.65 |
| 7 | Providing & fixing of Pvc stirups in Joints | 205.79 | Rmt | 50 | ₹10,289.5 |
| 8 | Supply and fixing of adjustable height and portable 02 Nos. poles including net complete job. | 1 | NO | 10,000 | ₹10,000 |
| 9 | Providing and laying Synthetic court in eight layers, two layer of resurfacer, four layer of rubber cushing and two layer of synthetic coating to smoothen surface including marking All Complete items of approved material 7yr warranty | 116.17 | Sqm | 1,600 | ₹1,85,872 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for:Edges of slabs and breaks in floors and walls Under 20 cm wide | 45.73 | Mtr | 262.2 | ₹11,990.41 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_1085390.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .