Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 CrAccepted-AOC | ₹5.7 Cr Quoted ₹16.4 Cr | L1 | Accepted-AOC LOA Approved |
| 2 | L2₹17.4 Cr+₹98.3 L (6.00%)Rejected-Finance MADURAI | ₹17.4 Cr+₹98.3 L (6.00%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Sri Balaji Builders L2 | SVS CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Construction of High Level Bridge across Gedilam river along CTA road to Otteri at Cuddalore Block | |||||
| 2.00 | Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL. | 2,302.56 | Cu.m | 140 ₹3,22,358.4 | 132 ₹3,03,937.92 Lowest |
| 3.00 | Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION (OPEN FOUNDATION, RAFT FOUNDATION, CUT OFF WALL,FLEXIBLE & RIGID APRON)UNDER ABUTMENTS & PIERS BELOW SILL LEVEL. | 732.09 | Cu.m | 520 ₹3,80,686.8 | 491 ₹3,59,456.19 Lowest |
| 4.00 | Providing and driving in position permanent M.S liner including cost and conveyance to the site and fabrication charges and tools and plants and driving M.S 6 mm thick liner to be left peramnently with the pile shaft as per the requirement and as per the specifications and placing from the bottom with all leads and lifts using 6mm M.S sheet etc., complete for PILES BELOW ABUTMENTS & PIERS. | 79.95 | R.Mtr | 86,159 ₹68,88,412.05 | 81,274 ₹64,97,856.3 Lowest |
| 5.00 | Reinforced cement concrete cast-in-situ bored piles of 1200 mm diameter M-30 Grade, using 20mm, 12mm & below ISS size HBG metal with minimum cement content of 400kg per cu.m maximum water cement ratio of 0.4 and slump of 150 - 200mm by tremie concreting including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel including placing of reinforcement in position, concreting, including all labour charges for driving or boring, mobilisation of piling equipment and other accesssories required for driving the pile, cost of Bentonite solution and the temporary liners, chiselling and including forming of working platform over the river bed for accommodating piling eqipments, forming approaches to the working platform, mixing concrete, filling it in position, compacting, cutting of pile head to cut off level for the casting the pile caps, including diversion of water course if necessary and all other incidental charges tec., complete as per standard specifications etc., complete for PILES BELOW ABUTMENTS & PIERS. | 1,570.4 | Cu.m | 17,502 ₹2,74,85,140.8 | 16,510 ₹2,59,27,304 Lowest |
| 6.00 | Vibrated Cement Concrete of grade M 15 Nominal mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for below ABUTMENT, WNGS and PIERS. | 32.65 | Cu.m | 5,787 ₹1,88,945.55 | 5,460 ₹1,78,269 Lowest |
| 7.00 | Vibrated reinforced Cement Concrete of grade M 35 Design mix using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for PILE CAPS under ABUTMENT, WNGS and PIERS | 644.25 | Cu.m | 11,444 ₹73,72,797 | 10,795 ₹69,54,678.75 Lowest |
| 8.00 | Vibrated reinforced cement concrete M 35 grade using 20 & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications , for SUBSTRUCTURE OF ABUTMENTS and WINGS ABOVE SILL LEVEL | 217.32 | Cu.m | 12,073 ₹26,23,704.36 | 11,389 ₹24,75,057.48 Lowest |
| 9.00 | Vibrated reinforced Cement Concrete of grade M 35 grade using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Circular column pier above sill | 97.13 | Cu.m | 13,295 ₹12,91,343.35 | 12,542 ₹12,18,204.46 Lowest |
| 10.00 | Vibrated Reinforced Cement Concrete M 35 using 20 & 12 mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS. | 17.99 | Cu.m | 12,688 ₹2,28,257.12 | 11,969 ₹2,15,322.31 Lowest |
Tender Value
Refer Docs
EMD Value
₹16.8 L
Closing Date
19 Sept 2025, 3:00 pmClosed
Additional Collector, DRDA Office, Cuddalore
DRDA Office Meeting Hall, Cuddalore
Construction of High Level Bridge across Gedilam river along CTA road to Otteri at Cuddalore Block
2025_RDTN_592756_1
A10/1409/2025 SCPAR 2025-26-Bridge
Open Tender
Civil Works - Bridges
Item Wise
365 days
Cuddalore Block
Pre-Qualification Details as per the Technical Bid
8 documents required · 8 mandatory
₹0
₹16.8 L
Yes
DRDA Office Meeting Hall, Cuddalore
24 Oct 2025
14 Aug 2025
19 Sept 2025
14 Aug 2025
19 Sept 2025
14 Aug 2025
14 Aug 2025 - 20 Aug 2025
10 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_707913.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .