Executive Officer
NPP MAU
WARD NO 05 SAHADATPURA PURVI ME RAJESH KUMAR KE MAKAN SE SHIV KUMAR KE MAKAN TAK INTERLOCKING ROAD WA NALI NIRMAN KA KARYA
2026_DOLBU_1193477_1
80-11
Open Tender
Civil Works
Percentage
120 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,040
Executive Officer
₹63,600
10 Oct 2026
10 Oct 2026
7 Nov 2026
10 Oct 2026
7 Nov 2026
10 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clerance including labour and matrials
and including grass cutting /Dressing and
carrage of matrials by Head load | 1 | JOB | 3,000 | ₹3,000 |
| 2 | Dismenteling of Brick Work including
Stacking of materials as directed by the
Engineer-in-Charge with the distance of
60.00m. Work SI No. 692 | 0.6 | CUM | 435 | ₹261 |
| 3 | E/W in excavation in foundation with
hard mixed soil etc all complete.
S.I. No 251 | 31.46 | CUM | 115 | ₹3,617.9 |
| 4 | C.C. Work in 1:6:12 in cement, fine sand
and 40 mm Gauge Brick Ballast including
labour and matrials , T/P with all com.
Work SI No. 273 | 8.03 | CUM | 3,250 | ₹26,097.5 |
| 5 | M-150 B/W in 1:4 in cement and coar sand
mortar including labour and matrials , T/P
with all com. Work SI No.305
DEDUCTED OLD BRICKS AND BATS RS. 873.00 | 25.95 | CUM | 4,980 | ₹1,29,254.4 |
| 6 | 12 mm thick plaster work in 1:3 with cement
and fine sand etc all complete.
S.I.No 584 | 41.1 | SQM | 189 | ₹7,767.9 |
| 7 | R.C.C. Work in 1:1.5:3 in cement coarse
sand and 20mm gauge including labour
and matrials, T/P with all com. Work SI
No.285 | 0.32 | CUM | 9,430 | ₹3,017.6 |
| 8 | M.S Baar In Such as R.c.C work inlcuding etc all complete. | 0.25 | QNTL | 5,650 | ₹1,412.5 |
| 9 | E/W in filling including cutting cartage up to 8.00 km etc all complete. | 155.7 | CUM | 301 | ₹46,865.7 |
| 10 | Construction of Granular sub base (GSB) by
providing coarse graded material spreading
in uniform layers with motor grader on
prepared surface, mixing by mix in place
method with rotavator at OMC, and
compacting with vibratory roller to achieve
the desired density, complete as per Clause
401 .. | 15.6 | CUM | 3,492.6 | ₹54,484.56 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.34 MB
Tech80.pdf
Tender Documents • 7.63 MB
BOQ_2252579.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .