Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹6.9 L (3.31%)Admitted-Finance | ₹2.2 Cr+₹6.9 L (3.31%) | L2 | Admitted-Finance |
| 3 | L3₹2.2 Cr+₹7.9 L (3.75%)Admitted-Finance | ₹2.2 Cr+₹7.9 L (3.75%) | L3 | Admitted-Finance |
| 4 | L4₹2.3 Cr+₹20.9 L (9.97%)Admitted-Finance | ₹2.3 Cr+₹20.9 L (9.97%) | L4 | Admitted-Finance |
| 5 | L5₹2.5 Cr+₹41.6 L (19.9%)Admitted-Finance | ₹2.5 Cr+₹41.6 L (19.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Gaikhonlung Panmei L5 | Elias Howmai L2 | K. Lamchao Pou L1 | D. Pukeho Mao L3 | Yumnam Sunil Singh L4 | Exotic Contractors Pvt. Ltd. L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00SH: Construction of 50 Bedded Hostel | |||||||||
| 2.00Earthwork | |||||||||
| 3.00Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||||||
| 4.00 | All kinds of soil. | 396.12 | cum | 298.27 ₹1,18,150.71 | 240 ₹95,068.8 | 237.21 ₹93,963.63 | 240 ₹95,068.8 | 235.35 ₹93,226.84 Lowest | 306.86 ₹1,21,553.38 |
| 5.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 132.04 | cum | 166.86 ₹22,032.19 | 159 ₹20,994.36 | 170.21 ₹22,474.53 | 158 ₹20,862.32 | 155.36 ₹20,513.73 Lowest | 202.57 ₹26,747.34 |
| 6.00 | Supplying and filling in plinth with sandy soil under floors including, watering,ramming consolidating and dressing complete. | 283.83 | cum | 881.57 ₹2,50,216.01 | 703 ₹1,99,532.49 | 745.67 ₹2,11,643.52 | 705 ₹2,00,100.15 | 689.72 ₹1,95,763.23 Lowest | 899.34 ₹2,55,259.67 |
| 7.00Cement concrete works | |||||||||
| 8.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - | |||||||||
| 9.00All work upto plinth level: | |||||||||
| 10.00 | 1:4:8 ( 1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 94.78 | cum | 7,176.62 ₹6,80,200.04 | 6,806 ₹6,45,072.68 | 6,908.34 ₹6,54,772.47 | 6,644 ₹6,29,718.32 Lowest | 7,158.98 ₹6,78,528.12 | 8,172.35 ₹7,74,575.33 |
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
18 Aug 2025, 12:00 pmClosed
Executive Engineer, Division-IV
Education Engineering Wing, Education (S) Department. Near D.C. Office (Old), Babupara, Imphal-795001
Construction of 50(fifty) Bedded Girls Hostel under Dharti Aaba Janjatiya Gram Utkarsh Abhiyan (DA-JGUA), 2025-26 at Willong High School, Senapati, Manipur
2025_DoEs_2875_1
EEW/T-15/2025-26/e-tender/12
Open Tender
Civil Works
Works
540 days
As Per Tender Document
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Acc no 920020059111936
₹5.6 L
Imphal
7 Jan 2026
28 Jul 2025
18 Aug 2025
28 Jul 2025
18 Aug 2025
28 Jul 2025
28 Jul 2025
stage.html
html • 0.03 MB
techsummary_3142.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_3142.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .