Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.4 CrAdmitted-Finance B 1210 G D COLONY B 1210 1ST FLOOR G D COLONY MAYUR VIHAR PHASE 3 MAYUR VIHAR PHASE 3 EAST DELHI DELHI 110096 | EAST DELHI | DELHI | 110096 | ₹30.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹31.9 Cr+₹1.5 Cr (5.06%)Admitted-Finance | ₹31.9 Cr+₹1.5 Cr (5.06%) | L2 | Admitted-Finance |
| 3 | L3₹32.5 Cr+₹2.1 Cr (6.93%)Admitted-Finance | ₹32.5 Cr+₹2.1 Cr (6.93%) | L3 | Admitted-Finance |
| 4 | L4₹33.6 Cr+₹3.2 Cr (10.6%)Admitted-Finance | ₹33.6 Cr+₹3.2 Cr (10.6%) | L4 | Admitted-Finance |
| 5 | L5₹34.2 Cr+₹3.8 Cr (12.5%)Admitted-Finance | ₹34.2 Cr+₹3.8 Cr (12.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ENERINFRA PRIVATE LIMITED L10 | Vichitra Constructions Pvt Ltd L5 | SJ CONSTRUCTION L11 | AG ENERGY PRIVATE LIMITED L1 | A A Patel L3 | KRITA ENGINEERING PVT LTD L9 | MCBW INFRA PRIVATE LIMITED L2 | RUDRA GAS ENTERPRISE PVT LTD L7 | Adorn Infra Energy Pvt. Ltd. L4 | PETRO INFRASOL PRIVATE LIMITED L8 | DS PIPELINE PROJECTS PRIVATE LIMITED L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00LAYING OF UNDERGROUND STEEL PIPELINE | ||||||||||||||
| 2.00LAYING OF UNDERGROUND STEEL PIPELINE BY OPEN CUT METHOD | ||||||||||||||
| 3.00Transportation of Line pipes including loading , unloading and stacking of 3-Layer PE coated line pipes issued by GGL as free issue materials from GGL designated store yard within Bengaluru GA limits but upto maximum 100 km from GGL stores/ yard to Contractor's stock yard/workshop/work-site. | ||||||||||||||
| 4.00Stringing of line pipes along pipeline trench /sand / soft soil bags including supply of bags and its filling materials. | ||||||||||||||
| 5.00Aligning, cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X - ray (Gamma Ray where X-ray is not possible at the discretion of GGL/MECON) and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of weld joints found defective by Engineer-in-Charge, carrying out re-radiography and other tests as required on repaired joints. | ||||||||||||||
| 6.00Surveying of route and detours required at the time of execution including marking the same in pipeline alignment sheets, preparation of construction drawings showing survey details, and submit same to Owner for review / approval. | ||||||||||||||
| 7.00Clearing, fulfilling all the requirements of various statutory/ environment authorities to the entire satisfaction, grading of work area. Relocating of any obstruction within the Pipeline route alignment / Approved route viz. electrical lines/ poles, telephone line / poles, foreign pipeline, etc. in co-ordination with concerned authorities and obtain permissions from these authorities for pipeline execution. | ||||||||||||||
| 8.00Cutting of Asphalt/concrete/white topping at Road top For trenching: Top layer of asphalt/Concrete shall be cut open by employing mechanized saw/cutters for maintaining straight line for the open cut excavated trench all along the pipline route. Same shall be paid in seperate other SOR item. | ||||||||||||||
| 9.00Trenching to required depth for maintaining a cover of miniumum 1.0 mtr to maximun 1.5 mtr as per instructions of Engineer-in charge from the top of the pipe by excavation in all types of soils including all type of rock etc. upto the depth 600 mm out of total depth of trench (Item of trenching in hard rock for rock depth 600 mm and more is covered separately under respective SOR Item). The item also includes trenching of required depth in different type of pavement / footpath / RCC , PCC & asphalt roads, RCC white topped roads etc. as required by using mechanical excavator or manually depending on the site condition and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. Dewatering of trenches as required as per site condition is also included in the scope of item. | ||||||||||||||
| 10.00Carrying out Joint coating after surface preparation by Grit blasting, application of primer etc.. as per the specifiactions. The scope also includes supply of coating sleeves, primer, grit, machines, manpower , compressor etc.. Carrying out repairs of coating defects of all pipes including defects/ damages occurring during transportation / handling. | ||||||||||||||
Tender Value
Refer Docs
EMD Value
₹35.8 L
Closing Date
4 Jun 2026, 2:00 pmClosed
T. Shivadhandayuthabani
BENGALURU
LAYING OF UNDERGROUND STEEL PIPELINES AND ASSOCIATED WORKS FOR GAIL GAS BENGALURU CGD PROJECTS ON ARC BASIS FOR A PERIOD OF TWO YEARS
2026_GAILG_276372_1
GAILGAS/BLR/CnP/26-27/04
Open Tender
Miscellaneous Works
Fixed-rate
BENGALURU
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹35.8 L
Yes
ONLINE THROUGH MS TEAMS
5 Aug 2026
6 May 2026
5 Jun 2026
6 May 2026
4 Jun 2026
18 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | LAYING OF UNDERGROUND STEEL PIPELINE | - | - | - | - |
| 2 | LAYING OF UNDERGROUND STEEL PIPELINE BY OPEN CUT METHOD | - | - | - | - |
| 3 | Transportation of Line pipes including loading , unloading and stacking of 3-Layer PE coated line pipes issued by GGL as free issue materials from GGL designated store yard within Bengaluru GA limits but upto maximum 100 km from GGL stores/ yard to Contractor's stock yard/workshop/work-site. | - | - | - | - |
| 4 | Stringing of line pipes along pipeline trench /sand / soft soil bags including supply of bags and its filling materials. | - | - | - | - |
| 5 | Aligning, cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X - ray (Gamma Ray where X-ray is not possible at the discretion of GGL/MECON) and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of weld joints found defective by Engineer-in-Charge, carrying out re-radiography and other tests as required on repaired joints. | - | - | - | - |
| 6 | Surveying of route and detours required at the time of execution including marking the same in pipeline alignment sheets, preparation of construction drawings showing survey details, and submit same to Owner for review / approval. | - | - | - | - |
| 7 | Clearing, fulfilling all the requirements of various statutory/ environment authorities to the entire satisfaction, grading of work area. Relocating of any obstruction within the Pipeline route alignment / Approved route viz. electrical lines/ poles, telephone line / poles, foreign pipeline, etc. in co-ordination with concerned authorities and obtain permissions from these authorities for pipeline execution. | - | - | - | - |
| 8 | Cutting of Asphalt/concrete/white topping at Road top For trenching: Top layer of asphalt/Concrete shall be cut open by employing mechanized saw/cutters for maintaining straight line for the open cut excavated trench all along the pipline route. Same shall be paid in seperate other SOR item. | - | - | - | - |
| 9 | Trenching to required depth for maintaining a cover of miniumum 1.0 mtr to maximun 1.5 mtr as per instructions of Engineer-in charge from the top of the pipe by excavation in all types of soils including all type of rock etc. upto the depth 600 mm out of total depth of trench (Item of trenching in hard rock for rock depth 600 mm and more is covered separately under respective SOR Item). The item also includes trenching of required depth in different type of pavement / footpath / RCC , PCC & asphalt roads, RCC white topped roads etc. as required by using mechanical excavator or manually depending on the site condition and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. Dewatering of trenches as required as per site condition is also included in the scope of item. | - | - | - | - |
| 10 | Carrying out Joint coating after surface preparation by Grit blasting, application of primer etc.. as per the specifiactions. The scope also includes supply of coating sleeves, primer, grit, machines, manpower , compressor etc.. Carrying out repairs of coating defects of all pipes including defects/ damages occurring during transportation / handling. | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.25 MB
VOL1.pdf
Tender Documents • 1.64 MB
VOLIIA.pdf
Tender Documents • 9.18 MB
VOLIIB.pdf
Tender Documents • 22.86 MB
VolIII.pdf
Tender Documents • 13.24 MB
BOQ_323154.xls
BOQ • 0.61 MB
Request_letter.pdf
PDF • 0.11 MB
IP.pdf
PDF • 1.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .