Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
4 Aug 2026, 3:00 pm
The Chief Engineer (Dist.-North) Siliguri WBSEDCL
OFFICE OF CE DIST NORTH 2ND FLOOR ADMIN BLDG 2ND MILE SEVOKE ROAD SILIGURI
Civil and electrical works for Construction of proposed Spread out type 33 11Kv Substation at Bagdogra including installation of earth mat under Siliguri Sub Urban Division
2026_WBSED_1030718_1
CEDN/E Tender/2026-2027/01
Open Tender
CIVIL AND ELECTRICAL WORKS
Percentage
365 days
BAGDOGRA SILIGURI
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹7.4 L
2nd Floor Admin Building P H Complex
9 Jul 2026
9 Jul 2026
6 Aug 2026
9 Jul 2026
4 Aug 2026
15 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | CIVIL | - | - | - | - |
| 1.001 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | - | cum | 120.46 | - |
| 1.002 | (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring | - | cum | 194.3 | - |
| 1.003 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m
a) In ground floor including roof. | - | cum | 451.47 | - |
| 1.004 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m. In ground floor including roof
a) Upto 150 mm thick. | - | cum | 948.39 | - |
| 1.005 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.
(a) In ground floor including roof. | - | cum | 1,975.56 | - |
| 1.006 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the
Enginner in charge).
(a) Depth upto 1.5 m. | - | sqm | 379.76 | - |
| 1.007 | (b) For additional depth beyond 1.5 m. and upto 3.00
m | - | sqm | 433.29 | - |
| 1.008 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)(a) With earth obtained from excavation of foundation | - | cum | 78.32 | - |
| 1.009 | (c) (iii) With carried earth arranged by the contractor within a radius exceeding 3 km. but not exceeding 5 km. including the cost of carried earth. | - | cum | 403 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_2530953.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].