Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Rejected-Technical | Rejected-Technical Non Responsive |
| 2 | Rejected-Technical | Rejected-Technical Non Responsive |
Tender Value
₹3.9 Cr
EMD Value
₹7.9 L
Closing Date
31 Jul 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ACE PWD Zone I jodhpur
ACE PWD Zone I jodhpur
Construction of Bridge on Bhuti-Rodla Road/plan/RR/2023-24
2025_CEPWD_477910_1
NIT No 08 of 2025-26 ACE PWD I Jodhpur
Open Tender
Civil Works
Percentage
180 days
Jalore
Please refer Tender documents
7 documents required · 7 mandatory
₹2,000
Executive Engineer PWD Dn Jalore
₹7.9 L
Yes
13 Aug 2025
10 Jun 2025
31 Jul 2025
10 Jun 2025
31 Jul 2025
10 Jun 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Constt. Of Minor Bridge works on Bhooti -Rodla Road
FOUNDATION
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MORTH specification clause 201 By mechanical Means .A. In area of light jungle | - | Hectare | - | - |
| 2 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 metres, stacking serviceable and unserviceable materials separately as per MORTH specification clause 202. | - | Cum | - | - |
| 3 | Earth work in excavation, including stacking/disposal of surplus material with all lifts and lead upto 495 metres, exclusive of compensation of earth [MoRTH specification : Clause 301 to 305] In ordinary SoilMechanically by power shovel, including mechanical loading and carriage by tipper/dumper (6T capacity) | - | Cum | - | - |
| 4 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth | 0.4 | Cum | - | - |
| 5 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary rock (not requiring blasting) Upto 3 m depth | 1 | Cum | - | - |
| 6 | In Soil unsuitable for road construction such as marshy soil including pumping out water, removal of the same and disposal within a lead upto 50m.and lift upto 0.5m. | 1 | Cum | - | - |
| 7 | Cement Concrete for plain/reinforced concrete in open foundation, any level, complete as per drawing and technical specifications. [MoRTH Specification Section 1700&1500] P.C.C.M15 grade | - | Cum | - | - |
| 8 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806,807, 1202 and 1204 R.C.C. grade M 25 (Including form work) | 0.6 | Cum | - | - |
| 9 | SUB STRUCTURE
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications MoRTH Section 1400,2200.Coursed rubble masonry (first sort) | - | Cum | - | - |
| 10 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806,807, 1202 and 1204 R.C.C. grade M 25 (Including form work) Height upto 5.00m. | 1 | Cum | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 0.29 MB
Tenderdocument.pdf
Tender Documents • 8.16 MB
Tenderdocument_2.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .