Loading…
Loading…
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
5 Aug 2026, 6:00 pm
XEW REW UDHAMPUR
XEW REW UDHAMPUR
BOQ
2026_RDPR_316549_29
e-NIT No. 56 REW UDHAMPUR of 2026-27 Dated 18-07-2026
Open Tender
Civil Works
Percentage
30 days
Udhampur
NIT
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹3,880
18 Jul 2026
18 Jul 2026
6 Aug 2026
18 Jul 2026
5 Aug 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add Cost of Sign Board | 1 | No. | 3,000 | ₹3,000 |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m
in width as well as10 sqm on plan including disposal of excavated earth, lead upto 50meter and lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | 99.02 | cum | 91.75 | ₹9,085.09 |
| 3 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 15.52 | cum | 479.3 | ₹7,438.74 |
| 4 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 3.9 | cum | 4,826.5 | ₹18,823.35 |
| 5 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. 80 % concrete | 12.5 | cum | 5,733.6 | ₹71,670 |
| 6 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Foundation, footing | 93.65 | Sqm | 286.35 | ₹26,816.68 |
| 7 | P/Laying stone solling | 12.11 | Cum | 1,235.55 | ₹14,962.51 |
| 8 | Carriage of Sand | 7.7 | cum | 2,250.4 | ₹17,328.08 |
| 9 | Carriage of Stone Aggregates | 11.74 | cum | 1,698.4 | ₹19,939.22 |
| 10 | Carriage of Stone | 13.93 | cum | 390.28 | ₹5,436.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_1032853.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].