Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹19.9 L
EMD Value
₹20,000
Closing Date
3 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE, CHWD, Mahendragada, Gajapati.
O/o SE, CHWD, Mahendragada, Gajapati.
Construction of Kalyan Mandap at Balipata R and R Colony under Chheligada Irrigation Project (C.I.P.)
2026_CEBMB_146214_1
SE-CHWD4- 02/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
Digapahandi
As Per DTCN
2 documents required · 2 mandatory
₹6,000
₹20,000
Yes
16 Nov 2026
16 Nov 2026
4 Dec 2026
16 Nov 2026
3 Dec 2026
16 Nov 2026
16 Nov 2026 - 3 Dec 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in hard soil of foundation including dressing and leveling the bed & sides of the foundation and disposal of the excavated materials with in initial lead of 50m and one extra lift over 1.50 mtr initial lift etc. | 70.23 | One Cum | 286.5 | ₹20,120.9 |
| 2 | Filling foundation & plinth with sand & well watered & rammed including cost, conveyance, cess, royalty & taxes of all materials with all leads, lifts & delifts etc., complete as per specification & direction of the Engineer- in - charge. | 35.65 | One Cum | 531.8 | ₹18,958.67 |
| 3 | Cement concrete ( 1:3:6) with hard granite broken metal of size 40 mm H.G metal including cost,conveaynce ,cess & royalty of all materials to the site of work with all leads , lifts & delifts etc. complete as per specification & direction of the Engineer- in - charge. | 35.81 | One Cum | 6,381.8 | ₹2,28,532.26 |
| 4 | Fly ash Brick masonry with cement mortar(1:6) in superstructure including cost,conveyance,royalty of all materials to the site of work with all leads ,lifts & delifts etc. complete as per specification & direction of the Engineer-in-charge. | 35.71 | One Cum | 5,892.1 | ₹2,10,406.89 |
| 5 | Reinforcement Cement Concrete (1:2:4) with 12mm size hard granite chips including watering,cost, conveyance, royality , cess and taxes of all materials to the site of work with all leads,lifts, delifts and curing etc., complete as per specification & direction of the Engineer-in-charge. | 38.34 | One Cum | 8,226.1 | ₹3,15,388.67 |
| 6 | Rigid and Smooth Centering and Shuttering for R.C.C. works including false works and dismantling then after casting inlcuding cost of materials to the site of work etc. complete as directed by the Engineer in Charge.
(A) Plinth band & Column base:- | 107.96 | One Sqm | 251.1 | ₹27,108.76 |
| 6.01 | (B) Lintel:- | 17.15 | One Sqm | 584.8 | ₹10,029.32 |
| 6.02 | (C) Beam & Column:- | 132.97 | One Sqm | 1,230.9 | ₹1,63,672.77 |
| 6.03 | (D) Slab & Chajja:- | 146.97 | One Sqm | 775.8 | ₹1,14,019.33 |
| 7 | Supplying, Fitting & placing uncoated HYSD bar rainforcement complete as per drawing & techinical specification. | 38.34 | One Qtl | 9,671.8 | ₹3,70,816.81 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
4.pdf
Tender Documents • 1.76 MB
BOQ_620953.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .