| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-AOC JAYANT NEAR JAI HIND SCHOOL LAXMI MARKET SINGRAULI 486890 MADHYA PRADESH INDIA | SINGRAULI | MADHYA PRADESH | 486890 | ₹15.8 L Quoted ₹13.4 L | L1 | Accepted-AOC AS PER TCR |
| 2 | Rejected-Technical KHETTRY ROAD 27 RAM SWARUP KOLKATA WEST BENGAL 700053 | KOLKATA | WEST BENGAL | 700053 | - | - | Rejected-Technical AS PER SYSTEM GENERATED BOQ |
| Sl No | Description | Qty | Unit | C.S.INDUSTRIES L2 | SARWESHWARI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc:- As per scope of work mentioned in NIT | |||||
| 2.00 | Job A: Packaging, Forwarding, insurance and To & Fro transportation from NCL Amlohri Project to repairer's site.
Job B: Dismantling of the Front Suspension cylinder assembly, steam cleaning of the cylinder barrel, piston rod and all other parts. Carry out pre-inspection and recording data for the preparation of visual & dimensional inspection report.
Job C: Remove the tube and gland and steam cleaning the housing. Mount the cylinder housing on suitable lathe. Alignment of the center-line of the housing bore to the center-line of lathe. Remove all the seal lands. Fill the machined bore with the welding material as per OEM specifications. Machine the wear ring, the buffer seal and the wiper seal grooves according to the dimensions as per housing assembly of the OEM standards. Remove all sharp edges after machining the grooves. Buffing the machined area. Thoroughly clean the front suspension cylinder mounting flange for inspection.This includes labour charges for skilled welder, helper welder, skilled machinist, Machinist helper, skilled honing man, honing helper, skilled polishman, polishing helper. | 4 | Job | 58,000 ₹2.3 L | 45,600 ₹1.8 L |
| 3.00 | Hiring Charges of welding machine. | 40 | day | 1,800 ₹72,000 | 69 ₹2,760 |
| 4.00 | Lathe Machining charge(80Hrs for each suspension). | 320 | Hour | 250 ₹80,000 | 343 ₹1.1 L |
| 5.00 | Honing and Polishing Charges (80Hrs for each suspension). | 320 | Hour | 450 ₹1.4 L | 343 ₹1.1 L |
| 6.00 | Gouging Electrode(Material code-4600011696, 10Kg for each suspension). | 40 | kg | 800 ₹32,000 | 43 ₹1,720 |
| 7.00 | Electrode Durochrome (Material code-4600026801, 10Kg for each suspension). | 40 | kg | 1,000 ₹40,000 | 1,751 ₹70,040 |
| 8.00 | Low Hydrogen Electrode(Material code-4600021349, 10Kg for each suspension). | 40 | kg | 600 ₹24,000 | 4,250 ₹1.7 L |
| 9.00 | Job D: Piston rod, tube, Gland, Head and other Parts and replacement of seal, assembling and testing. De-chroming of piston rod to remove existing chrome plating. Pre-grinding of the piston rod surface to remove dent marks, if any. Hard chrome plating of the pre-ground surface of piston rod by required thickness to achieve size and hardness. Hydrogen de-embrittlement of the chrome plated surface to remove trapped hydrogen. Finish grinding of the hard chrome plated diameter. Rectification of thread on piston rod. Mount the head on Lathe machine to make proper cuts. Fill the head with welding material. The head will be preheated and welded and machine the head as per dimension. Replacement of old seals with new seals. Assembling of the cylinder with seal kits and painting.This includes labour charges for skilled welder,welder helper. | 4 | Job | 81,000 ₹3.2 L | 9,121 ₹36,484 |
| 10.00 | Gouging Electrode(Material code-4600011696, 10Kg for each suspension ) . | 40 | kg | 800 ₹32,000 | 43 ₹1,720 |
Updated dates
Tender Value
₹22.6 L
EMD Value
₹28,200
Closing Date
25 Nov 2025, 11:00 amClosed
GM(EXCV) AMLOHRI
O/O GM(EXCV) AMLOHRI NCL SINGRAULI MP
Repairing of 04 No. front suspension assembly /cylinder (Part No-3356352) of CATERPILLAR make 777E model 100T Dumpers of Amlohri Project.
2025_NCL_347114_1
Aml/Excv/ETN/Web-NIT/25-26/60
Open Tender
Excavation Department Work
72 days
NCL AMLOHRI
Please refer Tender documents.
7 documents required · 7 mandatory
₹28,200
18 May 2026
10 Nov 2025
26 Nov 2025
10 Nov 2025
25 Nov 2025
11 Nov 2025
10 Nov 2025 - 17 Nov 2025
Amount
Scope of Work/Technical Specifications etc:- As per scope of work mentioned in NIT
Job A: Packaging, Forwarding, insurance and To & Fro transportation from NCL Amlohri Project to repairer's site. Job B: Dismantling of the Front Suspension cylinder assembly, steam cleaning of the cylinder barrel, piston rod and all other parts. Carry out pre-inspection and recording data for the preparation of visual & dimensional inspection report. Job C: Remove the tube and gland and steam cleaning the housing. Mount the cylinder housing on suitable lathe. Alignment of the center-line of the housing bore to the center-line of lathe. Remove all the seal lands. Fill the machined bore with the welding material as per OEM specifications. Machine the wear ring, the buffer seal and the wiper seal grooves according to the dimensions as per housing assembly of the OEM standards. Remove all sharp edges after machining the grooves. Buffing the machined area. Thoroughly clean the front suspension cylinder mounting flange for inspection.This includes labour charges for skilled welder, helper welder, skilled machinist, Machinist helper, skilled honing man, honing helper, skilled polishman, polishing helper.
Hiring Charges of welding machine.
Lathe Machining charge(80Hrs for each suspension).
Honing and Polishing Charges (80Hrs for each suspension).
Gouging Electrode(Material code-4600011696, 10Kg for each suspension).
Electrode Durochrome (Material code-4600026801, 10Kg for each suspension).
Low Hydrogen Electrode(Material code-4600021349, 10Kg for each suspension).
Job D: Piston rod, tube, Gland, Head and other Parts and replacement of seal, assembling and testing. De-chroming of piston rod to remove existing chrome plating. Pre-grinding of the piston rod surface to remove dent marks, if any. Hard chrome plating of the pre-ground surface of piston rod by required thickness to achieve size and hardness. Hydrogen de-embrittlement of the chrome plated surface to remove trapped hydrogen. Finish grinding of the hard chrome plated diameter. Rectification of thread on piston rod. Mount the head on Lathe machine to make proper cuts. Fill the head with welding material. The head will be preheated and welded and machine the head as per dimension. Replacement of old seals with new seals. Assembling of the cylinder with seal kits and painting.This includes labour charges for skilled welder,welder helper.
Gouging Electrode(Material code-4600011696, 10Kg for each suspension ) .
Electrode Durochrome (Material code-4600026801, 10Kg for each suspension ) .
Low Hydrogen Electrode(Material code-4600021349, 10 Kg for each suspension ).
Hiring Charges of welding machine.
Piston Tube D-chrome grinding.
Hard Chrome Plating and Polishing
Total impact of GST for the purpose of CTC
C.S.INDUSTRIES (BID ID -1197816)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.61 MB
coc.pdf
Tender Documents • 0.30 MB
annex.pdf
Tender Documents • 0.05 MB
under2.pdf
Tender Documents • 0.02 MB
BOQ_359803.xls
BOQ • 0.27 MB
lob.pdf
Tender Documents • 0.01 MB
Download all tender documents and submit your bid