| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.6 LAccepted-Finance | L1 | Accepted-Finance Lowest Rate Quoated by Shivani Construction and Earth movers | |
| 2 | L2₹41.1 L+₹1.5 L (3.90%)Accepted-Finance TS NO 2 NEHRU NAGAR DHARAPURAM 638656 | TIRUPPUR | TAMIL NADU | 638656 | L2 | Accepted-Finance Highest Rate |
| Sl No | Description | Qty | Unit | Shivani Construction and Earth Movers L1 | Rithan Construction and Earth Movers L2 |
|---|---|---|---|---|---|
| 1.00 | 1. Construction of Community hall building at Venkittipalayam H/o Thoppampatti Panchayat | 1 | nos | - | - |
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation etc complete. | 78.45 | cum | 263 ₹20,632.35 Lowest | 280 ₹21,966 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges etc complete | 31.28 | cum | 5,626 ₹1,75,981.28 Lowest | 5,660 ₹1,77,044.8 |
| 4.00 | Re Filling with excavated earth as oer standard specification etc, complete | 41.04 | cum | 45 ₹1,846.8 Lowest | 90 ₹3,693.6 |
| 5.00 | Collection and supply of gritty Gravel from appd quarry including cost and conveyance of all materials to site and all labour chargesfor filling etc complete | 93.6 | cum | 513 ₹48,016.8 Lowest | 550 ₹51,480 |
| 6.00 | Brick work in cement mortar 1:5 (one cement and five sand) using fFly ash Brick of size 23x11.5x7.5 cms for the following including mixing mortor and all other labour charges etc, complete. | 1 | nos | - | - |
| 7.00 | For Foundation and Basement | 16.61 | cum | 6,185 ₹1,02,732.85 Lowest | 6,195 ₹1,02,898.95 |
| 8.00 | Above Basement -For Super Structure | 30.04 | cum | 6,278 ₹1,88,591.12 Lowest | 6,295 ₹1,89,101.8 |
| 9.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 1 | nos | - | - |
| 10.00 | Centering Below Ground Level | 143.79 | Sqm | 547 ₹78,653.13 Lowest | 590 ₹84,836.1 |
Tender Value
₹40 L
EMD Value
₹40,000
Closing Date
18 Sept 2025, 3:55 pmClosed
BDO BP
BDO Office Dharapuram
Construction of Community Hall Building At Vengittipalayam in Thoppapampatty Panchayat
2025_RDTN_603314_1
Dharapuram Block/NNT-2025-26/1198/2025/
Open Tender
Civil Works
Works
180 days
Dharapuram
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹40,000
Yes
22 Sept 2025
12 Sept 2025
18 Sept 2025
12 Sept 2025
18 Sept 2025
12 Sept 2025
Amount
1. Construction of Community hall building at Venkittipalayam H/o Thoppampatti Panchayat
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation etc complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges etc complete
Re Filling with excavated earth as oer standard specification etc, complete
Collection and supply of gritty Gravel from appd quarry including cost and conveyance of all materials to site and all labour chargesfor filling etc complete
Brick work in cement mortar 1:5 (one cement and five sand) using fFly ash Brick of size 23x11.5x7.5 cms for the following including mixing mortor and all other labour charges etc, complete.
For Foundation and Basement
Above Basement -For Super Structure
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Centering Below Ground Level
Rate for column post
Rate Sunshade
Rate for roof slab,lintel,beam
Supplying and fabrication,placing in position inild steel or ribbed Tor steel and allreinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally st section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
RCC 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour charges etc complete.,
For Foundation and Basement
Above Basement -For Super Structure
Manufacturing , supplying and fixing of stainless steel hand rails for staircase using 50mm dia 304L grade stainless steel pipe of 1.6mm thick a required lacations to a heught of 900m from finished floor level welded to 38mm dia stainless steel pipe post
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three P.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Weathering course in brick jelly lime concrete using 20mm brick jelly pure slaked lime over R.C.C roof slab in the proportion of 32:12.5 and finished with cement mortor 1:4 20mm thick plastering including cost and conveyance of all materials to site and all labour charges etc complete.
Finishing the top of roof with one course of machine PRESSED TILES of size 20cm x 20cm x 2cm approved quality laid in Cement Mortar 1:3 (One Cement and Three M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Supply and fixing PVC Rain water down fall pipes of following dia meter et., complete.
Distembering two coats using OLD or NEW Plastered surface using Oil Bound distember including cost and all labour charges etc complete
Painting two coats over New Plastered surface using Approved Quality of Exterior Emulsion Paint including cost and all labour charges etc complete
Painting two coats over new iron works using synthetic enamel paint including cost and all labour charges etc complete.
Supply and fabrication of Steel Door including cost and conveyance of all materials to work site and all labour charges etc, complete
Doors D
Windows 1
Wiring with 2x1.5(22/0.3) PVC insulated unsheathed SC.cu.conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with T.W. switch box with in flush with wall covered with hylum sheet of 3mm thick with painting of suitable colour for cocealed Light point/fan point [ SD No. 23 ]
Wiring with 2x1.5(22/0.3) PVC insulated unsheathed SC.cu.conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with T.W. switch box with in flush with wall covered with hylum sheet of 3mm thick with painting of suitable colour for cocealed PVC plug point [ SD No. 12 ]
Supply and Run of 2 of 4.00 su.mm PVC insulated SC unsheated FRLS copper conductor of 1100 V grade in 25mm dia GI pipe (class B) suitably bent at both ends with necessary angle iron up right and end support for service connection mains (SD 70)
Supply and fixing of TNEB meter board suitable for 32A single phase service connection with 32A fuse unit (500V) 32A neutral link and earth link (1" x 1/8" copper flat) on TW plank of size 375mm x 300mm x 19mm with supporting TW reepers of 1" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit with 1 No 40 Amp 30 MA Double Pole RCD / RCCB (Lower End) with suitable necessary connection ( S D N o 126 )
Supply and fixing of single box type 4'40W fluorescent fitting complete with electronic ballast with TW round blocks on wall or ceiling with flu tube with PVC unsheathed FRLS Copper leads from terminals to the fitting (SD 88)
Supply and fixing of 1200mm (48") sweep AC ceiling fan complete with stepped electronic regulator with 300mm down rod on the existing clamp SD 106
Provision For EB service charges
Provision for Rain water Harvesting Arrangements
Provision for Name board
Provision for Photograchic charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Rithan Construction and Earth Movers (BID ID -1463534)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .