| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹36.0 L+₹91,980 (2.62%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹39.9 L+₹4.8 L (13.8%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹40.2 L+₹5.1 L (14.6%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹42.7 L+₹7.6 L (21.8%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | The Trikuta Engineer L2 | Fazal Hussain L1 | COUNTRY CONSTRUCTION L3 | VINAY CONSTRUCTION COMPANY L5 | M/S SUKRALA ELECTRICAL WORKS L4 |
|---|---|---|---|---|---|---|---|---|
| 1.01Creation of 250 KVA Sub Station for PHE at WSS Sar-Sabal on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material: | ||||||||
| 1.02 | 11/0.433kV, 250 KVA, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Efficiency Level-2, (Cu wound ) Conforming to IS 1180 as per amendment No 4 of March-2021 and with LV Cable Box having detachable Aluminium Gland plate. | 1 | No | 5,75,000 ₹5,75,000 | 4,50,000 ₹4,50,000 Lowest | 5,10,000 ₹5,10,000 | 7,05,600 ₹7,05,600 | 5,90,000 ₹5,90,000 |
| 1.03 | Gapless Surge Arrestor,9 kV ,10 KA ,LA with polymer housing, Stn. Type | 1 | Set | 7,000 ₹7,000 | 5,000 ₹5,000 | 9,000 ₹9,000 | 4,115 ₹4,115 Lowest | 8,000 ₹8,000 |
| 1.04 | 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 1 | Set | 9,000 ₹9,000 | 12,000 ₹12,000 | 22,000 ₹22,000 | 8,820 ₹8,820 Lowest | 10,000 ₹10,000 |
| 1.05 | 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | 4,500 ₹4,500 | 4,000 ₹4,000 | 6,000 ₹6,000 | 3,900 ₹3,900 Lowest | 7,000 ₹7,000 |
| 1.06 | 185 mm² (2 Ckt) cable,1.1 K V Grade, PVC Insulated Stranded Conductor FRLS type. | 44 | Mtr | 450 ₹19,800 | 400 ₹17,600 | 430 ₹18,920 | 385 ₹16,940 | 250 ₹11,000 Lowest |
| 1.07 | 9 Mtr. Long ST pole (ST-410 SP 33) | 2 | Nos | 18,500 ₹37,000 | 17,000 ₹34,000 Lowest | 19,500 ₹39,000 | 20,580 ₹41,160 | 18,000 ₹36,000 |
| 1.08 | 11KV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 3 | Nos | 450 ₹1,350 | 300 ₹900 | 1,000 ₹3,000 | 280 ₹840 Lowest | 600 ₹1,800 |
| 1.09 | GI Channel/Angle/Flat of sizes including clamps for L.A set/G.O set/Horn Gap | 300 | Kgs | 160 ₹48,000 | 150 ₹45,000 | 140 ₹42,000 Lowest | 147 ₹44,100 | 150 ₹45,000 |
| 1.10 | Galvinized Nuts and Bolts. | 8 | Kgs | 160 ₹1,280 | 150 ₹1,200 | 140 ₹1,120 Lowest | 147 ₹1,176 | 150 ₹1,200 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
3 Apr 2023, 2:00 pmClosed
Executive Engineer JPDCL ED Kathua
Office of the Executive Engineer JPDCL ED Kathua
Creation of 250KVA and 100KVA New Sub Stations along with HT/LT Line for PHE at WSS Sar-Sabal under the jurisdiction of Electric Sub Division Ramkot of OM Division, Kathua(JPDCL) on Turnkey Basis
2023_PDD_208183_1
KED/60 of 2022-23 Dt.13.03.2023
Open Tender
Electrical Works
Turn-key
60 days
kathua
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Executive Engineer JPDCL ED Kathua
₹1 L
16 Jun 2023
15 Mar 2023
5 Apr 2023
15 Mar 2023
3 Apr 2023
15 Mar 2023
15 Mar 2023 - 25 Mar 2023
Amount
Creation of 250 KVA Sub Station for PHE at WSS Sar-Sabal on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
11/0.433kV, 250 KVA, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Efficiency Level-2, (Cu wound ) Conforming to IS 1180 as per amendment No 4 of March-2021 and with LV Cable Box having detachable Aluminium Gland plate.
Gapless Surge Arrestor,9 kV ,10 KA ,LA with polymer housing, Stn. Type
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
11 kV Horn Gap Fuse Set 3 Phase 200A
185 mm² (2 Ckt) cable,1.1 K V Grade, PVC Insulated Stranded Conductor FRLS type.
9 Mtr. Long ST pole (ST-410 SP 33)
11KV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
GI Channel/Angle/Flat of sizes including clamps for L.A set/G.O set/Horn Gap
Galvinized Nuts and Bolts.
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
LT Distribution Box for 250 KVA DTR with MCCB for incommer and SFU's for outgoing Ckt
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Wedege connectors /PG clamps
Danger plate witrh clamps
GI Barbed wire for ani Clambing
3 Ph 4 Wire Trivector meter with CT
Cemetn bottomiing 1:2:4 mix as per REC standerds .5 Cum/pole
Painting of poles Red oxide
Painting of poles Aluminum Paint
Sundary items like Aluminium Lugs, Jumpers , binding tape
Creation of 100 KVA Sub Station for PHE at WSS Sar-Sabal on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
11/0.433kV, 100 KVA, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Efficiency Level-2, (Al wound ) Conforming to IS 1180 as per amendment No 4 of March-2021 and with LV Cable Box having detachable Aluminium Gland plate.
Gapless Surge Arrestor,9 kV ,10 KA ,LA with polymer housing, Stn. Type
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
11 kV Horn Gap Fuse Set 3 Phase 200A
70 mm² (2 CKt) Cable, 1.1 KV grade PVC insulated stranded conductor FRLS type
9 Mtr. Long ST pole (ST-410 SP 33)
11KV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
GI Channel/Angle/Flat of sizes including clamps for L.A set/G.O set/Horn Gap
Galvinized Nuts and Bolts.
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
LT Distribution Box for 100 KVA DTR with MCCB for incommer and SFU's for outgoing Ckt
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Wedege connectors /PG clamps
Danger plate witrh clamps
GI Barbed wire for ani Clambing
3 Ph 4 Wire Trivector meter with CT
Cemetn bottomiing 1:2:4 mix as per REC standerds .5 Cum/pole
Painting of poles Red oxide
Painting of poles Aluminum Paint
Sundary items like Aluminium Lugs, Jumpers , binding tape
Laying of HT line on 9 Mtrs. ST poles with ACSR Weasel Conductor for PHE at WSS Sar-Sabal on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
9 Mtr. Long ST pole (410 SP 33)
GI V cross-arm/Horizontal with top Bracket including clamp
GI Channel x-arm includingclaps and braces
30 mm² ACSR Weasel Conductor
PG Clamps for ACSR weasel conductor
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Galvanized Nuts and Bolts
Danger Plates with Clamp
Anti Climbing Devices with clamps
Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip
Red oxcide Paint
Aluminium Paints
Cement Bottoming 1:2:4 mix as per REC Standrad 0.5 CUM per pole
Aluminium Jointing Sleeves
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
The Trikuta Engineer
COUNTRY CONSTRUCTION
M/S SUKRALA ELECTRICAL WORKS
VINAY CONSTRUCTION COMPANY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .