| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹42,586.23Admitted-Finance | -49.11% | ₹42,586.23 | L1 | Admitted-Finance |
| 2 | L2₹43,523.48Admitted-Finance | -47.99% | ₹43,523.48 | L2 | Admitted-Finance |
| 3 | L3₹49,849.90Admitted-Finance | -40.43% | ₹49,849.90 | L3 | Admitted-Finance |
| 4 | L4₹52,720.23Admitted-Finance | -37.00% | ₹52,720.23 | L4 | Admitted-Finance |
| 5 | L5₹60,109.43Admitted-Finance | -28.17% | ₹60,109.43 | L5 | Admitted-Finance |
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
12 Feb 2026, 6:00 pmClosed
Rajesh Kumar Jangid Executive Engineer
Rajgarh Road Near Bus Stand Taranagar
Annual Rate Contract of Repairing Leakage in Various Size of PipeLine and removal illegal Connection under JEN section Mahatma under Sub Div Taranagar
2026_PHCJA_534785_1
100/2025-26 PHED Div Taranagar
Open Tender
Miscellaneous Works
365 days
Rural Area PHED Sub division Taranagar
EMDTender Fee RISL Charge Registration GST NON PERFORMANCE certificate and attach as per DOC TD
2 documents required · 2 mandatory
₹500
E-Gras 6612 XEN PHED DIV Taranagar
₹12,000
Yes
24 Feb 2026
3 Feb 2026
13 Feb 2026
3 Feb 2026
12 Feb 2026
3 Feb 2026
Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)
In all type Soil AC/PVC/HDPE pipe
Add on above item no. 1 for B.T. Road
Add on above item no. 1 for C.C. Road
Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
Add on above no. 1 item if depth of pipeline is above 3.0 mtr.
Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)
In all type Soil
Add on above item no. 2 for B.T. Road
Add on above item no. 2 for C.C. Road
Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
Add on above no. 2 item if depth of pipeline is above 3.0 mtr.
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)
In all type Soil
Add on above item no. 3 for B.T. Road
Add on above item no. 3 for C.C. Road
Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
Add on above no. 3 item if depth of pipeline is above 3.0 mtr.
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)
In all type Soil
Add on above item no. 4 for B.T. Road
Add on above item no. 4 for CC Road
Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr
Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.
In all type Soil
Add on above item no. 5 for B.T. Road
Add on above item no. 5 for CC Road
Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.
Add on above item no. 5 if depth of pipe line is above 3.0 mtr.
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.
In all type Soil
Add on above item no. 6 for B.T. Road
Add on above item no. 6 for CC Road
Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr.
Add on above item no. 6 if depth of pipe line is above 3.0 mtr
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.
Add on above item no. 7 for B.T. Road
Add on above item no. 7 for CC Road
Add on above item no. 7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr
Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)
In all type Soil
80 mm dia pipe to 100mm
125 mm dia pipe to 150mm
200 mm dia pipe to 250mm
300 mm dia pipe to 350mm
Add on above item no. 8 for B.T. Road
Add on above item no. 8 for CC Road
Add on above item no. 8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).
In all type Soil
80 mm to 110 mm
125 mm to 165 mm
200 mm to 300 mm
Add on above item no. 9 for B.T. Road
Add on above item no. 9 for CC Road
Add on above item no.9 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr
Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).
In all type Soil
80 mm to 100 mm
125 mm to 150 mm
200 mm to 300 mm
350 mm to 450 mm
500 mm to 600 mm
Add on above item no.10 for B.T. Road
Add on above item no.10 for CC Road
Add on above item no.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr
Labour charges for removal of complaint of polluted water supply to the consumers
Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size
In all type Soil
Add on above item no.11.2 for B.T. Road
Add on above item no.11.2 for CC Road
Add on above item no. 11.2 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size
In all type Soil
Add on above item 11.3 for B.T. Road
Add on above item no. 11.3 for CC Road
Add on above item no.11.3 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.
Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.
Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches of required width and gradient for laying and jointing of pipe line including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr. including required all safety provisions etc.: All kinds of soil (PHED BSR Revised 2023/4.1.)
Providing, lowering, laying and jointing in trenches, standard lengths HDPE ISI marked Pipes as per IS-4984: 1995 (amended upto date) with necessary jointing material like mechanical connectors, i.e. thread/ insert joint/ quick release coupler joint/ compression fitting joint or flanged joint and specials jointing pipe by electro fusion welding method, including all taxes , transportation and freight charges, inspection charges, loading/ unloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.), satisfactory hydraulic testing, disinfection etc. complete as per technical specifications and direction of Engineer-in-charge of following class and diameter. (excluding earth work) . Note : Providing and fixing of all requisite specials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately. Supply may be in coil or straight length in 6 M/12 M. HDPE PE-80 PN-6 75 mm dia (PHED BSR Revised 2023/1.4.1.2)
90 mm dia (PHED BSR Revised 2023/1.4.3.)
110 mm dia (PHED BSR Revised 2023/1.4.4.)
125 mm dia (PHED BSR Revised 2023/1.5.1.)
140 mm dia (PHED BSR Revised 2023/1.5.2.)
160 mm dia (PHED BSR Revised 2023/1.5.3.)
180 mm dia (PHED BSR Revised 2023/1.5.4.)
200 mm dia (PHED BSR Revised 2023/1.5.5.)
225 mm dia (PHED BSR Revised 2023/1.5.6.)
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil
De-jointing and removing of HDPE Pipe excavation and refilling of soil after De- laying and De- jointing of pipe line with proper compaction and disposing of all surplus soil as directed with in lead of 30 mtr. This also include Staking pipe with care and transport the same at div/ sub Div. store or as directed by EIC with in the Div. ( Excluding Earth work)
Laying, Jointing, Testing and Commissioning of HDPE pipes of any grade in assorted length with specials, valves etc. with jointing material/ fixing of necessary jointing material like mechanical connector i.e. thread/ insert joint/quick release coupler joint compression fitting joint or flanged joint and jointing pipe in proper position and jointing of all specials by butt fusion / electro fusion welding method, including local handling and transportation from PHED store and then refilling of soil with proper compaction and disposing of all surplus soil as directed with in a lead of 30 mtr as per satisfaction of EIC. (Rates are Exclusive of Earth Work and jointing materials)
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
TD100.pdf
Tender Documents • 3.24 MB
BOQ_952910.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid