Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹6.3 L
Closing Date
24 Sept 2026, 12:00 pm2d left
S.E., VNS CIRCLE, PWD, VARANASI
S.E., VNS CIRCLE, PWD, VARANASI
Sadalpur Ramkhelavan bind ke jamin Sadalpur kutiyan hote hue Ramsuhavan bind ke makan se Sagahat pitch road va Mirapur Lathiya pitch road se hote hue Kadipur barder se Mahatma J.F.. Public School va Ashapur Barder tak nirman ka karya
2026_CEUVZ_1184163_11
4158/183COM-VNS CIRCAL PWD VARANASI
Open Tender
Civil Works - Roads
Fixed-rate
180 days
VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.3 L
S.E., VNS CIRCLE, PWD, VARANASI
11 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with approved material obtain from Borrow pits with all lift UPTO 1.5M, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table-300.1 and 300.2 with a lead up to 1000m as per Technical Specification Clause 301.5 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 8,175 | Cum | 56 | ₹4,57,800 |
| 2 | Cement Treated Subbase / Providing, laying and sperading Material on a prepared sub grade, adding cement @2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. / Quantity of cement as 2 percent of quantity by weight for sub base.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 846.86 | Cum | 2,678 | ₹22,67,891.08 |
| 3 | Cement WBM Grading III / Providing, laying and spreading Material on a prepared sub base, cement @4 by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to acheive the desired unconfined compressive strength and to form a layer of sub base/base.. I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 769.88 | Cum | 3,128 | ₹24,08,184.64 |
| 4 | Providing and applying tack coat with Bitumen (VG-10) using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Air compressor as per Technical Specification Clause 503. I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 7,698.75 | Sqm | 24.6 | ₹1,89,389.25 |
| 5 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 11.2 mm aggregates using penetration grade bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with three wheel static roller 80-100 kN capacity, finished to required level and grades to be followed by seal coat of Type-C as per Technical Specification Clause 508. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 7,698.75 | Sqm | 223 | ₹17,16,821.25 |
| 6 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 7,698.75 | Sqm | 85 | ₹6,54,393.75 |
| 7 | Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300.1 and 300.2 with a lead upto 1000m as per Technical Specification Clause As per MORD 303.1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1,500 | Cum | 62 | ₹93,000 |
| 8 | Providing and laying 350mm dia NP-3 RCC hume pipe medium duty confirm to IS 458:2003 including collars/spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 cement :2 fine sand) including testing of joints, all taxes, transportation charges & contractor profit etc. complete. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 45 | Rm | 1,600 | ₹72,000 |
| 9 | PART B
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. | 1 | Job | - | - |
| 9.1 | 1st year - maintainance cost 0% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST. | 1 | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.42 MB
T-2.pdf
Tender Documents • 0.47 MB
BOQ_2228002.xls
BOQ • 0.29 MB
SUDHIPATRA.pdf
PDF • 0.17 MB
4328.pdf
PDF • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .